PROJECT PORTFOLIO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
the <strong>PROJECT</strong> <strong>PORTFOLIO</strong> of<br />
Office: 7oo1 McDivitt Dr, Bakersfield, Ca 93313<br />
Website: www.jtsmodular.com<br />
Phone: (661) 835-927o
CONTACT US<br />
Adam Engler<br />
vp business development<br />
(661) 578-2285<br />
adame@jtsmodular.com<br />
tom giampietro<br />
central, northern ca<br />
(559) 318-0833<br />
tomgiampietro@comcast.net<br />
david albee<br />
southern ca<br />
(661) 904-8944<br />
davea@jtsmodular.com<br />
office<br />
(661) 835-9270<br />
7001 McDivitt Drive<br />
Bakersfield, Ca 93313<br />
www.jtsmodular.com<br />
visit us online<br />
www.jtsmodular.com
Table of Contents<br />
2<br />
5<br />
6<br />
44<br />
Featured Article<br />
About us<br />
Projects<br />
Wasco Union High School<br />
San Gorgonio Pass Campus<br />
Huron Elementary School<br />
Valley Oaks Charter School<br />
Kingsburg High School<br />
Goldenrod Elementary School<br />
Oro Grande Elementary School<br />
Grimmway Academy School<br />
Oakhurst Elementary School<br />
Woodrow Wallace School<br />
San Jose Elementary School<br />
From plant to site<br />
Providence High School<br />
Barstow College School<br />
Riverside Prep School<br />
Liberty Intermediate School<br />
Temescal Canyon High School<br />
Carl Smith Middle School<br />
Einstein Bros Bagels<br />
Transbay Transit Terminal<br />
Wellness Center @ Jordan High School<br />
Jefferson Elementary School Health Clinic<br />
Gage Northeast Community Clinic<br />
CSU Bakersfield Engineering Building
JTS Modular featured in<br />
The Modular Equalizers<br />
JTS Modular has emerged as one of California’s top modular-construction<br />
firms by matching the results of site-built construction.<br />
By Lisa Ryan<br />
Modular buildings are hallmarks of most campuses, providing permanent, high-quality, cost-efficient solutions<br />
for schools and companies in need of additional space. And since its inception in 1998, JTS Modular, Inc. has<br />
cornered this market in Southern California.<br />
The company, based in Bakersfield, California, was formed as an affiliate of JTS Construction, a general contractor specializing<br />
in school construction. “JTS identified a significant quality gap between what it was building as a conventional-building<br />
contractor and what modular-building manufacturers were building,” company president Phillip Engler says. “We asked<br />
ourselves why school districts would demand such high quality in their conventional buildings but accept such low quality in<br />
their modular buildings. We discovered that the answer was that school<br />
districts didn’t have a choice; there was a lack of modular manufacturers<br />
in the market building to those exacting standards.”<br />
JTS aims to provide its clients with permanent modular structures that<br />
have the same 50-year life span and architectural, structural, mechanical,<br />
and electrical design elements of conventionally built structures. The firm<br />
also oftentimes couples its innovative work with JTS Construction to<br />
provide a complete project solution for customers.<br />
“[The difference] between modular construction and conventional<br />
construction is only in the process of construction,” vice president of sales<br />
and marketing Adam Engler says. “For us, the product is the same in either<br />
case—both in quality and aesthetics.” Modular construction also saves the<br />
owner 30–50 percent and cuts the construction time in half, he adds.<br />
Thanks to its strong reputation, the company easily acquires both new<br />
and repeat business, working with an array of different schools across California. “The success of the company is really<br />
pretty simple,” Phillip says. “We find out what the customer really wants; customize a plan to deliver that; and keep our<br />
promises regarding quality, timeliness, and cost.”<br />
One of the firm’s recent projects called for a partnership with JTS Construction to build a new elementary campus for 850<br />
students in the Kerman Unified School District. The project entailed 46,000 square feet of permanent modular classrooms,<br />
a 10,000-square-foot permanent modular administration building, and a 13,000-square-foot multipurpose building. “We<br />
designed the modular buildings and matched the modular administration building to the architect’s original design,” Adam
American Builders Quarterly<br />
