TUZLA Geothermal Power Plant - NuMOV

gcwUPQ0Ykg

TUZLA Geothermal Power Plant - NuMOV

ENDA ENERJİ HOLDİNG A.Ş.

COMPANY INTRODUCTION

23rd – 26th February 2010 – Offenburg / Germany


nda Enerji Holding A.Ş.

Founded in 1993, İzmir, by >100 Businesmen &

Industrialists mainly from the Aegean Region.

The reason for establishment was Privatization of Electricity

Distribution Services for “İzmir-Manisa” Region.

Founder of GEDAŞ (Elec.Distrb.Co.) in 1995. Focused on

Power Generation by 1996.

Unique Holding Company in TR, active only in energy

business (development, realization, operation and trading).

CAPITAL : 60.000.000,‐ TL

ESTABLISMENT

OF GEDAŞ

ENDA FOCUSED ON

GENERATION

ESTABLISMENT OF

EGENDA

1.PLANT IN OPER.

GÖNEN HES

ESTABLISMENT

OF ENDA

MILESTONES

ESTABLISMENT

OF EMRA

2.PLANT IN OPER.

PAMUK HES

3. + 4. PLANTS IN OPER.

SU + ANTALYA

ANTALYA CAPA.EXT.

IN OPER.

5.PLANT IN OPER.

AKÇAY HES

6.PLANT IN OPER.

TUZLA J

2


nda Group Companies (Power Plants)

Enda Holding Shares in Affiliates

65,46% 50,00% 37,67% 90,00%

*5,00%

35,00%

80,00%

*11,50%

* : INDIRECT SHARES

*62,19%

*37,14%

3


genda Ege Enerji A.Ş.

hares in Affiliates

3,62%

10,99%

CAPITAL(PAID‐IN)

119.400 TL

10,00%

95,00%

IZMIR AND MANISA

METROPOLITAN

MUNICIPALITY

•PIONEERED BY ENDA

(CHAIRMAN FROM ENDA).

•SHARE ‐ STRUCTURE WILL

BE CHANGED .

99,99%

30,00%

* : INDIRECT SHARES

4


nda Enerji Holding / Organisation Chart (Top)

5


genda Ege Enerji A.Ş. / Organisation Chart

6


Business Realisation Flow-Chart

ADVISING

ENGINEERING

& CONSULT.

CONTRACTING

EQUIP.

SUPPLIER


nda Group / Man-Power Statistics

TOTAL MAN‐POWER

100

ON COMPANY BASIS

ON QUALIFICATION BASIS ON AGE BASIS


POWER PLANTS IN OPERATION


ower Plants in Operation

GONEN HES A.Ş.

TUZLA JES A.Ş.

SU ENERJİ A.Ş.

AKÇAY HES A.Ş.

PAMUK HES A.Ş.

ANTALYA ENERJİ A.Ş. –

1

POWER PLANTS MWe OPER.DATE OPER.MODEL PLANT TYPE

GÖNEN HES A.Ş. 10,60 1Q/1998 BOT – 20 Yrs HYDRO

PAMUK HES A.Ş. 23,73 4Q/2003 IPP – 49 Yrs HYDRO

SU ENERJİ A.Ş. 4,60 3Q/2006 IPP – 40 Yrs HYDRO

ANTALYA ENJ.A.Ş. 34,92

17,46

42,00

3Q/2006

3Q/2008

2Q/2009

IPP – 20 Yrs



COGEN (N.GAS)



AKÇAY HES A.Ş. 27,78 3Q/2009 IPP – 49 Yrs HYDRO

TUZLA JES A.Ş. 7,50 1Q/2010 IPP – 40 Yrs GEOTHERMAL

10


önen HES A.Ş. / Key Figures

Plant Type : Hydro (Irrigation Dam)

Capacity : 10,6 MWe (47,2 GWh/Yr)

Location : Gönen – Balıkesir.

Commercial Operation : 1998

Operating Model : BOT – 20 Yrs

Turbine Type & Brand : Francis – Kossler/AUS

CAPITAL : 300.000,‐ TL ANNUAL GENERATION (MWh/Yr)

11


önen HES A.Ş. / Site Photos

12


amuk HES A.Ş. / Key Figures

Plant Type : Hydro (River)

Capacity : 23,7 MWe (86 GWh/Yr)

Location : Çamlıyayla – Mersin.

