<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 460<br />

14.0 SHORING<br />

deem necessary at the expense and risk of the contractors. If,<br />

however, the Engineer considers impracticable for the contractors to<br />

maintain any such water pipes, gas pipes, drains, sewers or other<br />

<strong>works</strong>, and that exigencies of the work necessitate the breaking<br />

down, removal or diversion of any such water pipes, gas pipes,<br />

drains, sewers or other work, then, though the cost of breaking<br />

down or removing any such trench or sewers and of providing such<br />

chutes, pumps or other appliance, as the Engineer may direct for the<br />

raising and temporary passage of the water or sewerage which may<br />

escape from any such water pipes, gas pipes, drains, sewers or other<br />

work shall be borne by the contractors, yet the cost of breaking<br />

down and removing any such water pipes or gas pipes, and of<br />

rebuilding, replacing diverting or reinstating any such water pipes,<br />

gas pipes, drains, sewers or other <strong>works</strong>, as may be required by the<br />

Engineer shall be paid to the contractors as provided by the contract,<br />

if done by them, or the same or any part thereof may be carried out<br />

under the Engineer's orders by other agency and in such cases<br />

without charge to the contractors. The Engineer's opinion as to the<br />

amount of the charges, which under this clause are payable to the<br />

contractors, shall be final and binding on the contractor. It should<br />

be allowed for arbitration being non-technical matter.<br />

a) Wherever shoring may deemed necessary by the Engineer the<br />

contractor shall provide the same in the best possible manner with<br />

the best material and to the satisfaction of the Engineer. The<br />

contractor shall employ such kind or kinds of shoring as the<br />

Engineer may consider the exigencies of the work to require and it is<br />

to be distinctly understood that the work 'shoring' is to comprise all