Figure 9: Goal 2-related projects in Police, Defence, Quick-Wins, and CGS as moni<strong>to</strong>red are shown below.<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

The projects implemented through the Quick-<br />

Wins, CGS, Police and the Ministry <strong>of</strong> Defence<br />

were mostly projects for the construction <strong>of</strong><br />

classroom blocks, VIP <strong>to</strong>ilets, library and ICT<br />

centres and the supply <strong>of</strong> school furniture and<br />

learning materials. These projects have aided<br />

greatly in providing school space additional access<br />

and participation within the various communities<br />

particularly in schools where capacity for further<br />

enrolment had been constrained by limited<br />

infrastructure. These interventions have also<br />

enhanced the quality <strong>of</strong> education delivery in<br />

public schools while helping in attracting more<br />

girls <strong>to</strong> school in some cases due <strong>to</strong> the<br />

Figure 8: Status <strong>of</strong> Education Projects and Programmes in 2009<br />

93<br />

757<br />

Completed Ongoing Abandoned Not Started Not Located<br />

CGS 25 1 1 9 3<br />

Defence 55 14 6<br />

Police 8 2 1<br />

45<br />

3<br />

construction <strong>of</strong> VIP <strong>to</strong>ilets that were deliberately<br />

designated for and labelled for use by gender.<br />

However, the education-related Quick-Wins<br />

projects that were initially designed for<br />

completion within the shortest possible time <strong>to</strong><br />

serve the target communities could not be<br />

accomplished with a large number <strong>of</strong> them still<br />

outstanding at the time <strong>of</strong> reporting. This has<br />

reduced immediate access and beneficiaries<br />

‗advantages. Hence such projects did not deliver<br />

the desired impact in those communities.<br />

Indica<strong>to</strong>rs<br />

Conpleted<br />

Ongoing<br />

Not Started<br />

Abandoned<br />

CGS<br />

Defence<br />

Police<br />

Quick-Wins<br />

For the achievement <strong>of</strong> MDG 2, there are a<br />

number <strong>of</strong> indica<strong>to</strong>rs that serve the purpose <strong>of</strong><br />