Commercial Operation : 4Q / 2003

Operating Model : IPP – 49 Yrs

Turbine Type & Brand : Francis – Vatech/AUS

APITAL : 17.500.000,‐ TL ANNUAL GENERATION (MWh)

13


amuk HES A.Ş. / Site Photos

14


u Enerji A.Ş. / Key Figures

Plant Type : Hydro (Irrigation Dam)

Capacity : 4,6 MWe (20 GWh/Yr)

Location : Sındırgı –Balıkesir.

Commercial Operation : 3Q / 2006

Operating Model : IPP – 40 Yrs

Turbine Type & Brand : Francis – Vatech/AUS

CAPITAL : 3.000.000,‐ TL ANNUAL GENERATION (MWh/Yr)

15


u Enerji A.Ş. / Site Photos

16


ntalya Enerji A.Ş. / Key Figures

Plant Type : N.Gas Fired Cogeneration

Capacity : 94,48 Mwe + Steam 30 t/h (14 bar)

Location : Antalya Industrial Zone – Antalya.

Commercial Operation : 3Q/2006 (34,92 MWe) + 3Q/2008

(17,46 MWe) + 2Q/2009 (42 MWe)

Operating Model : IPP (Balancing Plant) – 20 Yrs

Main Equipment & Brand : Gas Engine – Wartsila/FIN

APITAL : 15.500.000,‐ TL ANNUAL GENERATION (MWh‐Ton)

17


ntalya Enerji A.Ş. /Site Photos-1

18


ntalya Enerji A.Ş./Site Photos-2

19


kçay HES A.Ş.

Plant Type : Hydro (Irrigation Channel)

Capacity : 27,78 MWe (75,9 GWh/Yr – CAPA.FAC.: 31,2%)

Location : Nazilli – Aydın.

Commercial Operation : 3Q / 2009

Operating Model : IPP – 49 Yrs

Turbine Type & Brand : Francis – Nanping Co./ CHINA

INV.COST: 19,5 M$

EQUITY‐DEBT RATIO


kçay HES A.Ş.

21


uzla JES A.Ş.

Plant Type : Geothermal (Binary Cycle )

Capacity : 7,5 MWe (58 GWh/Yr – CAPA.FAC.: 88,3%)

Location : Tuzla/Ayvacık – Çanakkale.

Commercial Operation : 1Q / 2010

Operating Model : IPP – 40 Yrs

Turbine Type & Brand : Steam Turbine-OEC/ ISR

Power Plant (Turbine, generator and condenser) purchase

from Ormat/Israel.

Plant Type: Binary system with Iso-Pentane.The annu

stopping time app. is 72 hours.

Power output is 7.5 MW at 25°C.

• The OEC inlet;

- 693 ton/hr brine at 143°C

- 48 ton/hr steam at 4.05 bara.

• The OEC outlet :Re-injection Water; 736 ton/hr at max.

97°C


uzla JES A.Ş.


ONGOING POWER PLANT PROJECTS


ngoing Power Plant Projects

POWER PLANTS TOTAL

MWe

EGENDA A.Ş.

MORDOĞAN

EGENDA A.Ş.

İYTE – URLA

EGENDA A.Ş.

GERMİYAN

EGENDA A.Ş.

ALAÇATI

Y.KÖY A.Ş.

MORDOĞAN

EGENDA A.Ş.

MANAVG.2

EGENDA A.Ş.

EĞLENCE 1

EGENDA A.Ş.

EĞLENCE 2

TOTAL 160,00

EST.OP

DATE

13,80 2Q

2012

13,00 1Q

2012

10,80 2Q

2012

16,00 2Q

2012

15,00 1Q

2012

24,10 1Q

2012

41,80 1Q

2012

25,50 4Q

2012

OPER.

MODEL

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

PLANT

TYPE

WIND

WIND

WIND

WIND

WIND

HYDRO

HYDRO

HYDRO

EGENDA A.Ş.-MORD. EGENDA A.Ş.-MAN.-

2

EGENDA A.Ş. -İYTE EGENDA A.Ş.-EĞL.1

EGENDA A.Ş.-GERM.

