29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

286 S i n g l e Lines.—Continued.<br />

Chilton Branch--Continued.<br />

Chilton Crossing.—<br />

In the event of a train arriving from Leasingthorne simultaneously with the<br />

arrival of one from Gipsy Lane, the latter must draw into the Chilton Colliery<br />

line clear of the trap points ; after the train from Leasingthorne has arrived at<br />

Chilton Crossing the signalman must obtain the staff from the dEiver and hand<br />

it to the guard of the train to Leasingthorne for transfer to his driver. The<br />

guard will then manipulate the ground frame and turn the train on to the<br />

Leasingthorne Branch.<br />

Chilton Colliery.—<br />

The arrangements admit of trains working to Chilton Colliery while the staff<br />

is at Leasingthorne. Trains for Chilton Colliery to stop short of the crossover<br />

near the ground frame. The guard will then manipulate the ground frame and<br />

allow the engine to run round the train via Chilton Crossing. Before placing<br />

the signals from Leasingthorne to danger, the guard must satisfy himself that<br />

no other train is within sight. ( O . 1842).<br />

FORCETT BRANCH.<br />

1.—Drivers of engines or trains requiring to travel from the New Quarry to<br />

the Old Quarry or Goods Yard must in all cases be in possession of the<br />

Eppleby and New Quarry staff.<br />

2.—The Forcett Quarry Company will arrange for a man being in attendance<br />

at Eppleby on the arrival and departure of all engines or trains who will have<br />

charge of the staffs and tickets there.<br />

3.—The Forcett Quarry Company's Clerk, stationed at the New Quarry office;<br />

will have charge of the staff and ticket working at that place.<br />

4.<br />

for - an incoming train, care must be taken to see that this is done before the<br />

inward train leaves Forcett Junction.<br />

W<br />

5.--It must be understood that trains travelling to and from the Quarries<br />

shall<br />

h<br />

not approach the Eppleby Engine Shed from opposite directions at the same<br />

time, e also that engines must not foul the engine shed line until the driver is in<br />

possession n of either the train staff or a train staff ticket.<br />

i6.—The<br />

person handing a staff to a driver must inform him whether an<br />

engine t or train has preceded him. When the driver has a ticket he will know<br />

that no train has preceded him.<br />

i<br />

s<br />

n<br />

e<br />

c<br />

e<br />

s<br />

s<br />

a<br />

r<br />

y<br />

f<br />

o<br />

r<br />

t<br />

h<br />

FRANKLAND JUNCTION AND FRAIVIWELLGATE BANK FOOT,<br />

INCLUDING FOSTER'S SIDING.<br />

1.--In the event of both staff and ticket being in use on the Branch, no<br />

other engine must be allowed to enter the single line until the staff has been<br />

returned and given to the signalman, except as shewn below.<br />

2.—When two engines for the Colliery Branch arrive at the Junction<br />

simultaneously, or any engine arrives and a second engine is timed to arrive<br />

shortly afterwards, the driver of the first engine must take the ticket, leaving<br />

the staff for the second engine, and on return from the Colliery the last engine<br />

must carry the staff.<br />

3.—When one engine is already in the Colliery and another arrives, the<br />

guard of the second train must walk to the Bank Foot in order to arrange<br />

with the guard of the first train as to the working. • ( O . 4148).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!