SPECIAL CONDITIONS FOR SUPPLY OF MATERIALS<br />

1. Tenderes shall have to furnish samples of materials such as metal, stone chips and moorum<br />

etc. in sealed packets weighting not less than one Kg. with name of parties from which<br />

supplies will have to be made for approval & the supply for materials strictly confirming to<br />

the approval samples, will only be taken.<br />

2. Supply of Bricks shall be taken at site work and will be stacked in countable stacks as per<br />

direction of E/I which shall be approved by the competent authority.<br />

3. Supply of materials will always be taken in standard stack mentioned in the agreement or as<br />

directed by the E/I.<br />

4. The quantity of supply may increase or decrease as per requirement and direction of E/I.<br />

5. If the stacks of materials supplied do not confirm to the quality as per approved samples and<br />

size as per I.R.C. and circle specification they will be out rightly rejected and the contractor<br />

at his own cost will have remove these materials from the site failing which the materials<br />

would be thrown away by Departmental labour and the cost incurred shall be recovered from<br />

him.<br />

6. No credit will be issued by the <strong>department</strong> in any case.<br />

7. Supply shall be proportionate to the time of completion mentioned in the agreement.<br />

8. The supply should be uniform in the entire length or as directed by the E/I.<br />

9. Collection of materials will not allowed on the flanks unless written permission of E/I. in<br />

special circumstances.<br />

10. No stacks to materials should be consumed in the work they are measured on measurement<br />

book and duly checking officers.<br />

11. The contractor shall have to offer all the facilities to the <strong>department</strong>al officers at the time of<br />

supervision, measurement and checking to the hills and shall have to restack if desired by<br />

them.<br />

ADDITIONAL SPECIAL CONDITIONS<br />

1. Contractor will be held responsible for supply of defective materials and their use in work. In<br />

the case of contractors (doing work more than Rs. Ten Lakh) who have to employ their<br />

Junior Engineer/Assistant Engineer. If they will be doing defective work the concerned<br />

Junior Engineer/Assistant Engineer will be held responsible.<br />

2. Contractors having their own Hotmix Plant, Road Roller, Tar Boiler, Paver Tipper, Sprayer<br />

etc. will be given priority.<br />

3. laosnd dks iSDM fcVqesu 60@70 xzsM dh [kjhnkjh Hkkjr ljdkj ds fdlh miØe ls Lo;a djuh<br />

gksxh rFkk fcVqesu dh xq.koÙkk dk izek.k i= ,oa [kjhn dk izek.k i=@jlhn nsuk vfuok;Z gksxkA<br />

[kkyh fcVqesu Mªe ize.Myk/khu xksnke eas tek djus ds ckn gh muds }kjk dk;Z eas yxk, x,<br />

fcVqesu dk Hkqxrku fd;k tk;sxkA [kkyh fcVqesu Mªe laosnd dks ykSVkuk vko';d gSA [kkyh fcVqesu<br />

Mªe ugha ykSVkus ij :ñ 160-00 :ñ ek=½ dh nj ls foi= eas dVkSrh gksxkA<br />

4- laosnd dks fof'kf"V ds vuq:i Ordinary Port Land cement IS Gr.- 53 dk gh mi;ksx fd;k<br />

tk,xk ,oa [kkyh flesUV cksjk ize.Myh; xksnke esa ykSVkuk vko';d gksxkA [kkyh flesUV cksjk ugha<br />

ykSVkus ij 3-00 ¼rhu½ :ñ izfr [kkyh cksjk dh nj ls foi= esa dVkSrh gksxhA<br />

Executive Engineer,<br />

R.C.D., Road Division,<br />

Chatra