EGENDA A.Ş.

ALAÇATI

YAYLAKÖY A.Ş.

EGENDA A.Ş. –

EĞL.2

25


genda Ege Enerji A.Ş.

Founded in 1995, İzmir, by >120 Businesmen &

Industrialists mainly from the Aegean Region.

Privatization of Electricity Distribution Services for “İzmir-

Manisa” Region.

Focused on Power Generation by 2001.

3 Hydro and 4 Wind Power Plant projects are developed and

licensed .

CAPITAL : 40.000.000,‐ TL

PROJECTS

MANAV.2 HEPP

EĞLENCE‐

1,2HEPP

3 WEPPs

IYTE WEPP

PRELIMINARY INVESTMENT SCHEDULE

2009 2010 2011

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4


genda Ege Enerji A.Ş.

ANAVGAT-2 HEPP

Plant Type : Hydro (River )

Capacity : 24,1 MWe (77,8 GWh/Yr – CAPA.FAC.: 36,9%)

Location : Akseki – Antalya.

Commercial Operation : Q1 / 2012

Operating Model : IPP – 49 Yrs

Turbine Type & Brand : -

ST.INV.COST: 19,7 M$ EQUITY-DEBT RATIO UPDATED SITUATION

WORKING ON LOCAL PERMISSIONS (EIA).

SOIL INVESTIGATION HAS BEEN DONE.

DESIGN WORKS STARTED.


genda Ege Enerji A.Ş.

ANAVGAT-2 HEPP

ST.INV.COST: 19,7 M$ EQUITY-DEBT RATIO UPDATED SITUATION

WORKING ON LOCAL PERMISSIONS (EIA).

SOIL INVESTIGATION HAS BEEN DONE.

DESIGN WORKS STARTED.


genda Ege Enerji A.Ş.

ĞLENCE-1 HEPP

Plant Type : Hydro (River )

Capacity : 36,1 MWe (122,8 GWh/Yr – CAPA.FAC.: 38,8%)

Location : Karaisalı – Adana.

Commercial Operation : Q4 / 2011

Operating Model : IPP – 49 Yrs

Turbine Type & Brand : -

EST.INV.COST: 38,3 M$ EQUITY‐DEBT RATIO

UPDATED SITUATION

SITE MAP WILL BE OBTAINED.

AFTER THAT SOIL INVESTIGATION

COMPANY WILL BE SELECTED.

FOLLOWING THE REALISATION OF SOIL

INVESTIGATION, DESIGN WORKS WILL BE

PERFORMED.


genda Ege Enerji A.Ş.

ĞLENCE-2 HEPP

Plant Type : Hydro (River )

Capacity : 25,5 MWe (80,6 GWh/Yr – CAPA.FAC.: 38,8%)

Location : Karaisalı – Adana.

Commercial Operation : Q1 / 2012

Operating Model : IPP – 49 Yrs

Turbine Type & Brand : -

ST.INV.COST: 26,6 M$ EQUITY-DEBT RATIO UPDATED SITUATION

SITE MAP WILL BE OBTAINED.

AFTER THAT SOIL INVESTIGATION

COMPANY WILL BE SELECTED.

FOLLOWING THE REALISATION OF SOIL

INVESTIGATION, DESIGN WORKS WILL BE

PERFORMED.


genda Ege Enerji A.Ş.

ĞLENCE-1 & 2 HEPP /Site

EĞL‐1 COST: 38,3 M$ EQUITY‐DEBT RATIO

UPDATED SITUATION

EĞL‐2 COST: 26,6 M$

SITE MAP WILL BE OBTAINED.

AFTER THAT SOIL INVESTIGATION

COMPANY WILL BE SELECTED.

FOLLOWING THE REALISATION OF SOIL

INVESTIGATION, DESIGN WORKS WILL BE

PERFORMED.


genda Ege Enerji A.Ş.

WEPP Projects

POWER PLANTS TOTAL

MWe

EGENDA A.Ş.

MORDOĞAN

EGENDA A.Ş.

İYTE – URLA

EGENDA A.Ş.

GERMİYAN

EGENDA A.Ş.

ALAÇATI

CAPA.FAC.

%

INVEST.

