finalised brochure.compressed
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROJECT OVERVIEWS<br />
Residential<br />
Infrastructure<br />
Industrial<br />
Education<br />
Student Accommodation<br />
Renewables<br />
Modular Solutions<br />
Power & Utility<br />
Remote Solutions<br />
International
COMPANY INFORMATION<br />
Barratt Energy<br />
Electrical Engineers &<br />
Contractors<br />
With a London Office to assist with the<br />
design and development activities.<br />
Throughout the design and installation<br />
The Barratt team started in electrical<br />
engineering and collectively have an<br />
extensive range of experience which<br />
includes all types of industrial projects,<br />
phase Barratts are well known for their<br />
ability to work with the project teams in<br />
delivering schemes on time and on<br />
budget.<br />
paper, water, waste, automotive and<br />
steel.<br />
Our skills in designing and engineering<br />
jobs, which fulfill our clients financial and<br />
Our head office is located in Wilmslow<br />
near Manchester from where we<br />
quality requirements, generates repeat<br />
business for ourselves.<br />
undertake projects throughout the UK and<br />
Europe.
ORGANOGRAM
OUR AIMS<br />
Aim of today<br />
Track record<br />
What we deliver<br />
To look forward to ways of collaborating<br />
Previous success has been achieved, in<br />
Cost certainty through either consultant<br />
with Mishigas and<br />
particular on overseas projects, where the<br />
partnership or directly with your end client<br />
their stakeholders to find the most<br />
end client required the leading edge<br />
requirements through design model<br />
acceptable and economical solution to<br />
framework; working with bluechip<br />
feasibility & understanding, presentation<br />
modern resource and generation<br />
organisations like Siemens, BAE<br />
and economics.<br />
schemes.<br />
Systems, Degremont etc.<br />
What we offer<br />
Together Barratt would offer complete<br />
commercial modelling with building<br />
services engineering solutions to provide<br />
In places as far afield as Qatar, Saudi<br />
Arabia and Lybia, they have all proved a<br />
great success!<br />
Delivery of a robust and practical<br />
engineering solution incorporating the<br />
latest technology, sustainability and<br />
energy efficiency.<br />
modern environmentally efficient design<br />
to the Processing sectors.<br />
Our broad range of experience ensures<br />
that we are able to effectively contribute<br />
Trust – Commitment – Passion Teamwork<br />
to all aspects of the design, procurement,<br />
construction and handover of each<br />
project.
KEY SERVICES<br />
Electrical<br />
Mechanical<br />
Utilities<br />
Lighting Systems<br />
Heating & Ventilation<br />
Utility Feasibility Study<br />
Mains & Power Distribution<br />
Air Conditioning<br />
Determination of Electrical Loadings<br />
Earthing Installations<br />
Concept & Detailed Design<br />
Optimum design and installation<br />
Power Generation<br />
Power Supplies<br />
Control Panel & Switchgear<br />
High Voltage System<br />
CHP Viability Evaluation<br />
Biomass Boilers<br />
Water Treatments Plants & Processing<br />
proposals<br />
Supply applications<br />
Utility Capital Investment Opportunities<br />
Energisation<br />
Emergency Lighting & Fire Alarm<br />
Systems<br />
Technical<br />
Commissioning<br />
Navigating to the most economic and<br />
CCTV<br />
painless utility solutions.<br />
Energy Management<br />
AV/Smart Controls<br />
Telephony and Data<br />
Intruder<br />
Access Control<br />
Energy Efficiency
PROJECT OVERVIEW<br />
Residential
RESIDENTIAL<br />
Erie Basin<br />
Manchester<br />
205 No Apartments (2 Blocks)<br />
10 No Floors / 19 No Floors<br />
Princess Dock<br />
Liverpool<br />
201 No Apartments<br />
25 No Floors<br />
Granary Wharf<br />
Leeds<br />
355 No Apartments (2 Blocks)<br />
11 No Floors / 19 No Floors
