Background Write-Up Template - NERC
Background Write-Up Template - NERC
Background Write-Up Template - NERC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Standard Processes Manual<br />
Agenda Item 10c<br />
Board of Trustees Meeting<br />
February 7, 2013<br />
Action<br />
Approve the following documents and direct that the Revised Standard Processes Manual<br />
(SPM) (Appendix 3A of the <strong>NERC</strong> Rules of Procedure) be filed with regulatory authorities.<br />
[Standard Processes Manual-Clean] [Standard Processes Manual-Redline to Last Approved]<br />
<strong>Background</strong><br />
Proposed revisions to <strong>NERC</strong>’s standards development processes were developed in response to<br />
recommendations made to the Board of Trustees (Board) by the Member Representatives<br />
Committee’s Standards Process Input Group in May 2012, specifically Recommendations 1, 4,<br />
and 5. The revisions to the SPM resulted in a streamlined formal process and are consistent<br />
with ANSI Essential Requirements. Specifically, the revisions are to:<br />
• Memorialize the intent to revise drafting team compositions to ensure they are<br />
appropriately equipped to meet reliability objectives (e.g., add legal and compliance<br />
experts)<br />
• Incorporate reference to compliance assessment tool development, such as Reliability<br />
Standards Audit Worksheets (RSAWs), cooperatively and in parallel with standard<br />
drafting<br />
• Streamline commenting and balloting, including provisions for:<br />
Summary responses to comments and elimination of the obligation to respond in<br />
writing at every stage of the comment process<br />
Eliminating negative votes without comments in the calculation of consensus<br />
Quality reviews to be conducted in parallel with standard development<br />
• Incorporate guidance for the appropriate role and scope of Interpretations, to be<br />
consistent with guidance from the <strong>NERC</strong> Board<br />
• Reduce the requirement for periodic review to be consistent with ANSI minimum<br />
requirements<br />
• Incorporate a waiver provision to allow for modifications to the standards development<br />
process for good cause, with five days notice and reporting of the exercise of a waiver to<br />
the Board’s Standards Oversight and Technology Committee.<br />
The revisions were developed by the Standards Committee Process Subcommittee, and, since<br />
June 2012, were posted for three stakeholder comment periods, an initial ballot, successive<br />
ballot, and a recirculation ballot. The recirculation ballot concluded in January 2013. The results<br />
of the recirculation ballot were not available at the time these materials were distributed and<br />
will be reported at the meeting.
A small number of changes are needed to the Rules of Procedure to reflect the revisions to the<br />
SPM. These changes will be brought to the Board for action at a later date. In addition, some<br />
aspects of the SPIG’s recommendations, such as those related to the formation of drafting<br />
teams, improved project management discipline for standards projects, and development of<br />
results-based standards, do not require specific changes to the SPM, and work is ongoing to<br />
implement those changes at the appropriate phase of each active and future standards project.