COST. M$

EQUITY

M$

OPER.

DATE

13,80 44,6 % 23,7 20% 2Q

2012

13,00 46,1 % 23,6 20% 1Q

2012

10,80 40,0 % 17,7 20% 2Q

2012

16,00 35,6 % 30,8 20% 2Q

2012

TOTAL 53,60 ‐ 95,8 19,2 ‐

WEPP COST: 95,8 M$ EQUITY-DEBT RATIO UPDATED SITUATION

PREVIOUS WIND MESUREMENTS ARE

BEING CROSS CHECKED (70 MT HIGH

MASTS).

LOCAL PERMISSION PROCESS HAS BEEN

STARTED.

INVESTMENT MODEL FOR TRANSMISSION

LINE IS ALMOST FIXED WITH TEİAŞ


aylaköy RES A.Ş.

YAYLAKÖY PROJECT IS BEING MANAGED

TOGETHER WITH OTHER EGENDA WEPP PROJECT.

POWER PLANTS TOTAL

MWe

YAYLAKÖY

A.Ş.

CAPA.FAC.

%

INVEST.

COST. M$

EQUITY

M$

OPER.

DATE

15,00 43,8 % 28,8 20% 2Q

2011

TOTAL 15,00 ‐ 28,8 5,76 ‐

INV.COST: 28,8 M$ EQUITY‐DEBT RATIO

UPDATED SITUATION

PREVIOUS WIND MESUREMENTS ARE

BEING CROSS CHECKED (70 MT HIGH

MASTS).

LOCAL PERMISSION PROCESS HAS BEEN

STARTED.

INVESTMENT MODEL FOR TRANSMISSION

LINE IS ALMOST FIXED WITH TEİAŞ


WEPP PROJECT / LOCATIONS


WEPP PROJECT / LOCATIONS


OWER PLANTS BY 2012

POWER PLANTS TOTAL

MWe

OPER.

DATE

OPER.

MODEL

PLANT

TYPE

GÖNEN HES 10,60 1Q/1998 BOT‐20 Yrs HYDRO

PAMUK HES 23,73 4Q/2003 IPP‐49 Yrs HYDRO

SU ENERJİ 4,60 3Q/2006 IPP‐40 Yrs HYDRO

ANTALYA ENERJİ 94,38 3Q/2006 IPP‐20 Yrs CO‐GEN

AKÇAY HES A.Ş. 27,78 3Q/2009 IPP‐49 Yrs HYDRO

TUZLA JES A.Ş. 7,50 1Q/2010 IPP‐40 Yrs GEOTHR.

EGENDA A.Ş.

MORDOĞAN

EGENDA A.Ş.

İYTE – URLA

EGENDA A.Ş.

GERMİYAN

EGENDA A.Ş.

ALAÇATI

Y.KÖY A.Ş.

MORDOĞAN

EGENDA A.Ş.

MANAVG.2

EGENDA A.Ş.

EĞLENCE 1

EGENDA A.Ş.

EĞLENCE 2

TOTAL 324,49

13,80 4Q

2011

13,00 2Q

2011

10,80 4Q

2011

16,00 4Q

2011

15,00 2Q

2011

24,10 4Q

2010

36,10 4Q

2011

27,10 4Q

2010

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

49 Yrs

IPP

40 Yrs

IPP

49 Yrs

IPP

49 Yrs

WIND

WIND

WIND

WIND

WIND

HYDRO

HYDRO

HYDRO

EGENDA A.Ş.‐MORD. EGENDA A.Ş.‐MAN.‐2

EGENDA A.Ş. ‐İYTE EGENDA A.Ş.‐EĞL.1

EGENDA A.Ş.‐GERM.

EGENDA A.Ş. ALAÇATI

YAYLAKÖY A.Ş.