top 4 advantages of modular<br />
engineering in an educational setting<br />
The school districts save 30-50% on construction costs because<br />
materials are used more economically and construction time<br />
is cut in half compared to conventional engineering.<br />
The projects are aesthetically pleasing, oftentimes passing for<br />
conventional buildings.<br />
Modular engineering incorporates and results in innovations<br />
including concrete floors, photovoltaic solar paneling, and<br />
slab-on-grade buildings, to name a few.<br />
Contemporary modular construction is so high-quality that<br />
structures built using it have a 50-year lifespan equal to those<br />
done with site-built construction<br />
Bakersfield, California<br />
1998<br />
80-120<br />
Innovative, high-quality, custom modular solutions<br />
1<br />
2<br />
3<br />
4<br />
jts modular at a glance<br />
location<br />
founded<br />
employees<br />
specialty<br />
says, noting that they were able to save<br />
the school district $5 million.<br />
JTS has also worked extensively to<br />
provide modular solutions on multiple<br />
projects For the Oro Grande School District.<br />
“Oro Grande is a perfect example of how<br />
our projects develop into long-term<br />
relationships,” Phillip says. “We consider<br />
it the highest form of compliment to be<br />
invited to do another job for a customer.”<br />
In addition to classroom wings and other<br />
modular facilities, the company also has<br />
recently completed construction on four<br />
complete campuses. The projects included<br />
charter schools, public schools, and a<br />
community college campus, and they were<br />
completed over the span of a year, each of<br />
them ready in time for a fall 2011 opening.<br />
Reflecting on its success in the modular<br />
field, the company says it’s most proud<br />
of the fact that many people can’t even<br />
tell its buildings are modular. “Our<br />
favorite comment — and one that we<br />
hear on nearly every job we do — is that<br />
our buildings are indistinguishable<br />
from conventional site-built structures,”<br />
Adam says. “Very often we hear, ‘I’ve<br />
been by this building so many times and<br />
would have never guessed it was a modu-<br />
lar building.’”<br />
continued<br />
3
Modular originally began as a division of JTS Construction over a decade ago. The catalyst for our origins was a<br />
project involving opening a school which was lacking cooperation for the modular manufacturer and their failure to deliver<br />
their product on time. Once it got there, it was a “crappy” building. Our challenge at that time was simple for us: provide a<br />
higher quality, more attractive, custom-built modular building on-time and on budget. In other words, provide the client<br />
what they needed when they needed it, within budget. In their words, “excellent customer service!”<br />
Our focus then, as it is now, is on you, the customer. We do not manufacture cheap, standard box-like buildings by the<br />
hundreds. Our staff is dedicated to matching the quality, longevity and appearance of site-built buildings while achieving<br />
dramatic cost savings and timely delivery through the efficiencies of factory building systems.<br />
We don’t stand still in our pursuit of the new generation of permanent, modular buildings. Our designs include many<br />
innovations developed by us. It is an exciting time in our industry; the marketplace now realizes that permanent, modular<br />
structures are truly the affordable, high quality building system of the future. Come see our product line for yourself. Plant<br />
tours and student field trips are always encouraged. At JTS Modular, we will continue to lead the modular industry to newer<br />
and higher standards of excellence.<br />
there is no<br />
better way<br />
to build than<br />
JTS Modular.<br />
5
Projects<br />
classrooms, restrooms, concessions, administration buildings,<br />
full campuses, kindergarten buildings, multipurpose buildings,<br />
computer labs, science labs, commercial buildings, medical clinics<br />
Wasco High School • Mount San Jacinto College-San Gorgonio Pass Campus<br />
Huron Middle School • Valley Oaks Charter School • Kingsburg High School<br />
Whatever your needs, we are ready,<br />
willing and able to help you fulfill your vision.<br />
We want to be more than just your contractor.<br />
We want to be your partner.
