09.04.2013 Views

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

List <strong>of</strong> Figures<br />

No. Title Sec./Pg.<br />

Fig. 1.1: Project Location 1-2<br />

Fig. 1.2: Conceptual <strong>Development</strong> Plan 1-5<br />

Fig. 1.2a: Elevation Contours in relation to Placement <strong>of</strong> Buildings 1-8<br />

Fig. 1.2b: Elevation Contours in relation to Placement <strong>of</strong> Buildings (Cont’d) 1-9<br />

Fig. 1.2c: Elevation Contours in relation to Placement <strong>of</strong> Buildings (Cont’d) 1-10<br />

Fig. 1.3a: Phase I <strong>of</strong> <strong>Development</strong> 1-11<br />

Fig. 1.3b: Phase 2 <strong>of</strong> <strong>Development</strong> 1-12<br />

Fig. 1.4: <strong>Development</strong> Components at Nova Pier. 1-13<br />

Fig. 1.5a: Roads and Paths from Nova Pier to Proposed Project Site. 1-14<br />

Fig. 1.5b: On-Site Project Roads and Pathways 1-15<br />

Fig. 1.6: Project Contour Map 1-16<br />

Fig. 1.7a: Over-water Buildings, Piers and Boardwalk Plan 1-17<br />

Fig. 1.7b: Typical Over-water Cabana and Pier End View 1-18<br />

Fig. 2.1: Ecosystems Map <strong>of</strong> Proposed Project Area 2-2<br />

Fig. 2.2: Soundings or Depth Pr<strong>of</strong>ile in Nearshore Areas <strong>of</strong> Project Site 2-3<br />

Fig. 2.3A: Vegetation Classification <strong>of</strong> Greater BCNP/MR 2-12<br />

Fig. 2.3B: Vegetation Map <strong>of</strong> Project Site 2-13<br />

Fig. 2.4: BCNP/MR Zoning Scheme 2-75<br />

Fig. 2.5: Sediment Pr<strong>of</strong>ile and Groundwater Availability at Project Site 2-78<br />

Figure 4.1 Rainfall Isopleths <strong>of</strong> <strong>Belize</strong> 4-6<br />

Fig. 4.2 Water Harvesting Layout for the Proposed Project. 4-9<br />

Fig. 4.3 Typical R.O. well Section 4-10<br />

Fig. 4.4 Typical Brine Injection Well 4-11<br />

Fig. 4.5 Recycled wastewater treatment plan 4-13<br />

Fig. 4.6 Water Sampling sites for the ABR Project 4-16<br />

Fig. 5.1 Proposed Project Sewer Treatment Zones 1 5-7<br />

Fig. 5.2 Proposed Sewer Treatment Zones (2 &3) 5-8<br />

Fig. 6.1 Above Ground Storage Tank that will be used for ABR 6-5<br />

Fig. 9.1 Rural Communities & Urban Centers near the Project site 9-2<br />

Fig. 9.2 Reef Cuts In the Region <strong>of</strong> the Proposed <strong>Development</strong> Site 9-9<br />

Fig. 9.3 Laguna Cantena facing north showing a portion <strong>of</strong> Rocky Point on the<br />

bottom left and a portion <strong>of</strong> the proposed development site facing east. 9-10<br />

Fig. 9.4 Proposed Road to Project <strong>Development</strong> Site 9-12<br />

Fig. 9.5 Dive Sites at <strong>Ambergris</strong> <strong>Caye</strong> and the Region <strong>of</strong> the Proposed<br />

<strong>Development</strong> 9-15<br />

Fig. 9.6 Bacalar Chico National Park and Marine Reserve (BCNP/MR) 9-23<br />

Fig. 9.7 Management Zones within the BCNP/MR <strong>Ambergris</strong> <strong>Caye</strong> 9-26<br />

Fig. 9.8 Protected Areas in the Region <strong>of</strong> the Proposed <strong>Development</strong> 9-28<br />

Fig. 10.1: Environmental Impact Cycle 10-1<br />

ix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!