29.07.2013 Views

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

particular specifications (road works) - CIDCO Maharashtra Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 407<br />

(h) The prepared surface shall meet the visible standards of<br />

comparisons as in SSPC-VIS 1 or SSPC-VIS2.<br />

13.4 Application of coating:<br />

13.4.1 The coating shall be applied to the cleaned surface as soon as after<br />

cleaning, and before oxidation of the surface discernible to the inaided<br />

eye occurs. However, the application of the coating shall not be<br />

delayed more than 4 hrs after cleaning.<br />

13.4.2 A rapid setting primer shall be applied over the prepared surface of the<br />

reinforcing steel either by brushing or dipping.<br />

13.4.3 After 30 minutes of application of the primer a cement polymer sealing<br />

coat shall applied either by brushing or dipping.<br />

13.4.4 The coated rods shall be handed after 6 hrs.<br />

14.0 SPECIFICATION FOR PROVIDING ANTI CORROSIVE TREATMENT TO<br />

M.S. OR TMT REINFORCEMENT BARS WITH CEMENT POLYMER<br />

COMPOSITE COATING SYSTEM (CPCC)<br />

14.1 REQUIREMENS OF THE COATED BARS<br />

The coated reinforcement rods of cement polymer composite coating<br />

system shall meet the following requirements:-<br />

(a) Thickness of the coating :<br />

a) After curing the minimum dry film thickness of the coated rods<br />

shall not be less than 150 + 25 microns.<br />

b) Measurements shall be made using commercially available<br />

coating thickness meter which should be specifically suitable for<br />

curved surfaces.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!