wasco high school<br />
[WASCO, CALIFORNIA]<br />
wasco union high school district<br />
nine<br />
[30' x 32']<br />
classrooms<br />
7
San Gorgonio Pass<br />
[BANNING, CALIFORNIA]<br />
mount san jacinto college<br />
four [30' x 32'] classrooms
five monoslope classrooms<br />
huron middle school<br />
[HURON, CALIFORNIA]<br />
coalinga-huron joint unified sd<br />
9
six [24' x 40'] classrooms<br />
one [12' x 40'] utility room<br />
one [12' x 40'] restroom<br />
valley oaks charter SCHOOL<br />
[BAKERSFIELD, CALIFORNIA]<br />
kern county superintendent of schools
kingsburg high school<br />
[KINGSBURG, CALIFORNIA]<br />
kingsburg joint union high school district<br />
one [24' x 40'] concession<br />
11
Goldenrod Elementary • Oro Grande Elementary • Grimmway Academy<br />
Oakhurst Elementary • Woodrow Wallace Elementary • San Jose Elementary<br />
Providence High • Barstow Community College • Riverside Preparatory<br />
We are extremely proud of our track record of customer satisfaction.<br />
In fact, most of our business comes from past customers and referrals.
goldenrod elementary<br />
[KERMAN, CALIFORNIA]<br />
kerman unified school district<br />
four classroom wings<br />
one administration building<br />
one multipurpose building<br />
one kindergarten building<br />
two baseball fields<br />
one concession/restroom<br />
88 KW photovoltaic solar<br />
13
goldenrod elementary<br />
[KERMAN, CALIFORNIA]<br />
kerman unified school district<br />
one concession
goldenrod elementary<br />
[KERMAN, CALIFORNIA]<br />
kerman unified school district<br />
one 9,749 square foot administration building<br />
15
goldenrod elementary<br />
[KERMAN, CALIFORNIA]<br />
kerman unified school district<br />
one multipurpose building
[ORO GRANDE, CALIFORNIA]<br />
ELEMENTARY oro grande school district CAMPUS<br />
al ft 2 ]<br />
tal ft 2 ]<br />
oro grande elementary<br />
[oro grande, california]<br />
phase one<br />
three [48' x 40']<br />
multi-use buildings<br />
five [24' x 40']<br />
classrooms<br />
one [36' x 40'] triplex<br />
one [30' x 32']<br />
restroom<br />
phase two<br />
fifteen<br />
[36' x 40'] classrooms<br />
one<br />
[40' x 48'] bandroom<br />
two [30' x 32']<br />
restrooms
GRIMMWAY ACADEMY<br />
[ARVIN, CALIFORNIA]<br />
grimm family education foundation<br />
eighteen classrooms<br />
[two 60' x 70' & one 60' x 90']<br />
three [12' x 40'] restrooms<br />
19
GRIMMWAY ACADEMY<br />
[ARVIN, CALIFORNIA]<br />
grimm family education foundation<br />
three [12' x 40'] restrooms
GRIMMWAY ACADEMY<br />
[ARVIN, CALIFORNIA]<br />
grimm family education foundation<br />
one [60' x 90'] administration building<br />
21
four classrooms buildings<br />
[includes restrooms, office space]<br />
one [40' x 84'] admin/library<br />
one [24' x 30'] restroom<br />
oakhurst elementary<br />
[OAKHURST, CALIFORNIA]<br />
bass lake joint union elementary sd
woodrow wallace elementary<br />
[LAKE ISABELLA, CALIFORNIA]<br />
kernville union school district<br />
four [30' x 32'] classrooms<br />
two [30' x 32'] science rooms<br />
one [30' x 32'] office<br />
one [30' x 32'] restroom<br />
one [30' x 32'] computer lab
SAN JOSE ELEMENTARY<br />
[POMONA, CALIFORNIA]<br />
POMONA UNIFIED school district
one [12' x 40'] restroom<br />
one [60' x 40'] science lab<br />
one [84' x 40'] science lab<br />
one [84' x 40'] locker room<br />
one [96' x 40'] library<br />
one [36' x 40'] kindergarten<br />
one [96' x 40'] building with restroom<br />
27
providence high<br />
[BURBANK, CALIFORNIA]<br />
Modular Science Complex<br />
one [24' x 120'] science lab<br />
one [24' x 72'] science lab
arstow college<br />
[BARSTOW, CALIFORNIA]<br />
california community colleges<br />
one [24' x 40'] administration
iverside prep school<br />
[ORO GRANDE, CALIFORNIA]<br />
oro grande school district<br />
twenty-four [30' x 32'] classrooms<br />
one [60' x 64'] music room<br />
one [32' x 30'] restroom<br />
one [32' x 45'] administration building<br />
one [32' x 45'] food service building<br />
one [32' x 90'] band room<br />
31
Liberty Intermediate School • Temescal Canyon High School • Carl Smith Middle School<br />
Whatever your needs, we are ready,<br />
willing and able to help you fulfill your vision.<br />
we want to be more than just your contractor.<br />
we want to be your partner.