EGENDA A.Ş. –EĞL.2

36


NSTALLED POWER

We

YEARS

324,49

37


NNUAL SALES IN 2010 & 2012

POWER PLANTS TOTAL

MWe

ANNUAL GENERATION

MWh/Yr

ANNUAL SALES

USD/Yr

GÖNEN HES 10,60 45.000 1.770.000 HYDRO

PAMUK HES 23,73 70.000 7.000.000 HYDRO

SU ENERJİ 4,60 15.000 1.500.000 HYDRO

ANTALYA ENERJİ 94,38 550.000 67.833.000 CO‐GEN

AKÇAY HES A.Ş. 27,78 75.000 7.500.000 HYDRO

TUZLA JES A.Ş. 7,50 52.000 5.200.000 GEOTHERMAL

SUB TOTAL‐1 168,59 807.000 90.803.000

EGENDA A.Ş. – MORDOĞAN 13,80 53.916 5.391.600 WIND

EGENDA A.Ş. ‐ İYTE – URLA 13,00 52.499 5.249.900 WIND

EGENDA A.Ş. – GERMİYAN 10,80 37.843 3.784.300 WIND

EGENDA A.Ş. – ALAÇATI 16,00 49.497 4.949.700 WIND

EGENDA A.Ş. ‐ MANAVG.2 24,10 77.800 7.780.000 HYDRO

EGENDA A.Ş. ‐ EĞLENCE 1 41,80 131.736 13.170.000 HYDRO

EGENDA A.Ş. ‐ EĞLENCE 2 25,50 80.666 8.070.000 HYDRO

Y.KÖY A.Ş. ‐ MORDOĞAN 15,00 57.553 5.755.300 WIND

SUB TOTAL‐2 160,00 541.510 54.150.800

GRAND TOTAL 328,59 1.348.510 144.953.800

PLANT

TYPE

38


NNUAL SALES IN 2010 & 2012

23rd – 26th February 2010 – Offenburg / Germany

39


othermal energy is “renewable” and “sustainable” form

of energy.

der suitable operation conditions, it has infinite lifetime.

Geothermal Energy is a Clean form of energy.

esn’t Create any pollution to the environment like fossil.

No dependance to outside.


DIFFERENT USAGE OF GEOTHERMAL RESERVOIRS

A-) Low (20-70 °C) temperature reservoirs are mainly used;

- In heating (greenhouse, drying of foods, heat pumps,

agriculture,etc.),

- Thermal tourism and Balneological

- In industry (timber process, paper and weaving, leather sector,

cooling facilities, production of chemical substances.)

B-) Medium temperature (70-120 °C) and high temperature

(greater than 120 °C) reservoirs are used;

- In electricity production,

- Depending on re-injection conditions, in addition to above

applications, district heating applications..


GEOTHERMAL ENERGY IN TURKEY

Geothermal Potential o

Turkey:31.500 MWt

About geotherm

potential it is the 7

country in the world an

1 th country in Europe.


High Temperature Geothermal fields are concentrated in

Western Anatolia


Geothermal fields in Turkey for

electricity production and their potentials

Geothermal Area Temperature(°C)

2013 Potentials

(MWe)

1 Denizli-Kizildere 200-242 85

2 Aydin-Germencik 200-232 130

3 Izmir-Balcova 136 5

4 Izmir-Dikili 130 30

5 Canakkale-Tuzla 174 80

6 Aydin-Salavatli 171 65

7 Kutahya-Simav 162 35

8 Izmir-Seferihisar 153 35

9

Manisa-Salihli-

Caferbey

150 20

10 Aydin-Sultanhisar 145 20

11 Aydin-Yilmazkoy 142 20

12 Aydin-Hidirbeyli 143 10

13 Aydin-Atca 124 5

14

Manisa-Alasehir-

Kavaklidere

213 30

15 Aydın-Umurlu 155 25

Tuzla is one of

the important

region with

80 MWe potentia

and 174 °C

temperature.

Note: These datas are from


oya City

sos

Tuzla GEPP Project

Tuzla GEPP Project located in city of ÇANAKKALE, 5 km away Gülpınar town

region


Tuzla GEPP Project

• The first Study of Tuzla Geothermal Field was conducted by MTA in 1966

• First exploration and production Well (T‐1) was drilled in 1982 at depth

of 814 meters with 174 °C as artesian. After 3 more additional

geothermal wells, the characteristics of the field was specified.

• Geoscience Ltd. Report 1989

• DARDANEL had a contract with MTA (Mineral Research and Exploration

Institute) for the utility of Tuzla Area starting for 49 years at 29.09.2003.

• DARDANEL applied to EMRA (Energy Market Regulating Association) and

got the production license for 40 years starting from 11.05.2004.

