<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 478<br />

appliances and pass them through the pipes and shall if required,<br />

throw in water and show that it passed freely through every portion<br />

of the work. Brick, mortar and rubbish shall not be allowed to fall in<br />

into the manholes or sewer lines while fixing or if allowed shall be<br />

removed by the contractor at their own expense.<br />

b) The contractors to clean and use existing pipes met with<br />

The contractors are if and when required, to take up any existing<br />

pipes that be met with a clean and prepare them for reuse for such<br />

work they will be paid at the contact rates for excavation and filling,<br />

such excavation will be measured 0.90 M wide for 225 mm to 450<br />

mm pipes, 0.60 M wider for smaller pipes and only in case to the<br />

depth of pipes bed. The filling consolidation etc., shall be done as<br />

described for new rocks and under the same conditions in every<br />

respect.<br />

35.0 MEASUREMENT OF PIPES<br />

a) All pipes be measured according to the <strong>works</strong> actually done by<br />

them, and no allowances will be made for any waste in cutting to the<br />

exact length required. An exception to this will be made only in the<br />

case of short branches of 100 mm dia stoneware pipes, which be<br />

treated in the manner hereafter described with regard to fittings.<br />

The contractor shall be under obligation to use the pieces or part of<br />

the pieces out of from 100 mm stoneware pipes, if it be deemed by<br />

the Engineer practicable to do so and no further payment shall be<br />

made for the same to the contractor. A socket attached to a straight<br />

pipe will not be measured, but a spigot end of a straight pipe<br />

whether such end be free for entering into a socket will be measured<br />

to its full length. Pieces of cut pipe not used in the work will become