Mobile part operation<br />
Height (H) of ceiling for tunnel<br />
installationI<br />
It is necessary to have a height<br />
Installation above the<br />
switchboard<br />
Marking<br />
<strong>Schneider</strong> <strong>Electric</strong><br />
General<br />
Operating position.<br />
Plug-in position.<br />
Withdrawn position.<br />
Insertion / extraction position.<br />
Recommendations<br />
of ceiling H u 2.80m to install a tunnel (even 2.90m for internal arc<br />
performance 31.5kA - 0.15s).<br />
All type of equipment installation such as lamp or light are forbidden.<br />
It is compulsory forbidden to walk on the<br />
parts bearing this marking.<br />
It is compulsory forbidden to remove<br />
the parts bearing this marking when the<br />
equipment is energised.<br />
07897542EN indice: D0 - 5