RESIDENTIAL services<br />
Erie Basin<br />
Princess Dock<br />
Granary Wharf<br />
HV substation<br />
Metering within apartments<br />
Central BMS and door access/security<br />
Fire Alarm BS55839 Pt 6 mixed use<br />
system<br />
Sprinkler to tower<br />
Private HV network from MDHC manage<br />
by landlord<br />
Metering and distributed LV services<br />
Lighting controls landlord areas<br />
Fire alarms B55839 Pt 1<br />
Sprinkler system<br />
Distribution from British<br />
Waterways. Resident tower/block and<br />
double tree hotel<br />
Package plant room roof top location<br />
(built off site)<br />
Fully distributed LPHW heating systems<br />
with vertical architectural heat emitters<br />
Smoke vent powered to escape corridors<br />
Car smoke ventilation<br />
Services to A3 retail (ground floor)<br />
AV/TV fully distributed system—BAKNET<br />
integrated (Including car park access)<br />
Package plant room boiler plant pumped<br />
inverter water supply constant pressure<br />
BMS, lift management<br />
Access entry and security<br />
Plant rooms<br />
Air condition and package plant<br />
Full kitchen extract system and carbon<br />
filters compliant to network requirement,<br />
platform at level 4 adjacent to build<br />
Pumped water and tanks (standby)<br />
Full AV/TV distributed systems –home<br />
office facilities<br />
Railway arch car parking 300 cars and<br />
associated smoke shut fans and<br />
entry/security systems
PROJECT OVERVIEW<br />
Infrastructure
INFRASTRUCTURE<br />
Manchester Tram Station<br />
Manchester<br />
Burnley Bus Station<br />
Burnley<br />
National Express<br />
Birmingham
INFRASTRUCTURE services<br />
Manchester Tram Station<br />
Burnley Bus Station<br />
National Express<br />
Prepared an energy strategy to reduce<br />
Burnley council requested an eco<br />
Provided tram stations and workshops<br />
lighting cost to bus depot throughout the<br />
designed bus station, with a package<br />
along with the control centre.<br />
Midlands with a view to a roll out<br />
plant room.<br />
GMPTE / Volker Rail and Lang O’Rourke<br />
programme nationally.<br />
The information system is real time<br />
joint venture with Jacob Engineering<br />
and tracks alone bus routes.<br />
lead consultant.<br />
Management offices and welfare also<br />
HV Substation<br />
provided for the bus operation with the<br />
Back up generation<br />
Lancashire borough.<br />
Full HVAC spaces<br />
Package plant room<br />
Workshop and facility<br />
Free strategy smoke extract VESDA fire<br />
alarm<br />
Security red net fence & PTZ CCTV
PROJECT OVERVIEW<br />
Industrial
INDUSTRIAL<br />
Severn Trent Water<br />
Water Treatment Plant,<br />
Derby<br />
Vauxhall<br />
Power & Free System,<br />
Merseyside<br />
BAE Systems<br />
Euro Fighter Design Center,<br />
Preston
INDUSTRIAL<br />
SCA Saica<br />
Effluent Treatment Plant,<br />
Kent<br />
TATA Corus<br />
Water Treatment & Cooling<br />
Plant,<br />
Llanwern<br />
Blue Circle / Lafarge<br />
Vertical Motor,<br />
Scotland
PROJECT OVERVIEW<br />
Education
EDUCATION<br />
Whalley Range<br />
RNIB Coventry<br />
Hinckley<br />
Manchester Coventry Nuneaton
EDUCATION services<br />
Whalley Range<br />
RNIB Coventry<br />
Hinckley<br />
HV switchroom and substation<br />
Complete energy centre with biomass<br />
boilers (package plant room)<br />
District heating system via an energy<br />
centre and CHP plant operating in an<br />
island condition<br />
Computer suites and design center<br />
Technical centre for renewable studies,<br />
wind turbine located on site<br />
Distributed pumped water with<br />
filtration/chillers<br />
The site is a training school with living<br />
quarters for pupils<br />
HVAC systems, along with a Honeywell<br />
BMS<br />
Lab gasses and scavenging<br />
Centralise ventilation plant with heat<br />
recovery and chilled water cooling<br />
The school is equipped with a sensory<br />
center and swimming pool, bubble tubes<br />
