04.07.2013 Views

EBSC Value Drivers for Quality - Chrysler

EBSC Value Drivers for Quality - Chrysler

EBSC Value Drivers for Quality - Chrysler

SHOW MORE
SHOW LESS

Transform your PDFs into Flipbooks and boost your revenue!

Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.

Supplier <strong>Quality</strong> Metrics<br />

Monthly Detail Report<br />

Quarterly Supplier Scorecard<br />

Effective July 1, 2010<br />

<strong>EBSC</strong>-SQ@chrysler.com (Supplier Mailbox)<br />

SQE/Plant Questions:<br />

Janet.Harthen@chrysler.com<br />

jh182<br />

T/L: 722-1541<br />

1


Supplier Scorecards under <strong>EBSC</strong><br />

• Monthly Detail Report a source of data <strong>for</strong> the<br />

Quarterly Supplier Scorecard under <strong>EBSC</strong> (External<br />

Balance Scorecard)<br />

• Quarterly report is reviewed in supplier meetings<br />

and is one source of consideration <strong>for</strong> future<br />

business (bid list, source hold)<br />

• Displays data on Division/Company Roll-up and<br />

Manufacturing Location basis<br />

• Sponsored by Purchasing rather than SQ<br />

• SQ supports internal and external users regarding<br />

SQ data displayed on the Monthly and Quarterly<br />

Reports<br />

2


Supplier Quarterly Score Card<br />

3<br />

5 Equal <strong>Value</strong> <strong>Drivers</strong><br />

Delivery<br />

<strong>Quality</strong><br />

Cost<br />

20%<br />

20%<br />

20%<br />

20%<br />

20%<br />

Product Development<br />

Process<br />

NCT -10%<br />

Warranty – 10%<br />

Partnership<br />

Advance <strong>Quality</strong><br />

Planning - 20%


Sample Monthly Detail Report<br />

4


Why You Need to Know About This Process<br />

• If you are an SQE or Plant Current <strong>Quality</strong> you need to<br />

understand the importance <strong>Chrysler</strong> attaches to supplier<br />

metrics<br />

• SQEs are the front line <strong>for</strong> supplier questions<br />

• SQEs are considered subject matter experts in the<br />

parts/processes/materials in their deck code<br />

• Suppliers will ask you questions about their scorecard<br />

• The Quarterly Scorecard will be discussed in supplier<br />

reviews. You need to know how your suppliers are<br />

per<strong>for</strong>ming and where they need to improve<br />

• Numerous supplier scorecard metrics also correspond to<br />

IBSC (Internal Balance Scorecard). IBSC is your<br />

personal scorecard<br />

5


Where Can You Find Supplier<br />

Scorecards under <strong>EBSC</strong>?<br />

6


Finding <strong>EBSC</strong> in GPSIS<br />

7


Monthly Detail Report<br />

8


Select Production Parts<br />

9


Advance <strong>Quality</strong> Planning<br />

AQP<br />

10


Advanced <strong>Quality</strong> Planning<br />

The AQP measure is a percentage of required<br />

responses submitted to CQMS be<strong>for</strong>e the<br />

appropriate due date.<br />

# submitted required responses<br />

# responses required<br />

Target is 100% of responses submitted on time<br />

11


AQP Weights / Scoring <strong>for</strong> 2010<br />

Category<br />

Category 1<br />

(IRE)<br />

Category 2<br />

(Promise<br />

and Actual<br />

Dates)<br />

Category 3<br />

Category 4<br />

Category 5<br />

(PPAP<br />

Promise<br />

Dates)<br />

12<br />

Default<br />

Weights<br />

33%<br />

34%<br />

33%<br />

Due Description<br />

IRE Task Due Date is in<br />

Current Month<br />

Initial Risk Evaluation (IRE)<br />

D1, C, B, A Product Validation Testing (PVT)<br />

D1, C, B, A Production Demonstration Run (PDR)<br />

D1, C, B, A<br />

N/A - Category available at a future date.<br />

N/A - Category available at a future date.<br />

PPAP Promise Date - Dims & Labs (Dimensional<br />

Test & Material / Functional Requirements)


AQP IBSC/<strong>EBSC</strong><br />

Weights and Scoring<br />

Effective – 4 th Quarter 2010<br />

Scorecard Weights Scoring Milestones Titles Resp<br />

Category 1 20% Active Plan Create date + 14 days Initial Risk Evaluation (IRE) SQE<br />

Category 2 20%<br />

Category 3 20%<br />

Category 4 20%<br />

Gate Date Legend<br />

(CPCP/CDS):<br />

S0 SOF = D1<br />

VP/S1 SOF = C<br />

PVP/S2 SOF = B<br />

V1 SOF = A<br />

Gate D1, C, B, A with D1 being the required gate <strong>for</strong><br />

Promise or Actual Date<br />

Gate C, B, A with C being the required gate <strong>for</strong><br />

Promise or Actual Date<br />

Gate C, B, A with B being the required gate <strong>for</strong><br />

Promise or Actual Date.<br />

Gate C, B, A with C being the required gate <strong>for</strong><br />

Promise or Actual Date<br />

Production Demonstration Run (PDR) Sup<br />

*Gage Repeatability & Reproducibility Sup<br />

*Dimensional Capability Sup<br />

*Parts Inspections Standard Draft (Part I/S(d)) SQ<br />

CQMS create date + 8 wks *Process Failure Mode & Effects Analysis (PFMEA) Sup<br />

