13.12.2016 Views

finalised brochure.compressed

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT OVERVIEWS<br />

Residential<br />

Infrastructure<br />

Industrial<br />

Education<br />

Student Accommodation<br />

Renewables<br />

Modular Solutions<br />

Power & Utility<br />

Remote Solutions<br />

International


COMPANY INFORMATION<br />

Barratt Energy<br />

Electrical Engineers &<br />

Contractors<br />

With a London Office to assist with the<br />

design and development activities.<br />

Throughout the design and installation<br />

The Barratt team started in electrical<br />

engineering and collectively have an<br />

extensive range of experience which<br />

includes all types of industrial projects,<br />

phase Barratts are well known for their<br />

ability to work with the project teams in<br />

delivering schemes on time and on<br />

budget.<br />

paper, water, waste, automotive and<br />

steel.<br />

Our skills in designing and engineering<br />

jobs, which fulfill our clients financial and<br />

Our head office is located in Wilmslow<br />

near Manchester from where we<br />

quality requirements, generates repeat<br />

business for ourselves.<br />

undertake projects throughout the UK and<br />

Europe.


ORGANOGRAM


OUR AIMS<br />

Aim of today<br />

Track record<br />

What we deliver<br />

To look forward to ways of collaborating<br />

Previous success has been achieved, in<br />

Cost certainty through either consultant<br />

with Mishigas and<br />

particular on overseas projects, where the<br />

partnership or directly with your end client<br />

their stakeholders to find the most<br />

end client required the leading edge<br />

requirements through design model<br />

acceptable and economical solution to<br />

framework; working with bluechip<br />

feasibility & understanding, presentation<br />

modern resource and generation<br />

organisations like Siemens, BAE<br />

and economics.<br />

schemes.<br />

Systems, Degremont etc.<br />

What we offer<br />

Together Barratt would offer complete<br />

commercial modelling with building<br />

services engineering solutions to provide<br />

In places as far afield as Qatar, Saudi<br />

Arabia and Lybia, they have all proved a<br />

great success!<br />

Delivery of a robust and practical<br />

engineering solution incorporating the<br />

latest technology, sustainability and<br />

energy efficiency.<br />

modern environmentally efficient design<br />

to the Processing sectors.<br />

Our broad range of experience ensures<br />

that we are able to effectively contribute<br />

Trust – Commitment – Passion ­ Teamwork<br />

to all aspects of the design, procurement,<br />

construction and handover of each<br />

project.


