1.- DEVELOPMENTS.<br />

There are two areas of work:<br />

• Residential<br />

The scope of the residential development includes the execution of different vials of access and<br />

common spaces, which can be public or private, specifically related to the development of<br />

residential areas, where characteristic environment is defined by the predominant presence of<br />

housing, in their very different types possible, conforming immediately to these habitat and the<br />

network of public spaces around them.<br />

The concept of this type of actions provides adaptation and harmony of the urbanized space<br />

depending on the building type which is confined, from the single‐family building isolated in<br />

plot until collective residential complexes, usually oriented to the coexistence of a road traffic<br />

eminently local with varying degrees of pedestrian presence in the common spaces. All<br />

equipped with functional and aesthetic, appropriate conditions accompanied with the<br />

necessary infrastructure and equipment consistent with the location: different floorings,<br />

residential lighting, street furniture, as well as the introduction of all the networks of basic<br />

infrastructure for providing services to the residential complex.<br />

Development of the waterfront and calle Marqués de la Hermida in Santander (Cantabria).


• Industrial<br />

Under the heading of industrial urbanization collects execution and conditioning of all the<br />

category of open spaces associated with the articulation of areas of movement, access and<br />

interconnection interior areas and Industrial enclosures, whether it is an isolated settlement or a<br />

complex which welcome multiple industries, and that will be associated with the development<br />

of its activity with different purposes (circulation (, parking, storage, etc.). Namespaces thus<br />

identified are usually some particular needs arising from the circumstances of its activity or in<br />

anticipation of its future implementation, so demand requirements specific in terms of the<br />

allocation and sizing of its road infrastructure and services, bringing otherwise characteristics<br />

prevail where functionality and its subordination to the production environment.<br />

Industrial area of Marina and Medio Cudeyo in Solares (Cantabria).<br />

1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong>


1.1. RESIDENCIAL DEVELOPMENTS<br />

1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

TOWN HALL SQUARE OF TORRELAVEGA (CANTABRIA)<br />

Performance surface: 10.000 m²<br />

Year of implementation: 2003<br />

Execution time :<br />

8mois<br />

Development of the square of the city of Torrelavega on a previously executed underground<br />

parking. The works consist of the implementation of road, pavement and sidewalk and plaza,<br />

borders cladding slabs of slate, gardening and trees, street furniture and public lighting.<br />

Town hall square of Torrelavega (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

DEVELOPMENT OF SECTOR 4 IN THE MUNICIPALITY OF SANTANDER (CANTABRIA).<br />

Performance surface: 353.500 m²<br />

Year of implementation: 2005<br />

Execution time :<br />

24 months (per phase)<br />

Construction of the urbanization of the 4 Sector of the General Plan of urban planning of the<br />

municipality of Santander. It includes the construction of roads for vehicular and pedestrian,<br />

traffic, the implementation of the necessary infrastructure for drainage facilities and sanitation,<br />

supply of water, electricity, telephone and gas, lighting of the vials, as well as landscaping of the<br />

free spaces and the placement of furniture. The road network is basically a network mallada,<br />

consisting of mutually orthogonal vials with a total length of 5.77 kms.<br />

Development of Sector 4 in Santander (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

ATLANTIC PARK OF THE VALLEY OF THE FLAMES IN SANTANDER (CANTABRIA).<br />

Performance surface: 296.091 m²<br />

Year of implementation: 2006<br />

Execution time :<br />

24 months<br />

Construction of an urban park, which simulates the Atlantic coasts representing the rich landscape<br />

and the diversity of vegetation of the Atlantic climate. It has a surface of 296.091,12 m2, of which<br />

12<strong>2.</strong>821,70 m2 are green areas, 41.041,30 m2 are area of wetland vegetation, 51.617 m2 of<br />

bituminous mixture (roads, rail bike and footpaths) and 16.616 m2 of pavement pieces of granite.<br />

Built a stage for performances of <strong>2.</strong>007,28 m2, a Lake of 9.003,63 m2 and a building for cafeteria<br />

and services outdoor play areas, both children as for senior citizens, and three zones with up to<br />

360 vehicles. 6 12,000‐volt power lines and one of 55,000 volts is soterraron. It gave the Park's<br />

lighting, irrigation, drainage and sanitation services.<br />

Atlantic Park in the Valley of the flames in Santander (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong>


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

TOWN HALL SQUARE OF SANTANDER (CANTABRIA)<br />

Performance surface: 6.293 m²<br />

Year of implementation: 2009<br />

Execution time :<br />

3months<br />

Reordering and paving of the square of the Town Hall of Santander to get ordering the area and<br />

improve the existing qualities it is one of the most unique places in Santander. The works consist of<br />

the implementation of firm, pavements and kerbs of sidewalk and plaza, cladding slabs of slate,<br />

gardening and trees, public lighting and urban furniture.<br />

Town hall square of Santander (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

STREET MARQUÉS DE LA HERMIDA, SANTANDER (CANTABRIA)<br />

Performance Surface : 34.030 m²<br />

Year of implementation : 2014<br />

Execution time :<br />

8months<br />

Resurfacing for sharing current port use and pedestrian on the waterfront of the Malian basin.<br />

