EXPLORATION<br />

RESOURCE DEVELOPMENT<br />

REVIEW OF OPERATIONS<br />

Resource definition drilling and resource modelling was again the focus for the Nullagine Project during <strong>2005</strong>. In addition<br />

to ongoing work to extend and infill the large resource at Golden Eagle, this year also saw the first major campaigns to<br />

prove-up resources at All Nations, Barton, Golden Gate, Little Wonder and Shearers (Figure 1).<br />

Figure 1: Outline of the Nullagine Project area showing the location of the main resources<br />

In total, almost 40,000 metres were drilled across the project, and the scope and results of the various drilling campaigns<br />

are summarised in Table 1.<br />

Table 1: Scope and summary of results of resource definition drilling<br />

Deposit<br />

Reverse Circulation<br />

No. Holes Metres<br />

Diamond Core<br />

No. Holes Metres<br />

Results: Holes with Intercepts<br />

>10 gmm* >30 gmm*<br />

Golden Eagle 92 11,091 31 3,213.97 42% 14%<br />

Barton 31 3,526 1 86.80 55% 26%<br />

Golden Gate 139 9,488 68% 40%<br />

All Nations 74 4,816 1 74.80 49% 18%<br />

Shearers 79 2,844 43% 8%<br />

Little Wonder 76 4,486 17% 1%<br />

Total 491 36,251 33 3,375.57<br />

* Note: gmm is an abbreviation for gram-metres, which is the product of the intercept grade, in g/t Au, and the width of the intercept (e.g. 30 gmm is<br />

equivalent to 10 metres grading 3 g/t Au, or 5 metres grading 6 g/t Au). A 1 g/t Au lower cut-off grade is used to calculate intercept grade.<br />

WW ee dd g e tt a i l E x p l o rr a t i o n N L<br />

5