25.10.2013 Aufrufe

Franzen report

Franzen report

Franzen report

MEHR ANZEIGEN
WENIGER ANZEIGEN

Verwandeln Sie Ihre PDFs in ePaper und steigern Sie Ihre Umsätze!

Nutzen Sie SEO-optimierte ePaper, starke Backlinks und multimediale Inhalte, um Ihre Produkte professionell zu präsentieren und Ihre Reichweite signifikant zu maximieren.

The situation is typical: a complex construction project<br />

with high security standards, time pressure, tight<br />

budgets. What happens next, everybody fears and nobody<br />

needs. Construction problems, modification requests<br />

by the principal, or mistakes in the drawings.<br />

And there you are in a bit of a bind. “Quick and dirty”,<br />

or quality taking into account certain delays.<br />

“If you cannot draw back on your own construction<br />

power, the situation gets difficult,” Marcus Krüger,<br />

head of the <strong>Franzen</strong> assembly department since three<br />

years, aptly describes the situation. “As subcontractors<br />

are independent units, even the best partnership<br />

leaves only limited influence if it is getting tough”,<br />

Krüger continues. “That is why we have restructured<br />

the 35 heads strong assembly department of <strong>Franzen</strong><br />

Group during the last two years.”<br />

The requirements in industrial and commercial construc<br />

tion have distinctly risen during the last few years.<br />

In particular with construction sites with the highest<br />

security standards such as power plants, for example.<br />

Accordingly, heavy investments were made into the assembly<br />

team: apprenticeship and in-service training,<br />

perfect working equipment, and an optimum working<br />

environment are required to deliver peak performance<br />

in construction even under difficult conditions. At the<br />

same time, the teams were reorganised. Old hands and<br />

scHNEllE EiNGREiF TRuPPE<br />

young blood should complement each other. Experience<br />

as well as knowledge of the latest technologies<br />

are thus combined to the benefit of the customer. The<br />

teams are supported by the construction managers, the<br />

assembly manager, and the safety expert as well as the<br />

headquarters in Kottenheim with commercial management,<br />

accounting and stock keeping departments.<br />

The <strong>Franzen</strong> assembly team puts a special focus on<br />

the subject of safety. Additionally, all the assembly<br />

foremen are trained to be safety experts. After all, four<br />

hours of assembly work in power plant construction<br />

mostly require the same period of time for preparation<br />

and work safety. Thus, there is optimisation potential.<br />

This does help the customer. But above all, the <strong>Franzen</strong><br />

Group has available a rapid response team in their<br />

own assembly unit to tend to unforeseeable problems.<br />

A team that does everything to deliver utmost quality<br />

even when time and budgets are tight. Works, that<br />

subcontractors cannot carry out in this manner with<br />

regard to quality and profitability.<br />

Michael <strong>Franzen</strong> conclusively states at this point:<br />

“The <strong>Franzen</strong> Group does not merely distribute<br />

tasks – we still carry out important works in-house.<br />

This particularly applies to assembling. As this is<br />

our speciality we started on almost fifty years ago!”<br />

05<br />

in diesen Höhen<br />

steht die Arbeitssicherheit<br />

immer<br />

im Fokus.<br />

In these heights, the<br />

focus is always on<br />

safety at work.

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!