The situation is typical: a complex construction project<br />
with high security standards, time pressure, tight<br />
budgets. What happens next, everybody fears and nobody<br />
needs. Construction problems, modification requests<br />
by the principal, or mistakes in the drawings.<br />
And there you are in a bit of a bind. “Quick and dirty”,<br />
or quality taking into account certain delays.<br />
“If you cannot draw back on your own construction<br />
power, the situation gets difficult,” Marcus Krüger,<br />
head of the <strong>Franzen</strong> assembly department since three<br />
years, aptly describes the situation. “As subcontractors<br />
are independent units, even the best partnership<br />
leaves only limited influence if it is getting tough”,<br />
Krüger continues. “That is why we have restructured<br />
the 35 heads strong assembly department of <strong>Franzen</strong><br />
Group during the last two years.”<br />
The requirements in industrial and commercial construc<br />
tion have distinctly risen during the last few years.<br />
In particular with construction sites with the highest<br />
security standards such as power plants, for example.<br />
Accordingly, heavy investments were made into the assembly<br />
team: apprenticeship and in-service training,<br />
perfect working equipment, and an optimum working<br />
environment are required to deliver peak performance<br />
in construction even under difficult conditions. At the<br />
same time, the teams were reorganised. Old hands and<br />
scHNEllE EiNGREiF TRuPPE<br />
young blood should complement each other. Experience<br />
as well as knowledge of the latest technologies<br />
are thus combined to the benefit of the customer. The<br />
teams are supported by the construction managers, the<br />
assembly manager, and the safety expert as well as the<br />
headquarters in Kottenheim with commercial management,<br />
accounting and stock keeping departments.<br />
The <strong>Franzen</strong> assembly team puts a special focus on<br />
the subject of safety. Additionally, all the assembly<br />
foremen are trained to be safety experts. After all, four<br />
hours of assembly work in power plant construction<br />
mostly require the same period of time for preparation<br />
and work safety. Thus, there is optimisation potential.<br />
This does help the customer. But above all, the <strong>Franzen</strong><br />
Group has available a rapid response team in their<br />
own assembly unit to tend to unforeseeable problems.<br />
A team that does everything to deliver utmost quality<br />
even when time and budgets are tight. Works, that<br />
subcontractors cannot carry out in this manner with<br />
regard to quality and profitability.<br />
Michael <strong>Franzen</strong> conclusively states at this point:<br />
“The <strong>Franzen</strong> Group does not merely distribute<br />
tasks – we still carry out important works in-house.<br />
This particularly applies to assembling. As this is<br />
our speciality we started on almost fifty years ago!”<br />
05<br />
in diesen Höhen<br />
steht die Arbeitssicherheit<br />
immer<br />
im Fokus.<br />
In these heights, the<br />
focus is always on<br />
safety at work.