<strong>CIDCO</strong> OF MAHARASHTRA LTD<br />

C.A.No.01/<strong>CIDCO</strong>/SE(KHR)/EE(KHR-I)/2010–11 Pg. No. 564<br />

1.15.9 Tolerances :<br />

In accordance with IS: 456 2000 and MORT & H section 1500.<br />

1.15.10 Age of Concrete at Removal of Formwork :<br />

In accordance with ISL 456 2000 and MORT & H section 1500.<br />

The Engineer may vary the periods specified in IS: 456-2000 if he<br />

considers it necessary. Immediately after the forms are removed,<br />

they shall be cleaned with a jet of water and a soft brush.<br />

1.15.11 Stripping of Formwork :<br />

Formwork shall be removed carefully without jarring the concrete,<br />

and curing of the concrete shall be commenced immediately.<br />

Concrete surfaces to be exposed shall, where required by the<br />

Engineer, be rubbed down with carborundum stone to obtain a<br />

smooth and even finish. Where the concrete requires plastering or<br />

other finish later the concrete surface shall be immediately hacked<br />

lightly all over as directed by the Engineer. No extra charge will be<br />

allowed to the Contractor for such work on concrete surfaces after<br />

removal of forms.<br />

1.15.12 Repropping :<br />

For Multistoreyed buildings the floors may need repropping to<br />

support the loads of the upper floors under construction. The extend<br />

of such repropping shall be as directed by the Engineer (this does