and interactive lighting.<br />
Passive air cooled open central atrium<br />
Room by room metering to manage<br />
complete energy modelling<br />
High efficiency lighting system with local<br />
programmable control –BMS control active<br />
time and dormant periods<br />
Grey water for toilet flushing and irrigation<br />
of landscaping facilities.<br />
Emergency lighting with self test with<br />
intelligent test sequencing<br />
Ground source to specific areas using<br />
under floor LPHW heating / preheating<br />
linked to BMS<br />
Flood Lighting to external pitches and<br />
sports academy latest LED lighting on<br />
aluminium mast lowering headgear
PROJECT OVERVIEW<br />
Student Accommodation
STUDENT ACCOMMODATION<br />
Cambridge Street<br />
Manchester<br />
810 No Bedrooms<br />
London Road<br />
Liverpool<br />
590 No Bedrooms<br />
Burley Road<br />
Leeds<br />
650 No Bedrooms
STUDENT ACCOMMODATION services<br />
Cambridge Road<br />
London Road<br />
Burley Road<br />
HV switch room and substation<br />
Flood Lighting to external premises<br />
Electric heating system<br />
Package plant room boiler plant pumped<br />
inverter water supply constant pressure<br />
Central BMS and door access/security<br />
Smoke vent powered to escape<br />
corridors<br />
Electric heating system<br />
Sprinkler system<br />
Fire alarm system to BS5839 Pt 1<br />
HV switch room and substation<br />
Package plant room boiler plant pumped<br />
inverter water supply constant pressure<br />
Central BMS and door access/security<br />
Smoke vent powered to escape<br />
corridors<br />
HV switch room and substation<br />
Package plant room boiler plant pumped<br />
inverter water supply constant pressure<br />
Central BMS and door access/security<br />
Smoke vent powered to escape<br />
corridors<br />
Sprinkler system<br />
High efficiency lighting system<br />
Electric heating system<br />
High efficiency lighting system<br />
Emergency lighting with self test with<br />
intelligent test sequencing<br />
Fire alarm system to BS5839 Pt 1<br />
Sprinkler system<br />
High efficiency lighting system<br />
Emergency lighting with self test with<br />
intelligent test sequencing<br />
Emergency lighting with self test with<br />
intelligent test sequencing<br />
Fire alarm system to BS5839 Pt 1<br />
Flood Lighting to external premises
PROJECT OVERVIEW<br />
Renewables
RENEWABLES<br />
4MW<br />
Chester<br />
200MW<br />
Renewable Services<br />
Around the UK<br />
19.20MW<br />
Swindon
RENEWABLES services<br />
Renewable Services<br />
Design<br />
Surveys<br />
Trenches<br />
Framing<br />
Panels<br />
Fencing<br />
HV & LV<br />
G59<br />
Metering<br />
Modular Solutions<br />
Testing & commissioning<br />
Monitoring & Remote Solutions<br />
Maintenance
PROJECT OVERVIEW<br />
Modular Solutions
MODULAR SOLUTIONS<br />
E + I Houses<br />
Energy Storage<br />
HV Switchroom
MODULAR SOLUTIONS services<br />
E + I Houses<br />
Prefabricated walkin modular outdoor<br />
enclosure to house a medium voltage<br />
(MV) and low voltage (LV) switchgear as<br />
well as auxiliary equipment. It can be skid<br />
or wheel mounted and is ready to operate<br />
in the field with minimum installation,<br />
commissioning and start up time as an<br />
Energy Storage<br />
Storage systems like ours are the most<br />
cost effective way to be selfsufficient.<br />
Types of energy storage include:<br />
Power Systems<br />
Applications<br />
Power Control<br />
Battery Houses<br />
HV Switchroom<br />
Similarly to E + I Houses, our bespoke HV<br />
switchrooms are walkin out door<br />
containers that are prefabricated so it can<br />
be installed in a short amount of time.<br />
Access can be limited to suit.<br />
Houses high voltage switchgear (HV) as<br />
well as extra equipment to suit the<br />
alternative to traditional onsite building<br />
requirements of the site.<br />
construction (concrete block, brick<br />
construction or similar).
