to download PDF of full document - SPARC Nigeria
to download PDF of full document - SPARC Nigeria
to download PDF of full document - SPARC Nigeria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CGS<br />
Not Started<br />
21%<br />
Abandoned<br />
3%<br />
Ongoing<br />
20%<br />
The performance <strong>of</strong> each sec<strong>to</strong>r in Goal 7 projects is presented below:<br />
Not Started<br />
21%<br />
1% Abandoned<br />
Ongoing<br />
21%<br />
Not Located<br />
5%<br />
Completed<br />
53%<br />
QUICK-WINS<br />
Not Started<br />
20%<br />
Abandoned<br />
4%<br />
Ongoing<br />
20%<br />
DEFENCE Not Started POLICE<br />
4%<br />
Completed<br />
96%<br />
Compared <strong>to</strong> the previous years, a general<br />
improvement in the execution <strong>of</strong> DRGs-MDG<br />
projects was noted. Going by the above<br />
performance, about 3.3 million additional people<br />
Completed<br />
53%<br />
Not Located<br />
2%<br />
Completed<br />
54%<br />
Completed<br />
100%<br />
HOUSING<br />
Not Located<br />
25%<br />
Not Started<br />
23%<br />
Completed<br />
34%<br />
Ongoing<br />
16%<br />
Abandoned<br />
1%<br />
now have access <strong>to</strong> safe drinking water. However,<br />
widespread reports <strong>of</strong> breakdown <strong>of</strong> completed<br />
projects, especially boreholes, soon after<br />
commissioning and the inability <strong>of</strong> many <strong>of</strong> the<br />
Page 44 <strong>of</strong> 150