Final Report - Asian Development Bank
Final Report - Asian Development Bank
Final Report - Asian Development Bank
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> TA7343 Ho Chi Minh City MRT Line 2 Project<br />
MVA Asia Ltd <strong>Final</strong> <strong>Report</strong> – November 2010<br />
CONTENTS<br />
- KNOWLEDGE SUMMARY<br />
1. INTRODUCTION<br />
1.1 Background<br />
1.2 Supporting PPIAF Studies<br />
1.3 Laws, Decrees, Decisions and Other Documents Supporting the Project<br />
1.4 Purpose of the <strong>Report</strong><br />
2. PROJECT CONTEXT<br />
2.1 Local Conditions<br />
2.2 Socio-economic and Demographic Circumstances<br />
2.3 Historic Trends in Transport Demand and Supply<br />
2.4 Government Policies on Urban and Transport <strong>Development</strong><br />
3. TRANSPORT MASTER PLAN & PATRONAGE DEMAND FORECASTS<br />
3.1 Urban Transport Sector Assessment<br />
3.2 The 2007 Approved Transport Plan<br />
3.3 Recommended Modifications to the Transport Master plan<br />
3.4 Latest Master Plan Issues (Feb 2010)<br />
3.5 Inter-Operability of MRT Lines<br />
3.6 Transport Demand Forecasts<br />
4. SUSTAINABLE TRANSPORT<br />
4.1 Introduction<br />
4.2 HCMC Public Transport Mode Share Targets<br />
4.3 Key Measures to Achieve Public Transport Mode Share Targets<br />
4.4 <strong>Development</strong> of Bus Network<br />
4.5 Creating an Integrated MRT Network<br />
4.6 Sustainable Transport Policy<br />
4.7 Critical Sustainable Transport Components for MRT Line 2<br />
4.8 Funding and Implementation of Sustainable Transport Measures<br />
5. DESIGN CHARACTERISTICS OF LINE 2<br />
5.1 Overview<br />
5.2 Alignment<br />
5.3 Station Design<br />
5.4 Stations and Interchanges<br />
5.5 Depot<br />
5.6 Power Supply<br />
5.7 Signalling<br />
5.8 Fare Collection and Ticketing<br />
5.9 Construction Issues<br />
6. SERVICE OPERATIONS AND MAINTENANCE<br />
6.1 Service Plans for Normal Operations<br />
6.2 Track Cross-Overs and Layby Tracks<br />
6.3 Operations and Maintenance Plans<br />
7. CAPITAL AND OPERATIONS & MAINTENANCE COSTS<br />
7.1 Capital Cost Estimates<br />
i