05.04.2013 Views

MCset 4 - 24 kV - engineering site - Schneider Electric

MCset 4 - 24 kV - engineering site - Schneider Electric

MCset 4 - 24 kV - engineering site - Schneider Electric

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mobile part operation<br />

Height (H) of ceiling for tunnel<br />

installationI<br />

It is necessary to have a height<br />

Installation above the<br />

switchboard<br />

Marking<br />

<strong>Schneider</strong> <strong>Electric</strong><br />

General<br />

Operating position.<br />

Plug-in position.<br />

Withdrawn position.<br />

Insertion / extraction position.<br />

Recommendations<br />

of ceiling H u 2.80m to install a tunnel (even 2.90m for internal arc<br />

performance 31.5kA - 0.15s).<br />

All type of equipment installation such as lamp or light are forbidden.<br />

It is compulsory forbidden to walk on the<br />

parts bearing this marking.<br />

It is compulsory forbidden to remove<br />

the parts bearing this marking when the<br />

equipment is energised.<br />

07897542EN indice: D0 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!