<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 468<br />

distance therefrom to be well clear of all intended excavation, so<br />

arranged that a sight-rail when fixed level against the post will cross<br />

the centre of the manhole. The posts must also be so set up that the<br />

longitudinal direction of the rail may be as clear as possible of the<br />

direction of any of the lines of pipes or drains converging to the<br />

manhole. If walls of buildings afford suitable means of fixing the<br />

sight-rail, the post may, however the dispensed with. The sight rails<br />

must not in any case be more than 30 M. apart intermediate rails<br />

therefore be put up if necessary.<br />

23.2 Construction of boning staves<br />

23.3 Site rails<br />

Boning staves shall be prepared by the contractors about 75 mm by<br />

50 mm of various lengths, each length being of a certain number of<br />

Metre and with a fixed tee-head ad a fixed intermediate cross piece,<br />

each about 300 mm long. The top edge of the cross piece must be<br />

fixed at distance below the top edge of this tee-head, equal to as the<br />

case may be, the out side diametre of the pipe or thickness of the<br />

concrete bed to be laid. The boning staff, must be marked on both<br />

sides to indicate its full length. According to the circumstances of<br />

each case, a suitable length of boning staff will be determined upon,<br />

and the reduced level of the bed of the pipe or bottom of concrete of<br />

drain at each sight-rail added to the selected length of boning staff,<br />

will be marked by a horizontal line on both posts, or on walls or<br />

fences to which the sight-rail is to be fixed.<br />

a) The sight-rails (about 25 cm wide and 40 mm thick) is to be screwed<br />

with the top edge against the level marks. The centre line of the<br />

pipe sewer or the drain will be marked on the rail and this mark will