• EGENDA bought 95% of the company on 21.03.2007

• After Geothermal Law no.5686, the Operating License from the City of

Çanakkale was received on 11.03.2008.

• Tuzla Jeotermal Enerji A.Ş. Well drillings, Power Plant Construction 2008

‐ 2009


3,5km

T‐15

T‐10

T‐8

Tuzla Geothermal Area

3km

T‐11 3,9km

T‐3

T‐4

T‐1

T‐7

T‐16

T‐9

T‐5

T‐2

3,2km

Total area

11,16km 2

Wells belong to TUZLA;

T‐5, T‐7, T‐8, T‐9, T‐10, T

11, T‐15, T‐16

Wells belong to MTA;

T1, T2,T3,T4


WELL DRILLINGS IN TUZLA

Rig Info:

F. Cooper LTO-750

Self Propelled Trailer

112 ft Height

545.000 lbs Gross

Capacity

350.000 lbs Hook Load

w/8 lines.

Substructure:

DEILMANN

Drawworks:

F. Cooper LTO-750

Drive Group:

AllisonCLBT-5860


Nr

Well

Name

Depth of

Well

(m)

Tuzla GEPP Wells

Drilling

Method

Max.

Temperature

and Depth

Average

Predicted

Temperature

Of Well floor

Estimated

Production

Temperature

( 0 C)

WHP

(vane

closed)

(Bar)

1 T‐5E 40 Blowout Due to absence of covering layer entered early into reservoir.

2 T‐7E 870 Finished 475m‐154 0 C ‐‐‐‐‐‐ ‐‐‐‐‐‐ 0

3 T‐8E 1100 Finished 1050m‐144 0 C ‐‐‐‐‐‐ ‐‐‐‐‐‐ 0

4 T‐9E 540 Finished 220m‐174 0 C 175 0 C 149 0 C 3,3

5 T‐10E 927 Finished 900m‐151 0 C 151 0 C 137 0 C 5,6

6 T‐15E 871 Finished 270m‐153 0 C 145 0 C 137 0 C 6

7 T‐16E 556,5 Finished 510m‐176 0 C 176 0 C 149 0 C 4,5

8 T‐11EC 750±250 Finished 795m‐

127 0 C

127 0 C Injection index: 4,2lt/sn/bar

According to feasibility report of Japanese company West JEC in 2006,the capacity of th

field is approximately Min. 25‐30 MWe.


High Salinity (40.000 – 50.000 ppm CL); High Scaling Tendency (9.000 ppm

CaCO3)

(CaCO 3 ) Scaling

problem was solved by

using inhibitors.


2 production wells (T‐9, T‐16), and two re‐injection wells (T‐10, T‐

15) are selected for the electricity production of 7,5MWe

capacity.

Location of Çanakkale‐Tuzla T‐16E ve T‐9E wells during the production test


BOP – Balance of Plant (Steam & Brine Gathering System)

After the realization of Production and

Reinjection wells,

BOP was engineered together with Project

Engineering Firm and Consulting companies.

BOP covers;

Wellhead Separators and Brine Pumps

Steam and Brine Pipelines

Control, Block and Check Valves

BOP Conceptual Model and Control System


BOP – Balance of Plant (Steam & Brine Gathering System)


TUZLA Geothermal Power Plant

Ormat Energy Converter (OEC)

Power Plant (Turbine, generator an

condenser) purchased from Ormat/Israe

• TYPE: Binary system with Iso‐Pentane.Th

annual stopping time app. is 72 hours.

Power output is 7.5 MW at 25°C.

• The OEC will utilize;

‐ 693 ton/hr brine at 143°C

‐ 48 ton/hr steam at 4.05 bara.

• Re‐injection Water; 736 ton/hr, at Max

97°C


OEC SCADA


TUZLA GEPP Heat & Mass Diagram


TUZLA Geothermal Power Plant

After OEC and BOP installation was completed,

Commissioning and Start-up of the Plant was realized

13.01.2010.


ENDA ENERJİ HOLDİNG A.Ş.

TUZLA JEOTERMAL ENERJİ A.Ş.

THANK YOU FOR YOUR ATTENTION…

More magazines by this user