KEY SERVICES<br />

Electrical<br />

Mechanical<br />

Utilities<br />

Lighting Systems<br />

Heating & Ventilation<br />

Utility Feasibility Study<br />

Mains & Power Distribution<br />

Air Conditioning<br />

Determination of Electrical Loadings<br />

Earthing Installations<br />

Concept & Detailed Design<br />

Optimum design and installation<br />

Power Generation<br />

Power Supplies<br />

Control Panel & Switchgear<br />

High Voltage System<br />

CHP Viability Evaluation<br />

Biomass Boilers<br />

Water Treatments Plants & Processing<br />

proposals<br />

Supply applications<br />

Utility Capital Investment Opportunities<br />

Energisation<br />

Emergency Lighting & Fire Alarm<br />

Systems<br />

Technical<br />

Commissioning<br />

Navigating to the most economic and<br />

CCTV<br />

painless utility solutions.<br />

Energy Management<br />

AV/Smart Controls<br />

Telephony and Data<br />

Intruder<br />

Access Control<br />

Energy Efficiency


PROJECT OVERVIEW<br />

Residential


RESIDENTIAL<br />

Erie Basin<br />

Manchester<br />

205 No Apartments (2 Blocks)<br />

10 No Floors / 19 No Floors<br />

Princess Dock<br />

Liverpool<br />

201 No Apartments<br />

25 No Floors<br />

Granary Wharf<br />

Leeds<br />

355 No Apartments (2 Blocks)<br />

11 No Floors / 19 No Floors


RESIDENTIAL services<br />

Erie Basin<br />

Princess Dock<br />

Granary Wharf<br />

HV substation<br />

Metering within apartments<br />

Central BMS and door access/security<br />

Fire Alarm BS55839 Pt 6 mixed use<br />

system<br />

Sprinkler to tower<br />

Private HV network from MDHC manage<br />

by landlord<br />

Metering and distributed LV services<br />

Lighting controls landlord areas<br />

Fire alarms B55839 Pt 1<br />

Sprinkler system<br />

Distribution from British<br />

Waterways. Resident tower/block and<br />

double tree hotel<br />

Package plant room roof top location<br />

(built off site)<br />

Fully distributed LPHW heating systems<br />

with vertical architectural heat emitters<br />

Smoke vent powered to escape corridors<br />

Car smoke ventilation<br />

Services to A3 retail (ground floor)<br />

AV/TV fully distributed system—BAKNET<br />

integrated (Including car park access)<br />

Package plant room boiler plant pumped<br />

inverter water supply ­ constant pressure<br />

BMS, lift management<br />

Access entry and security<br />

Plant rooms<br />

Air condition and package plant<br />

Full kitchen extract system and carbon<br />

filters compliant to network requirement,<br />

platform at level 4 adjacent to build<br />

Pumped water and tanks (stand­by)<br />

Full AV/TV distributed systems –home<br />

office facilities<br />

Railway arch car parking 300 cars and<br />

associated smoke shut fans and<br />

entry/security systems


PROJECT OVERVIEW<br />

Infrastructure


INFRASTRUCTURE<br />

Manchester Tram Station<br />

Manchester<br />

Burnley Bus Station<br />

Burnley<br />

National Express<br />

Birmingham


INFRASTRUCTURE services<br />

Manchester Tram Station<br />

Burnley Bus Station<br />

National Express<br />

Prepared an energy strategy to reduce<br />

Burnley council requested an eco<br />

Provided tram stations and workshops<br />

lighting cost to bus depot throughout the<br />

designed bus station, with a package<br />

along with the control centre.<br />

Midlands with a view to a roll out<br />

plant room.<br />

GMPTE / Volker Rail and Lang O’Rourke<br />

programme nationally.<br />

The information system is real time<br />

joint venture with Jacob Engineering<br />

and tracks alone bus routes.<br />

lead consultant.<br />

Management offices and welfare also<br />

HV Substation<br />

provided for the bus operation with the<br />

Back up generation<br />

Lancashire borough.<br />

Full HVAC spaces<br />

Package plant room<br />

Workshop and facility<br />

Free strategy smoke extract VESDA fire<br />

alarm<br />

Security red net fence & PTZ CCTV


PROJECT OVERVIEW<br />

Industrial


INDUSTRIAL<br />

Severn Trent Water<br />

Water Treatment Plant,<br />

Derby<br />

Vauxhall<br />

Power & Free System,<br />

Merseyside<br />

BAE Systems<br />

Euro Fighter Design Center,<br />

