<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 411<br />

6) The coated bars bending test can be observed frequently at<br />

site.<br />

14.3 GUIDELINES FOR HANDLING, STACKING AND TRANSPORTING OF<br />

14.4 STACKING:<br />

COATED REINFORCING BARS<br />

The durability of the coated rebars is related to the coating quality. The<br />

more damage to the coating is more prone to corrosion. Good, job<br />

site practices can minimize the coating damage. For this reason,<br />

standards from ASTM, JSC, NACE(USA) have laid down specific<br />

procedures for stacking and transporting coated bars. Some important<br />

guidelines are referred here.<br />

i) It is preferable to store the coated bars on buffer material placed<br />

at suitable intervals instead of placing them directly on the<br />

ground.<br />

ii) It is not desirable to store coated bars by piling them on top of<br />

one another they are to be stored by piling buffer materials such<br />

as wood, rubber, jute sacks etc., should be used to separate the<br />

layers. However, the number of layers allowed shall be limited<br />

to a maximum of five.<br />

iii) The coated rods shall be stored in yard.<br />

iv) If any damage had occur during stacking it should be repaired<br />

immediately by the same coating formulation before any rusting<br />

occur.