Erfahrungs- und Forschungsbericht 2012 - Ensi

static.ensi.ch

Erfahrungs- und Forschungsbericht 2012 - Ensi

References

[1] B. Reer, V.N. Dang, S. Hirschberg. The CESA

method and its application in a plant-specific

pilot study on errors of commission. Reliability

Engineering and System Safety, 83, p.

187–205, 2004.

[2] L. Podofillini, V.N. Dang, O. Nusbaumer, D.

Dres, A pilot study for errors of commission

for a boiling water reactor using the CESA

method, Reliability Engineering & System

Safety, 109, Pages 86–98, January 2013.

[3] B. Reer: Outline of a Method for Quantifying

Errors of Commission, LEA 09-302, Paul

Scherrer Institut, Villigen PSI, Nov. 2009.

[4] Y.J. Chang, D. Mercurio, V.N. Dang, A.

Mosleh: Recent Developments and Insights

from Application of ADS-IDAC Dynamic PRA

Platform, Proc. 9 th Int. Conf. on Probabilistic

Safety Assessment and Management

(PSAM9), Hong Kong, China, 18–23 May

2008.

[5] H. Broberg, M. Hildebrandt, R. Nowell: Results

from the 2010 HRA Data Collection at

a US PWR Training Simulator, OECD Halden

Reactor Project, HWR-871, Halden, Norway,

2011.

190

ENSI Erfahrungs- und Forschungsbericht 2012

Weitere Magazine dieses Users
Ähnliche Magazine