01.06.2013 Views

to download PDF of full document - SPARC Nigeria

to download PDF of full document - SPARC Nigeria

to download PDF of full document - SPARC Nigeria

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

also fashioned out DRGs-funded projects <strong>to</strong>ward<br />

meeting the targets enumerated above.<br />

A <strong>to</strong>tal <strong>of</strong> 7,190 intervention projects in the 2009<br />

budget were geared <strong>to</strong>wards achieving Goal 7 <strong>of</strong><br />

the MDGs on sustainable development. The<br />

projects were spread among different MDAs<br />

including Federal Ministry <strong>of</strong> Housing, which had<br />

182 projects, the Federal Ministry <strong>of</strong> Police<br />

Affairs with 41 projects (worth N500m) and the<br />

Federal Ministry <strong>of</strong> Defence with 24 projects.<br />

Special Projects in the Quick-Wins Sec<strong>to</strong>r (with<br />

3,039 projects worth N5.981bn) and the<br />

Conditional Grants Sec<strong>to</strong>r (with 3,904 projects<br />

worth N19.883bn) were appropriated.<br />

Five interventions dealing mainly with the<br />

maintenance <strong>of</strong> the National Parks focused on<br />

ensuring the sustainability <strong>of</strong> the nation‘s endemic<br />

flora and fauna attempted <strong>to</strong> address Target 9. The<br />

interventions were managed by Federal Ministry<br />

<strong>of</strong> Environment.<br />

Under the 10 th target, 6,114 water supply projects<br />

were earmarked with 2,158 <strong>of</strong> them under the<br />

Quick-Wins and 3,775 under the CGS special<br />

interventions. Also 900 public <strong>to</strong>ilet projects<br />

aimed at improving basic sanitation were<br />

proposed. 771 <strong>of</strong> these projects were under Quick-<br />

Wins and 129 <strong>of</strong> them were components <strong>of</strong> the<br />

CGS.<br />

With regards <strong>to</strong> Target 11, there are a <strong>to</strong>tal <strong>of</strong> 271<br />

interventions with 240 in the Housing Sec<strong>to</strong>r<br />

aimed at upgrading slums (construction <strong>of</strong> roads<br />

and drainages, street lights, civic centres, etc.) and<br />

31 projects in the Police sec<strong>to</strong>r dealing with<br />

housing improvements in police barracks.<br />

Findings<br />

A <strong>to</strong>tal <strong>of</strong> 4,621 projects (or 64% <strong>of</strong> the <strong>to</strong>tal) were<br />

reported on. The average percentage completion<br />

<strong>of</strong> these projects is 59.6%, with a % quality<br />

compliance <strong>of</strong> 50.31%. The breakdown <strong>of</strong> the<br />

status <strong>of</strong> these projects is as follows:<br />

Table 19: Projects Performance<br />

S/No Description Total No Completed On-going Abandoned Not started Not located<br />

1 CGS 2090 1100 430 21 440 99<br />

2 Quick-Wins 2263 1218 444 98 458 45<br />

3 Housing 202 69 33 2 47 51<br />

4 Defence 26 25 0 0 1 0<br />

5 Police 37 37 0 0 0 0<br />

TOTAL 4618 2449 907 121 946 195<br />

Overall, about 53% <strong>of</strong> the projects in Goal 7 had<br />

been completed at reporting time; 20% were ongoing;<br />

3% appeared <strong>to</strong> have been abandoned; 21%<br />

not started and 4% were not located. This finding<br />

is demonstrated graphically in the pie chart below.<br />

Page 43 <strong>of</strong> 150

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!