Use only dry Nitrogen gas to IS:1747 with 50 ppm moisture and 1%<br />

oxygen by volume.<br />

If the storage time exceeds 3 months, the transformer is filled with oil<br />

according to directions given in clause 2.5. If for some reason oil filling is not<br />

possible, then nitrogen must be continuously maintained at a positive pressure.<br />

Measures to be taken on receipt at site are given in clause 2.1.<br />

1.2.3 INSTRUCTIONS FOR FILLING DRY PURE NITROGEN GAS WITH<br />

BACK UP CYLINDERS (AT WORKS)<br />

Lower the oil level to the minimum necessary to dismantle the items<br />

(such as bushing and turrets) which must be removed for shipping.<br />

Pull 500 mm mercury vacuum after blanking off all openings.<br />

Break the vacuum by admitting dry nitrogen through a convenient valve<br />

at the top of the tank and drain the oil completely.<br />

Continue to supply nitrogen until it maintains a steady pressure of 0.17<br />

± 0.02 kg/cm 2 above the atmosphere.<br />

Pressure of nitrogen gas shall be maintained at 0.17 ± 0.02 kg/cm 2 at<br />

same reference temperature. Pressure would be monitored by taking three<br />

readings within 24 hours to ensure that there is no leakage of gas.<br />

Shut off the gas supply valve and fit dry nitrogen back up cylinders<br />

through nitrogen regulator valve.<br />