Preston


INDUSTRIAL<br />

SCA ­ Saica<br />

Effluent Treatment Plant,<br />

Kent<br />

TATA ­ Corus<br />

Water Treatment & Cooling<br />

Plant,<br />

Llanwern<br />

Blue Circle / Lafarge<br />

Vertical Motor,<br />

Scotland


PROJECT OVERVIEW<br />

Education


EDUCATION<br />

Whalley Range<br />

RNIB Coventry<br />

Hinckley<br />

Manchester Coventry Nuneaton


EDUCATION services<br />

Whalley Range<br />

RNIB Coventry<br />

Hinckley<br />

HV switchroom and substation<br />

Complete energy centre with biomass<br />

boilers (package plant room)<br />

District heating system via an energy<br />

centre and CHP plant operating in an<br />

island condition<br />

Computer suites and design center<br />

Technical centre for renewable studies,<br />

wind turbine located on site<br />

Distributed pumped water with<br />

filtration/chillers<br />

The site is a training school with living<br />

quarters for pupils<br />

HVAC systems, along with a Honeywell<br />

BMS<br />

Lab gasses and scavenging<br />

Centralise ventilation plant with heat<br />

recovery and chilled water cooling<br />

The school is equipped with a sensory<br />

center and swimming pool, bubble tubes<br />

and interactive lighting.<br />

Passive air cooled open central atrium<br />

Room by room metering to manage<br />

complete energy modelling<br />

High efficiency lighting system with local<br />

programmable control –BMS control active<br />

time and dormant periods<br />

Grey water for toilet flushing and irrigation<br />

of landscaping facilities.<br />

Emergency lighting with self test with<br />

intelligent test sequencing<br />

Ground source to specific areas using<br />

under floor LPHW heating / pre­heating<br />

linked to BMS<br />

Flood Lighting to external pitches and<br />

sports academy latest LED lighting on<br />

aluminium mast ­ lowering headgear


PROJECT OVERVIEW<br />

Student Accommodation


STUDENT ACCOMMODATION<br />

Cambridge Street<br />

Manchester<br />

810 No Bedrooms<br />

London Road<br />

Liverpool<br />

590 No Bedrooms<br />

Burley Road<br />

Leeds<br />

650 No Bedrooms


STUDENT ACCOMMODATION services<br />

Cambridge Road<br />

London Road<br />

Burley Road<br />

HV switch room and substation<br />

Flood Lighting to external premises<br />

Electric heating system<br />

Package plant room boiler plant pumped<br />

inverter water supply ­ constant pressure<br />

Central BMS and door access/security<br />

Smoke vent powered to escape<br />

corridors<br />

Electric heating system<br />

Sprinkler system<br />

Fire alarm system to BS5839 Pt 1<br />

HV switch room and substation<br />

Package plant room boiler plant pumped<br />

inverter water supply ­ constant pressure<br />

Central BMS and door access/security<br />

Smoke vent powered to escape<br />

corridors<br />

HV switch room and substation<br />

Package plant room boiler plant pumped<br />

inverter water supply ­ constant pressure<br />

Central BMS and door access/security<br />

Smoke vent powered to escape<br />

corridors<br />

Sprinkler system<br />

High efficiency lighting system<br />

Electric heating system<br />

High efficiency lighting system<br />

Emergency lighting with self test with<br />

intelligent test sequencing<br />

Fire alarm system to BS5839 Pt 1<br />

Sprinkler system<br />

High efficiency lighting system<br />

Emergency lighting with self test with<br />

intelligent test sequencing<br />

Emergency lighting with self test with<br />

intelligent test sequencing<br />

Fire alarm system to BS5839 Pt 1<br />

Flood Lighting to external premises


PROJECT OVERVIEW<br />

Renewables


RENEWABLES<br />

4MW<br />

Chester<br />

200MW<br />

Renewable Services<br />

Around the UK<br />

19.20MW<br />

Swindon


RENEWABLES services<br />

Renewable Services<br />

Design<br />

Surveys<br />

Trenches<br />

Framing<br />

Panels<br />

Fencing<br />

HV & LV<br />

G59<br />

Metering<br />

Modular Solutions<br />

Testing & commissioning<br />

Monitoring & Remote Solutions<br />

Maintenance


PROJECT OVERVIEW<br />

Modular Solutions


MODULAR SOLUTIONS<br />

E + I Houses<br />

Energy Storage<br />

