to download PDF of full document - SPARC Nigeria
to download PDF of full document - SPARC Nigeria
to download PDF of full document - SPARC Nigeria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
also fashioned out DRGs-funded projects <strong>to</strong>ward<br />
meeting the targets enumerated above.<br />
A <strong>to</strong>tal <strong>of</strong> 7,190 intervention projects in the 2009<br />
budget were geared <strong>to</strong>wards achieving Goal 7 <strong>of</strong><br />
the MDGs on sustainable development. The<br />
projects were spread among different MDAs<br />
including Federal Ministry <strong>of</strong> Housing, which had<br />
182 projects, the Federal Ministry <strong>of</strong> Police<br />
Affairs with 41 projects (worth N500m) and the<br />
Federal Ministry <strong>of</strong> Defence with 24 projects.<br />
Special Projects in the Quick-Wins Sec<strong>to</strong>r (with<br />
3,039 projects worth N5.981bn) and the<br />
Conditional Grants Sec<strong>to</strong>r (with 3,904 projects<br />
worth N19.883bn) were appropriated.<br />
Five interventions dealing mainly with the<br />
maintenance <strong>of</strong> the National Parks focused on<br />
ensuring the sustainability <strong>of</strong> the nation‘s endemic<br />
flora and fauna attempted <strong>to</strong> address Target 9. The<br />
interventions were managed by Federal Ministry<br />
<strong>of</strong> Environment.<br />
Under the 10 th target, 6,114 water supply projects<br />
were earmarked with 2,158 <strong>of</strong> them under the<br />
Quick-Wins and 3,775 under the CGS special<br />
interventions. Also 900 public <strong>to</strong>ilet projects<br />
aimed at improving basic sanitation were<br />
proposed. 771 <strong>of</strong> these projects were under Quick-<br />
Wins and 129 <strong>of</strong> them were components <strong>of</strong> the<br />
CGS.<br />
With regards <strong>to</strong> Target 11, there are a <strong>to</strong>tal <strong>of</strong> 271<br />
interventions with 240 in the Housing Sec<strong>to</strong>r<br />
aimed at upgrading slums (construction <strong>of</strong> roads<br />
and drainages, street lights, civic centres, etc.) and<br />
31 projects in the Police sec<strong>to</strong>r dealing with<br />
housing improvements in police barracks.<br />
Findings<br />
A <strong>to</strong>tal <strong>of</strong> 4,621 projects (or 64% <strong>of</strong> the <strong>to</strong>tal) were<br />
reported on. The average percentage completion<br />
<strong>of</strong> these projects is 59.6%, with a % quality<br />
compliance <strong>of</strong> 50.31%. The breakdown <strong>of</strong> the<br />
status <strong>of</strong> these projects is as follows:<br />
Table 19: Projects Performance<br />
S/No Description Total No Completed On-going Abandoned Not started Not located<br />
1 CGS 2090 1100 430 21 440 99<br />
2 Quick-Wins 2263 1218 444 98 458 45<br />
3 Housing 202 69 33 2 47 51<br />
4 Defence 26 25 0 0 1 0<br />
5 Police 37 37 0 0 0 0<br />
TOTAL 4618 2449 907 121 946 195<br />
Overall, about 53% <strong>of</strong> the projects in Goal 7 had<br />
been completed at reporting time; 20% were ongoing;<br />
3% appeared <strong>to</strong> have been abandoned; 21%<br />
not started and 4% were not located. This finding<br />
is demonstrated graphically in the pie chart below.<br />
Page 43 <strong>of</strong> 150