19.05.2013 Views

Sewall construction and maintenance - City of Punta Gorda

Sewall construction and maintenance - City of Punta Gorda

Sewall construction and maintenance - City of Punta Gorda

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Construction in Waterways<br />

Criteria <strong>and</strong> Limitations<br />

* Structures must be placed within an area extending<br />

waterward at a 45° angle from property’s seawall at the<br />

side property lines, not to exceed 25’ waterward from<br />

seawall, nor encroach 25’ <strong>of</strong> established centerline <strong>of</strong><br />

waterway except: In waterways where width is less than<br />

100’ or in waterways not seawalled, structures will be<br />

placed to not exceed 10’ waterward unless 50’ passageway<br />

can be maintained.<br />

* Construction (single family homes) is permitted to<br />

dedicated public platted canals for freest<strong>and</strong>ing concrete<br />

docks protruding no more than 10’ waterward from<br />

seawall <strong>and</strong> on lots having at least 85’ <strong>of</strong> seawall length:<br />

a) a boat lift <strong>and</strong> up to 3 outpilings, or b) up to 6<br />

outpilings, or c) 2 boat lifts.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!