<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />

MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />

2.2 Socio-economic and Demographic Circumstances<br />

2.2.1 The last national population census in Vietnam was in 1999. For the purposes of the project<br />

estimates of population at base year (2007) and design years (2015, 2025) were made based<br />

on the projection data in the reports from HOUTRANS 1 and from the Study on the Adjustment<br />

of HCMC Master Plan 2 .<br />

2.2.2 In 2007 the estimated population of Ho Chi Minh City was over 6.5 million, growing at around<br />

2.9% per year. In addition, more than 2.5 million people live in the adjoining provinces of<br />

Long An, Dong Nai and Binh Duong, totalling more than 9 million people in the Study Area. It<br />

is forecast that the Study Area population will reach over 13.8 million by 2025, with 10 million<br />

people in HCMC 3 . Most of the population growth is projected to happen in outer areas (the<br />

urban fringe, suburban and other outlying communities), while the inner core areas are<br />

projected either to decrease their populations (in high density areas) or increase moderately<br />

(in medium/low density areas). Figure 2.2 provides an overview of the estimated populations<br />

for 2007, 2015 and 2025 in the Study Area.<br />

Figure 2.2 Population Estimates for 2007, 2015 and 2025 by Study Area Types<br />

4,500<br />

4,000<br />

3,500<br />

3,000<br />

2,500<br />

2,000<br />

1,500<br />

1,000<br />

500<br />

0<br />

Population in thousands<br />

1,400<br />

1,300<br />

2,400<br />

2,600<br />

3,000<br />

2,100 2,000<br />

2,900<br />

1,400 2,300 1,500 1,300 2,600<br />

Inner Core - high<br />

density<br />

Inner Core -<br />

med/low density<br />

2-2<br />

3,200<br />

Urban Fringe Suburban Others<br />

2.2.3 In 2007, HCMC employed more than 3 million people and the Study Area almost 4.2 million<br />

people. By 2025, it is projected that HCMC will employ more than 5.5 million people and the<br />

Study Area more than 7.2 million people. While the employment growth is projected to spread<br />

throughout the Study Area ore evenly, the outer areas are still expected to generate most of<br />

the future employment. Figure 2.3 provides a view of the projected employment for 2007,<br />

2015 and 2025 in the Study Area.<br />

2.2.4 Viet Nam was among the world's fastest-growing economies with GDP growth rates above<br />

7.0% in 2001-2004 and above 8.0% in the last three years. In 2008, The GDP growth<br />

forecast was around 8.5%. HCMC is the largest city in Viet Nam and the primary centre of<br />

economic activity and, as such, its GDP growth has outpaced the national level growth:<br />

between 10% and 12% in 2001-2004 and more than 12% in 2004-2007. In the prospective<br />

future HCMC will continue to be the major centre of economic activity of the country.<br />

1<br />

The Study On Urban Transport Master Plan And Feasibility Study In Ho Chi Minh Metropolitan Area<br />

(HOUTRANS), JICA, ALMEC, 2004<br />

2<br />

The Study of the Adjustment of HCMC Master Plan up to 2025, Nikken Sekkei, Urban Planning Institute, April<br />

2007<br />

3<br />

For more details on socio-economic conditions the reader is referred technical documents prepared as part of<br />

the PPTA: Project Context and MRT Master Plan <strong>Report</strong>, December 2007, and HCMC Master Plan Ridership<br />

and Revenue Forecast Study, <strong>Final</strong> <strong>Report</strong>, January 2008.<br />

4,100<br />

2007<br />

2015<br />

2025