02.03.2013 Views

Final Report - Asian Development Bank

Final Report - Asian Development Bank

Final Report - Asian Development Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />

MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />

1.4 Purpose of this <strong>Report</strong><br />

1.4.1 This <strong>Final</strong> <strong>Report</strong> presents the results of the TA7343 studies, also incorporating in full the<br />

relevant earlier findings from the TA4862 study.<br />

1.4.2 The report is comprised of the following chapters:<br />

Chapter 1: Introduction.<br />

Chapter 2: Project Context presents the project’s demographic, social and<br />

environmental conditions, the historic trends in transport demand and supply, and the<br />

recent government policies in urban and transport development.<br />

Chapter 3: Transport Master Plan & Patronage Demand Forecasts summarizes the<br />

current UMRT development plans, the potential future UMRT demand,<br />

recommendations for optimal UMRT network development, and the demand forecasts<br />

for Line 2.<br />

Chapter 4: Sustainable Transport explains the sustainable transport proposals that<br />

can enhance the patronage of the MRT system and create a successful integrated<br />

transport network for Ho Chi Minh City.<br />

Chapter 5: Design Characteristics presents the project’s scope, location, alignment<br />

and rolling stock, and discussed engineering issues.<br />

Chapter 6: Service Operations Plan outlines the characteristics of the proposed metro<br />

services on Line 2 including train capacities; headways etc, and also provides an<br />

outline of the operation & maintenance (O&M) requirements.<br />

Chapter 7: Capital and O&M Costs sets out the main components of the costs of<br />

constructing the project, and the anticipated operating and maintenance costs for the<br />

system once it is up and running.<br />

Chapter 8: Social Safeguards summarizes the land acquisition and resettlement<br />

aspects, and the social analysis and poverty assessment.<br />

Chapter 9: Environmental Safeguards summarises the initial environmental<br />

examination and monitoring program.<br />

Chapter 10: Economic and Financial Assessment presents the economic analysis and<br />

the financial appraisal for the project.<br />

Chapter 11: Project Implementation presents the aspects related to the project<br />

implementation, including project approvals, institutional arrangements and capacity<br />

building, sources of finance, and risk identification and management.<br />

Chapter 12: Risk Identification and Management presents the possible risks to a<br />

successful Project and the mitigation / monitoring measures that are or will be put into<br />

action.<br />

1-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!