Figure 9: Goal 2-related projects in Police, Defence, Quick-Wins, and CGS as moni<strong>to</strong>red are shown below.<br />
1400<br />
1200<br />
1000<br />
800<br />
600<br />
400<br />
200<br />
0<br />
The projects implemented through the Quick-<br />
Wins, CGS, Police and the Ministry <strong>of</strong> Defence<br />
were mostly projects for the construction <strong>of</strong><br />
classroom blocks, VIP <strong>to</strong>ilets, library and ICT<br />
centres and the supply <strong>of</strong> school furniture and<br />
learning materials. These projects have aided<br />
greatly in providing school space additional access<br />
and participation within the various communities<br />
particularly in schools where capacity for further<br />
enrolment had been constrained by limited<br />
infrastructure. These interventions have also<br />
enhanced the quality <strong>of</strong> education delivery in<br />
public schools while helping in attracting more<br />
girls <strong>to</strong> school in some cases due <strong>to</strong> the<br />
Figure 8: Status <strong>of</strong> Education Projects and Programmes in 2009<br />
93<br />
757<br />
Completed Ongoing Abandoned Not Started Not Located<br />
CGS 25 1 1 9 3<br />
Defence 55 14 6<br />
Police 8 2 1<br />
45<br />
3<br />
construction <strong>of</strong> VIP <strong>to</strong>ilets that were deliberately<br />
designated for and labelled for use by gender.<br />
However, the education-related Quick-Wins<br />
projects that were initially designed for<br />
completion within the shortest possible time <strong>to</strong><br />
serve the target communities could not be<br />
accomplished with a large number <strong>of</strong> them still<br />
outstanding at the time <strong>of</strong> reporting. This has<br />
reduced immediate access and beneficiaries<br />
‗advantages. Hence such projects did not deliver<br />
the desired impact in those communities.<br />
Indica<strong>to</strong>rs<br />
Conpleted<br />
Ongoing<br />
Not Started<br />
Abandoned<br />
CGS<br />
Defence<br />
Police<br />
Quick-Wins<br />
For the achievement <strong>of</strong> MDG 2, there are a<br />
number <strong>of</strong> indica<strong>to</strong>rs that serve the purpose <strong>of</strong><br />