GERMAN - IRAQI BUSINESS FORUM. - NuMOV

gcwUPQ0Ykg

GERMAN - IRAQI BUSINESS FORUM. - NuMOV

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GERMAN - IRAQI BUSINESS FORUM.

Dr. Martin Herrenknecht. Chairman of the Board of Management.

Munich, April 21, 2010.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GLOBAL TRENDS.

Population growth and urbanization

New high-capacity infrastructures to keep

people, goods and resources on the move

Longer and deep grounded tunnels in all kinds

of geologies for every traffic and utility tunnel

Huge diameter multi-purpose tunnels

Large scale infrastructure schemes with many

simultaneous sub-projects

Tunnels for megacities

High-speed trains, hydropower, irrigation,

sewage


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

PRODUCT RANGE.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT WORLDWIDE.

SUBSIDIARIES

CANADA

USA

MEXICO

REPRESENTATIVES

CHILE

UK

GERMANY UKRAINE

NETHERLANDS

FRANCE

SWITZERLAND

VENEZUELA

BRAZIL

SPAIN

ARGENTINA

ITALY

SAUDI

ARABIA

IRAN

DUBAI

INDIA

RUSSIA

CHINA

THAILAND

MALAYSIA

SINGAPORE

AUSTRALIA


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

1200

1000

HERRENKNECHT GROUP.

800

600

400

200

0

180

160

140

120

100

80

60

40

20

0

Total operating

performance in

Mio. EUR

459

594

680

874

1013

2004 2005 2006 2007 2008

Trainees average per year

112

105 101

2004 2005 2006 2007 2008

121

157

3500

3000

2500

2000

1500

1000

500

0

Employees

average per

year

1518

1665

1849

2345

2915

2004 2005 2006 2007 2008


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

TOURING THE WORLD

FOR UTILITY TUNNELLING.

New

Zealand

Moscow

and

Bogota

Mumbai

Linden, USA Berlin Cairo Jeddah


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

4th RIVER ELBE TUNNEL.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-164 | Lefortovo | Moscow | Russia

Mixshield

Diameter: 14,200mm

Tunnel length: 2,222m

Cutterhead power: 3,200 + 315kW

Customer: AO Corporation

Transstroy


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

ST. PETERSBURG:

EINE STEILE SACHE.

ST. PETERSBURG.

Escalator shaft for metro

station

Slope of 30°

S-441 St. Petersburg | Russia

EPB Shield

Diameter: 10,690mm

Tunnel length: 105m

Cutterhead power: 1.200 kW

Breakthrough 12/2009


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-300 | M-30 | Madrid | Spain

EPB Shield

Diameter: 15,200mm

Tunnel length: 3,650m

Cutterhead power: 12,000 + 2,000kW

Torque: 125,268kNm

Customer: Ferrovial Agromán, S.A.;

NECSO Entrecanales Cubiertas, S.A.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GROWTH MARKET NORTH AND SOUTH AMERICA.

Arrowhead

Atlanta

Los Angeles

New York

Portland

Caracas

Mexico City

Sao Paulo


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Xinjiang

Chengdu

Xi´an

Chongqing

Jinping

Guangzhou

Beijing Dalian

Zhengzhou

Tianjin

Nanjing

Chongming

Shanghai

Wuhan Hangzhou

Shenzhen

Hongkong

Shenyang


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Herrenknecht (Guangzhou) Tunnelling

Equipment. Guangzhou (Free Trade

Zone).

Herrenknecht Tunnelling Machinery,

Nansha. Guangzhou (Nansha

Development Zone).