HV Switchroom


MODULAR SOLUTIONS services<br />

E + I Houses<br />

Prefabricated walk­in modular outdoor<br />

enclosure to house a medium voltage<br />

(MV) and low voltage (LV) switchgear as<br />

well as auxiliary equipment. It can be skid<br />

or wheel mounted and is ready to operate<br />

in the field with minimum installation,<br />

commissioning and start up time ­ as an<br />

Energy Storage<br />

Storage systems like ours are the most<br />

cost effective way to be self­sufficient.<br />

Types of energy storage include:<br />

Power Systems<br />

Applications<br />

Power Control<br />

Battery Houses<br />

HV Switchroom<br />

Similarly to E + I Houses, our bespoke HV<br />

switchrooms are walk­in out door<br />

containers that are prefabricated so it can<br />

be installed in a short amount of time.<br />

Access can be limited to suit.<br />

Houses high voltage switchgear (HV) as<br />

well as extra equipment to suit the<br />

alternative to traditional on­site building<br />

requirements of the site.<br />

construction (concrete block, brick<br />

construction or similar).


PROJECT OVERVIEW<br />

Power & Utility


POWER & UTILITY<br />

Electrical & Energy<br />

Fabrication<br />

HVAC


POWER & UTILITY services<br />

Electrical & Energy<br />

We can provide turnkey electrical systems<br />

Fabrication<br />

We can fabricate single or multiple units.<br />

HVAC<br />

Our experienced engineers have<br />

for our blue chip clients and with our blue<br />

From design to production our engineers<br />

provided HVAC systems for the modular,<br />

chip partners.<br />

ensure a quick turn around.<br />

oil/gas and industrial applications for<br />

We have extensive experience in Drives,<br />

Inspection and certification facilities<br />

over 20 years.<br />

Pumps, Renewable Energy, Industrial<br />

available.<br />

The experience gained from integration<br />

Processes, Treatment works and handling<br />

with sensitive equipment in sometimes<br />

plants.<br />

harsh enviroments is invaluable.


PROJECT OVERVIEW<br />

Monitoring & Remote Solutions


MONITORING & REMOTE SOLUTIONS<br />

Plant Manager<br />

Remote Control unit<br />

Monitoring<br />

Remote monitoring unit


MONITORING & REMOTE SOLUTIONS services<br />

Plant Manager<br />

Remote or manual managing of plant<br />

Monitoring<br />

Multiple resources for monitoring and<br />

managing plants in a cost effective<br />

DNO Approved<br />

manner<br />

Controlled access & notificaions<br />

Remotely monitor generation and<br />

issues should they occur<br />

Status reporting<br />

Can access monitoring on mobile app<br />

SMS control, no app or program<br />

required<br />

Notification tools to respond<br />

immediately<br />

G59 can be set remotely or manually<br />

Summary of days comparison with<br />

Saves cable and civil works<br />

previous days<br />

Multiple recipients via secure<br />

Reduces site services which can be costly<br />

connection<br />

Operational problems view including plant<br />

Off site control by authorised personnel<br />

events and device alarms<br />

PIN and passcode protected<br />

Provides out­of­box integration with<br />

meters, sensors, weather stations, and<br />

Timed locking<br />

combiners<br />

Automatic fail safe<br />

Reports can be exported on demand or<br />

scheduled on a daily, weekly, or monthly<br />

Multiple applications<br />

basis


PROJECT OVERVIEW<br />

International


INTERNATIONAL services<br />

Hong Kong Siemens ABB Beijing<br />

Distribution & Transport,<br />

Hong Kong<br />

Storm Water System,<br />

Lybia<br />

Installation of 6.6kV Drive,<br />

China


INTERNATIONAL services<br />

QGPC - Qatar Siemens - Qatar Al Khouri - Qatar<br />

Offshore Petro Chem & Tank Farm,<br />

Qatar<br />

Water Desalinisation & Treatment,<br />

Qatar<br />

Emergency Hospital,<br />

Qatar


INTERNATIONAL services<br />

BHP - Australia Haifa - Israel Bermuda<br />

One of the Largest Bucket Wheel &<br />

Conveyor Systems,<br />

Australia<br />

Industrial & Military Port,<br />

Israel<br />

Waste to Energy Power Station,<br />

Bermuda

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!