- Page 5: 5 Reconfiguration drivers and chall
- Page 9 and 10: 0.4 UHF2 Technology and Market The
- Page 11 and 12: 240689 - 450-470 Study Final Print
- Page 13 and 14: 240689 - 450-470 Study Final Print
- Page 15 and 16: 1.2 Background The UHF2 band in the
- Page 17 and 18: 2 Spectrum Management of the UHF2 B
- Page 19 and 20: Source: Mott MacDonald 240689 - 450
- Page 21 and 22: Table 1 provides information on the
- Page 23 and 24: spectrum will continue to make awar
- Page 25 and 26: The water industry use 24 national
- Page 27 and 28: and for this type of service. Some
- Page 29 and 30: Figure 5 Wide Area PBR 240689 - 450
- Page 31 and 32: 3 Regulatory Environment 3.1 Introd
- Page 33 and 34: arrangement with a 10 MHz duplex sp
- Page 35 and 36: decision, but Ireland and the Nethe
- Page 37 and 38: 3.6 Summary & Conclusions This chap
- Page 39 and 40: from Airwave (380-400MHz). Potentia
- Page 41 and 42: 4.2.1 DMR 240689 - 450-470 Study Fi
- Page 43 and 44: Assuming that an E&PSS network oper
- Page 45 and 46: 4.3.2 UK Market The UK market for t
- Page 47 and 48: 5 Reconfiguration drivers and chall
- Page 49 and 50: 240689 - 450-470 Study Final Print
- Page 51 and 52: 240689 - 450-470 Study Final Print
- Page 53 and 54: 6 Interference environment 6.1 Intr
- Page 55 and 56: This scenario would be valid if the
- Page 57 and 58:
6.4.1 Interference to narrowband sy
- Page 59 and 60:
240689 - 450-470 Study Final Print
- Page 61 and 62:
Figure 16 Base station receiver noi
- Page 63 and 64:
6.7 Summary & Conclusions This chap
- Page 65 and 66:
The costs in a cost-benefit analysi
- Page 67 and 68:
7.2.2 Practical issues in assessing
- Page 69 and 70:
240689 - 450-470 Study Final Print
- Page 71 and 72:
Study Methodology Cost estimates PA
- Page 73 and 74:
potential complications/interferenc
- Page 75 and 76:
240689 - 450-470 Study Final Print
- Page 77 and 78:
240689 - 450-470 Study Final Print
- Page 79 and 80:
Table 13 Conclusions on the impact
- Page 81 and 82:
It is understood that the Public Sa
- Page 83 and 84:
7.7 Summary & Conclusions In this c
- Page 85 and 86:
240689 - 450-470 Study Final Print
- Page 87 and 88:
8.3.1 The Direct costs of Band Alig
- Page 89 and 90:
European markets to provide mobile
- Page 91 and 92:
the UK has skewed the market valuat
- Page 93 and 94:
We assume that the 4.5MHz paired sp
- Page 95 and 96:
£2k per annum per assignment. Thes
- Page 97 and 98:
alignment options. However, there a
- Page 99 and 100:
We assume that there is no spectrum
- Page 101 and 102:
240689 - 450-470 Study Final Print
- Page 103 and 104:
Table 24 Sensitivity analysis of ke
- Page 105 and 106:
9 Conclusions and Recommendations 9
- Page 107 and 108:
egulatory uncertainty, which has le
- Page 109 and 110:
240689 - 450-470 Study Final Print
- Page 111 and 112:
240689 - 450-470 Study Final Print
- Page 113 and 114:
Appendix B: Interference B.1 Types
- Page 115 and 116:
In Europe harmonised radio equipmen
- Page 117 and 118:
Appendix C: UHF2 Interference Regul
- Page 119 and 120:
C.2.1 Interface Requirement (IR) In
- Page 121 and 122:
the likelihood of increased interfe
- Page 123 and 124:
SURs could also benefit other busin
- Page 125 and 126:
with the UK and hence may not meet
- Page 127 and 128:
D.5 Modelling areas of UK base stat
- Page 129 and 130:
The “Standard deviation of noise
- Page 131 and 132:
ules. The number of blocking transm
- Page 133 and 134:
Appendix G: Spectrum Trading and Li
- Page 135 and 136:
240689 - 450-470 Study Final Print
- Page 137 and 138:
DVB-H Digital Video Broadcasting -
- Page 139 and 140:
UHF II UHF frequency band from 450