liberty INTERMEDIATE<br />
[KERMAN, CALIFORNIA]<br />
kerman UNIFIED school district<br />
one [12' x 40'] restroom<br />
33
one [24' x 40'] restroom
TEMeSCAL CANYON HIGH SCHOOL<br />
[LAKE ELSINORE, CALIFORNIA]<br />
lake elsinore UNIFIED school district<br />
35
Carl Smith Middle School<br />
[TERRA BELLA, CALIFORNIA]<br />
TERRA BELLA UNION school district<br />
two classroom/restroom buildings<br />
37
Einstein Bros Bagels • Transbay Transit Terminal<br />
Everything from the<br />
electrical infrastructure and<br />
mechanical systems<br />
to the final finish<br />
comes together perfectly<br />
in the field, making for<br />
a professionally assembled system<br />
better than site-built projects.
one [30' x 30'] building<br />
einstein bros bagel co<br />
[HAYWARD, CALIFORNIA]<br />
california state university east bay<br />
39
TRANSBAY TRANSIT TERMINAL<br />
[SAN FRANCISCO, CALIFORNIA]<br />
transbay joint powers authority<br />
one [144' x 60'] bus station<br />
one [30' x 32'] break room building<br />
one [30' x 42'] security/custodial building
Wellness Center @ David Starr Jordan High • Northeast Community Clinic @ Gage Middle<br />
Jefferson Elementary Health Clinic • Cal State University, Bakersfield Engineering Building<br />
JTS is committed to<br />
customer care and satisfaction.<br />
Your project is customized<br />
to meet your needs<br />
and will include<br />
energy efficient buildings<br />
that exceed California<br />
Title 24 requirements.
wellness center at<br />
david starr jordan high<br />
[LOS ANGELES, CALIFORNIA]<br />
los angeles UNIFIED school district<br />
one [40' x 48'] building<br />
43
from plant...<br />
one [40' x 48'] building
...to site<br />
northeast community clinic<br />
at henry t. gage middle school<br />
[LOS ANGELES, CALIFORNIA]<br />
los angeles UNIFIED school district<br />
45
from plant...
...to site<br />
jefferson elementary at<br />
health services clinic<br />
[REEDLEY, CALIFORNIA]<br />
kings canyon UNIFIED school district<br />
one [40' x 120'] building<br />
47
from plant...
...to site<br />
csu, bakersfield<br />
engineering complex<br />
[BAKERSFIELD, CALIFORNIA]<br />
california state university<br />
49
check out our project page here:<br />
www.jtsmodular.com/projects.html<br />
They are one of the<br />
best in the state<br />
and they have done a<br />
fantastic job<br />
in building our design.<br />
I know the community will be<br />
blown away with the look.<br />
It’s impressive.<br />
[http://www.reedleyexponent.com]<br />
Mark Garza<br />
Director of Construction<br />
Kings Canyon Unified sd<br />
after going with jts modular’s<br />
permanent modular buildings,<br />
why would i ever go back to site-built?<br />
the quality is just as good<br />
-if not better-and it is<br />
significantly<br />
less expensive<br />
than conventional construction.<br />
James Foley<br />
assistant superintendent<br />
Kerman unified sd