Herrenknecht Tunnelling Equipment,

Chengdu. Sichuan Province.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-317 and S-318 | Changjiang Under River

Tunnel | Shanghai | China

2 Mixshields

Diameter: 15,430mm

Tunnel length: 7,470m

Customer: Shanghai Changjiang

Tunnel & Bridge Construction Co.,Ltd.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-349 and S-350 | Nanjing Yangtze

River Crossing | China

2x Mixshield

Shield diameter: 14,930mm

Cutterhead power: 3,750kW

Torque: 34,730kN

Weight: 3,300t

Length: 135m

Customer: China Railway Shisiju

Group Corporation CRSS

Breakthrough

05/2009 and 08/2009


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GUANGZHOU:

70 PROJECTS WITH

HERRENKNECHT MACHINES

FOR MORE THAN 140

KILOMETERS OF NEW METRO

TUNNEL.

June 2009


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT‘S

LARGEST GRIPPER

TBM.

S-405 Jinping

Diameter

12,400mm

16.7 kilometers of

tunnel through

hard rock for

hydropower


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-335 Hong Kong Kowloon Southern Link KDB 200

Mixshield

Shield diameter:

7,990mm

Tunnel length:

2,383m

Geology: Granite (completely and

moderately decomposed)

Customers: Kumagai Gumi Co. Ltd.; John

Holland Engineering Pty. Ltd.; Leighton

Contractors Pty. Ltd.; Balfour Beatty Ltd.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-357 | Castle Peak Cable Tunnel | Hong Kong

Double Shield TBM

Diameter: 5,180mm

Tunnel length: 4,560m

Cutterhead power: 1,750kW

Geology: Medium grained

granite

Customer: Dragages Hong

Kong Ltd.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-486 and S-487 | West Drainage

Tunnel | Hong Kong

2x Double Shield TBM

Diameter: 8,280mm /

7.210mm

Tunnel length: 6,640m /

4.360m

Cutterhead power: 3,150kW

/ 2.800kW

Geology: Granite, volcanic

rock

Customer: Dragages Hong

Kong Ltd.; Nishimatsu

Construction Co. Ltd.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

S-375 and S-376 | North-South Bypass Tunnel | Brisbane | Australia

2x Double Shield TBM

Diameter: 12,340mm

Tunnel length: 3,997m

+ 3,932m

Geology: Welded tuff, arenites, phyllits

with quartz veins, faulted rock

Customer: Baulderstone Hornibrook;

Bilfinger Berger AG; Leighton

Contractors


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

NORTH-SOUTH BYPASS TUNNEL. BRISBANE.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

4 HERRENKNECHT GRIPPER TBM

FOR THE WORLD‘S LONGEST RAILWAY TUNNEL.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

A MASTERPIECE AT ST. GOTTHARD.

Bodio - Faido

S-210 East Tunnel

September 6, 2006

Bodio - Faido

S-211 West Tunnel

Oktober 26, 2006


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Deep vertical drilling for

geothermal energy

Founded 2005

Terra Invader 350

Hook load 350 t

Depth of drilling 5,000 m at larger

diameters (13 3/8“ to ca. 3,000m),

7,000 m at smaller diameters


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

DEEP DRILLING RIG TI-350-T IN

BRAZIL.

Aracas | BraZIL

TI-350 T (B-006)

Depth: 2,841m 1st drilling

2,907m 2nd drilling

Customer: Petrobras

Operator: San Antonio

International


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT IN THE NEAR AND MIDDLE EAST.

Ägypten

Libanon

Kuwait

Iran

Saudi- VEA

Arabien

Indien


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

INFRASTRUCTURE IN IRAQ.

PERSPECTIVES.

Iraq plans to invest more than USD 150bn for reconstruction by

2025, including housing, agriculture, transportation, healthcare,

communication

Major new metro project in Baghdad (USD 3bn project)

Enhancing infrastructure, e.g. build up of seven new airports and

seven new ports in Basra

Completion of several road reconstruction projects in 2008 and

2009


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

WATER AND SEWAGE TUNNELS IN BAGHDAD.

1982: 2 km of water tunnel

East Baghdad Sewage Main

Trunk

Tunnelling since 2008

EPB2000TB


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

BAGHDAD METRO.


H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

THINK POSITIVE.

TOGETHER WE BUILD THE FUTURE.

More magazines by this user