Gate C, B, A<br />

with C being the required gate<br />

Category 5 20% Gate D1, C, B, A <strong>for</strong> Promise or Actual Dates<br />

International Material Data System (IMDS) Sup<br />

PPAP - Dim & Lab<br />

Sup<br />

(L)<br />

SQE<br />

(M/H)<br />

* Required Flag:<br />

Only required if flag is set by Product<br />

Team SQ in CQMS (based on parts<br />

chosen by Manufacturing <strong>for</strong> Part I/S)<br />

Effective 4 th Quarter 2010


Metric Summary<br />

Metric IBSC <strong>EBSC</strong> KPI<br />

PIS<br />

Part Inspection Standard)<br />

Key Per<strong>for</strong>mance<br />

Indicator<br />

Goals<br />

AQP X X X<br />

IRE X X<br />

PDR X X X<br />

80% by S2<br />

PPAP X X X<br />

100% by V1 + 180<br />

IMDS X X<br />

PFMEA X X<br />

X X<br />

High Risk Parts Only<br />

Gage R&R X X High Risk Parts Only<br />

Dim. Cap. X X High Risk Parts Only<br />

X<br />

80% by S2<br />

X<br />

100% by V1 + 180


AQP Supplier BSC - Web Reports<br />

Suppliers need to request access to the “AQP<br />

Supplier Reports” link from their Security<br />

Administrator. The link is located under the<br />

Applications tab in the <strong>Chrysler</strong> portal. It will<br />

help you understand your AQP score.<br />

15


AQP Supplier Web Reports<br />

5 Reports<br />

Including Supplier Parts To Do List<br />

16


AQP Supplier Reports<br />

17


AQP Supplier Reports<br />

18


AQP Supplier Parts To Do List<br />

19


Confirming NCT Ticket Scores<br />

NCT Ticket Score<br />

Calculation<br />

20


Non Con<strong>for</strong>mance Tracking Measure<br />

• Noncon<strong>for</strong>mance Tracking System is<br />

source system<br />

• NC Tickets<br />

– Measures frequency of noncon<strong>for</strong>mance<br />

material<br />

– Only closed tickets are counted<br />

21


Non-Con<strong>for</strong>ming Material (Tickets)<br />

• All non-con<strong>for</strong>ming tickets <strong>for</strong> the rolling 6 months are<br />

adjusted in the YTD column on a monthly basis<br />

• Adjustments:<br />

– Resolved disputed tickets (possible NC quantity or defect code)<br />

– Voided or cancelled tickets<br />

• Defect Codes that do not count against suppliers<br />

– NPNP – Notice of Shipment of Potential Non-Con<strong>for</strong>ming Parts<br />

– NPCO – No Parts Cost Only<br />

– DCC – Directed Consigned Component<br />

– DCNC – Directed Component Non-Con<strong>for</strong>mance<br />

22


NCT Ticket FFR Calculation<br />

C= Current = 8<br />

T = Target = 4<br />

Formula: (1- 6*(C-T)/(T+100) ) *100<br />

[1-6 * (8-4)/( 4+100)] *100<br />

[1-6 * 4/104] *100<br />

[1-6*.384615]*100<br />

[1-.230769] *100<br />

=.769231*100<br />

= 76.9<br />

= 77 % FFR<br />

23


Best in Class Definition<br />

NC-Ticket uses a Best-In-Class (BIC)<br />

methodology to determine the target <strong>for</strong><br />

each 4 digit commodity code.<br />

Suppliers that ship the same local<br />

commodity code are grouped together and<br />

the best per<strong>for</strong>mance is used to determine<br />

the 2010 target <strong>for</strong> all suppliers that ship<br />

that commodity.<br />

24


Choosing BIC <strong>for</strong> Tickets<br />

Suppliers in<br />

Local code<br />

00AA Receipts<br />

Those under the<br />

20% floor are<br />

eliminated from<br />

participating<br />

from BIC<br />

Suppliers able<br />

to<br />

participate<br />

in BIC<br />

Supplier A 500 500 500<br />

Supplier B 660 660 660<br />

Supplier C 25 25<br />

Supplier D 10 10<br />

Supplier E 15 15<br />

Supplier F 85 85 85<br />

Supplier G 32 32<br />

Average 189.57<br />

20%<br />

37.91<br />

BIC Floor = (average of receipts <strong>for</strong> local commodity code)*0.20<br />

25


Best in Class Target Definition<br />

Target setting method <strong>for</strong> Non-Con<strong>for</strong>ming Material - NC Tickets<br />

NC Tickets Target = 4 x .90 = 3.6<br />

Tickets<br />

12345 Supplier A 6<br />

15542 Supplier B 12<br />

16899 Supplier F 4<br />

12357 Supplier C<br />

12286 Supplier D<br />

65864 Supplier E<br />

58692 Supplier G<br />

Includes a 10%<br />

improvement<br />

over BIC<br />

26


NCT Rolling 6 Months<br />

27


NCT Rolling 6 Months<br />

28


NCT 6 Month Summary<br />

29


NCT Rolling 6 Month Detail<br />

30


Rolling 6 Month Detail by Part<br />

31


Ticket Details by Part<br />

32


NCT Worksheet Inquiry<br />

33


Your IBSC<br />

Current <strong>Quality</strong><br />

• Yardholds<br />

• CSA Metric (Customer Satisfaction Audit<br />

Advance <strong>Quality</strong><br />

• AQP Metric<br />

Regional Sales Offices (RSO)<br />

• NCT Metric<br />

34


Questions and Answers<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!