Between this area and the calle Marqués de la Hermida developed for use as car park pavement<br />

interspersed with a few green spaces delimited by walls of concrete that delimits a zone bike lane<br />

between the two areas. The rest of the packaging consisted of the delimitation of a green area<br />

between the parking and the street Marqués de la Hermida also solved leaving the bus stops; and<br />

another area for sports (basketball courts). Woodland and parkland serves as a mattress and<br />

separation of strong traffic that is seen under the area. Developed an area for use as<br />

complementary to the performance parking for 186 seats.<br />

Street Marqués de la Hermida Santander (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

ROAD REALIGNMENT IN MUSKIZ (BIZKAIA)<br />

Performance Surface : 15.225 m²<br />

Year of implementation : 2014<br />

Execution time :<br />

7months<br />

Road realignment in the N‐634 from its intersection with the local road BI‐3796 (Casa de Cultura<br />

area) to its intersection with the source old Avenue (zone St. John) with a length of 680 meters.<br />

The actions carried out are: general management and integration into the urban fabric through an<br />

elliptical roundabout, definition of 6 zebra crossings located on the N‐634 along the leg and new<br />

sidewalks with sufficient amplitude, to favour the pedestrian paths, renovation, replacement and<br />

expansion of existing services and execution of gardening and urban furniture.<br />

Road realignment in Muskiz (Bizkaia).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong>


1.1. INDUSTRIAL DEVELOPMENTS<br />

1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

INDUSTRIAL ESTATE BUSINESS PARK BESAYA (REOCÍN)<br />

Performance Surface : 827.980 m²<br />

Year of implementation : 2006<br />

Execution time :<br />

29 months<br />

Construction of an Industrial Estate of 827.980,00 m2, of which destined to productive soil is<br />

337.200,00 m2, divided into 87 parcels, road 48.700,00 M2 green zones 41<strong>2.</strong>780,00 m2 and<br />

29.300,00 m2 to various applications. Also they have built 11 processing centres, a network of<br />

supply from 4.300,00 ml, a network of sanitation of faecal and rain 7.300,00 ml, a deposit of<br />

<strong>2.</strong>500,00m3anda43.00mlVaultlocatedonthemainaccesstotheestateroadtosaveapathof<br />

step, in addition to a main road for access to the estate of 1.500,00 ml a secondary access 1.170,00<br />

ml vial and a bicycle lane and pedestrian promenade of 3.370,00 ml.<br />

Business park Besaya en Reocín (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

INDUSTRIAL ESTATE MARINA Y MEDIO CUDEYO (CANTABRIA)<br />

Performance Surface : 1.330.232 m²<br />

Year of implementation : 2010<br />

Execution time :<br />

44 months<br />

Performance comprehensive strategic production the project unique of Regional interest (PSIRI)<br />

area Marina de Cudeyo ‐ Medio Cudeyo. It is divided into functional areas, designed to<br />

accommodate both logistics companies such as industrial, business and commercial activities<br />

with a total area of 1.330.232 m².<br />

As significant data, executed more than <strong>2.</strong>215.000,00 m3 of excavation in deforestation;<br />

1.960.000,00 m³ of embankment formation; 40.000,00 m³ of demolitions; 450.000,00 m² of<br />

refining of slopes; 175.000,00 m² of building (structural and secondary) roads, service roads and<br />

parking lots; 215.000,00 m² of green areas and 620 you treatment planting of trees.<br />

Industrial estate Marina y Medio Cudeyo (Cantabria).


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

As singular structures were the overpasses on the arroyo Refriego and FEVE line with a length of<br />

40 meters and walls of reinforced earth Board.<br />

In terms of services networks, 2 wells pumping and 1 tank of drinking water of 3,000 m³; have<br />

been almost 35,000 ml of sanitation and drainage, with 6 tanks storm, driving 17,500 ml of<br />

water supply and fire protection; 14,000 ml of channeling of MV/LV and en (47,000 ml of<br />

medium voltage cable 0.6/1, 12/20 and 36/66 Kv); 5,000 ml of network of public lighting with<br />

201 points of light (columns); 16.800 ml of telecommunications network; 3.401 ml of gas<br />

network; 1,649 ml of driving services under the motorway A‐8 and FEVE tracks.


1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

OTHER INDUSTRIAL DEVELOPMENTS<br />

Industrial estate en Ambrosero (Cantabria).


Industrial estate en Requejada (Cantabria).<br />

1.‐ <strong>Developments</strong>


Catalogue<br />

<strong>Developments</strong><br />

Industrial estate en Santoña (Cantabria).


WHEREWEARE?<br />

Constructión and Services, S.A.<br />

Address: Paseo Julio Hauzeur, 45 B<br />

39300 Torrelavega (Cantabria), Spain<br />

e-mail: siecsa@siecsa.com<br />

web:<br />

www.siecsa.com<br />

Phone: (+34) 942 89 24 11


Cantabria Spain Morocco<br />

Paseo Julio Hauzeur, 45 Bajo | CP 39300 | TORRELAVEGA (Cantabria) | Tél. (+34) 942 892 411<br />

www.siecsa.com | e‐mail: siecsa@siecsa.com<br />

SIECSA, Construction and Services, S.A.