RENOVATION AND ADDITION TO THE NEW MUSIC BUILDING


Site Plan

PROPOSED


Level 1 – Ground Floor

PROPOSED


Level 2 – First Floor

PROPOSED


Level 3 – Second Floor

PROPOSED


Level 4 – Third Floor

PROPOSED


Level 5 – Fourth Floor

PROPOSED


Level 6 – Fifth Floor

PROPOSED


Elevations

PROPOSED


Elevations

PROPOSED


Building Sections

BUILDING SECTION


RENOVATION AND ADDITION TO THE NEW MUSIC BUILDING


RENOVATION AND ADDITION TO THE NEW MUSIC BUILDING


RENOVATION AND ADDITION TO THE NEW MUSIC BUILDING


Level 1 – Ground Floor

TALBOT COLLEGE – PROPOSED WITH LIBRARY


Level 2 – First Floor

TALBOT COLLEGE – PROPOSED WITH LIBRARY


Level 3 – Second Floor

TALBOT COLLEGE – PROPOSED WITH LIBRARY


Level 4 – Third Floor

TALBOT COLLEGE – PROPOSED WITH LIBRARY


Schedule – Rev. 1

June-November 2012- Carry out minor renovations to Talbot

College

May 2012 to Dec 2012: Finalize design, prepare Working

Drawings, tender for construction Bids.


Schedule – Rev.1

Dec. 2012 –Move MB practice rooms and other functions from east wing MB to

Talbot College ready for January 2013 use.


Schedule – Rev. 1

Feb 2013- begin demolition of MB east wing and construction of new MB tower.

Duration: Feb 2013 to June 2014


Schedule – Rev 1.

Sept 2014- Rebuilt Music Building and new tower ready for 2014 academic year.


Schedule Rev. 1.

July & August 2014 - Relocate temporary functions into new Music Building,

move from existing building to new.

Complete minor upgrades to Talbot College.


Schedule- Rev 1.

July & August 2014- move TC Music Library to existing space in Music Building

or alternate location. Alternate plan – Library to remain in TC until May 2015.

July 2014 to January 2015: Library design, working drawings & tendering.


Schedule – Rev 1.

June 2015 to June 2016- Renovate Music Library


Schedule Rev 1.

July & August 2016 – Move temporary library from MB into newly renovated

space in Talbot College


Schedule- Rev 1.

September - December 2016- Demolish old Music Building and carry out

renovations to west elevation.


Schedule- Rev 1.

Spring 2016 –restore landscaping and walkways.

June 2016 : Project Complete


Level 4 – Third Floor

TALBOT COLLEGE - STAGING


Level 5 – Fourth Floor

TALBOT COLLEGE - STAGING


Level 1 – Ground Floor

TALBOT COLLEGE - PROPOSED


Level 2 – First Floor

TALBOT COLLEGE - PROPOSED


Level 3 – Second Floor

TALBOT COLLEGE - PROPOSED


Level 4 – Third Floor

TALBOT COLLEGE - PROPOSED


Level 5 – Fourth Floor

TALBOT COLLEGE - PROPOSED