PROJECT OVERVIEW<br />
Power & Utility
POWER & UTILITY<br />
Electrical & Energy<br />
Fabrication<br />
HVAC
POWER & UTILITY services<br />
Electrical & Energy<br />
We can provide turnkey electrical systems<br />
Fabrication<br />
We can fabricate single or multiple units.<br />
HVAC<br />
Our experienced engineers have<br />
for our blue chip clients and with our blue<br />
From design to production our engineers<br />
provided HVAC systems for the modular,<br />
chip partners.<br />
ensure a quick turn around.<br />
oil/gas and industrial applications for<br />
We have extensive experience in Drives,<br />
Inspection and certification facilities<br />
over 20 years.<br />
Pumps, Renewable Energy, Industrial<br />
available.<br />
The experience gained from integration<br />
Processes, Treatment works and handling<br />
with sensitive equipment in sometimes<br />
plants.<br />
harsh enviroments is invaluable.
PROJECT OVERVIEW<br />
Monitoring & Remote Solutions
MONITORING & REMOTE SOLUTIONS<br />
Plant Manager<br />
Remote Control unit<br />
Monitoring<br />
Remote monitoring unit
MONITORING & REMOTE SOLUTIONS services<br />
Plant Manager<br />
Remote or manual managing of plant<br />
Monitoring<br />
Multiple resources for monitoring and<br />
managing plants in a cost effective<br />
DNO Approved<br />
manner<br />
Controlled access & notificaions<br />
Remotely monitor generation and<br />
issues should they occur<br />
Status reporting<br />
Can access monitoring on mobile app<br />
SMS control, no app or program<br />
required<br />
Notification tools to respond<br />
immediately<br />
G59 can be set remotely or manually<br />
Summary of days comparison with<br />
Saves cable and civil works<br />
previous days<br />
Multiple recipients via secure<br />
Reduces site services which can be costly<br />
connection<br />
Operational problems view including plant<br />
Off site control by authorised personnel<br />
events and device alarms<br />
PIN and passcode protected<br />
Provides outofbox integration with<br />
meters, sensors, weather stations, and<br />
Timed locking<br />
combiners<br />
Automatic fail safe<br />
Reports can be exported on demand or<br />
scheduled on a daily, weekly, or monthly<br />
Multiple applications<br />
basis
PROJECT OVERVIEW<br />
International
INTERNATIONAL services<br />
Hong Kong Siemens ABB Beijing<br />
Distribution & Transport,<br />
Hong Kong<br />
Storm Water System,<br />
Lybia<br />
Installation of 6.6kV Drive,<br />
China
INTERNATIONAL services<br />
QGPC - Qatar Siemens - Qatar Al Khouri - Qatar<br />
Offshore Petro Chem & Tank Farm,<br />
Qatar<br />
Water Desalinisation & Treatment,<br />
Qatar<br />
Emergency Hospital,<br />
Qatar
INTERNATIONAL services<br />
BHP - Australia Haifa - Israel Bermuda<br />
One of the Largest Bucket Wheel &<br />
Conveyor Systems,<br />
Australia<br />
Industrial & Military Port,<br />
Israel<br />
Waste to Energy Power Station,<br />
Bermuda