- Page 4 and 5: IMPORTANT NOTICE This Master Plan h
- Page 6 and 7: table of contents Summary 1 1 Intro
- Page 9: Summary Building on Master Plan 03/
- Page 12 and 13: Key features of the Master Plan 200
- Page 14 and 15: TWY ‘T6’ ‘T5’ TWY ‘T4’
- Page 17: 1.0 Introduction 1.1 Airport settin
- Page 20 and 21: Table 1.1 key stages in the develop
- Page 22 and 23: 1.4 vision As the ALC and operator
- Page 24 and 25: 1.9 Terms used in this Master Plan
- Page 29 and 30: 2.0 Stakeholder and Community Consu
- Page 31 and 32: - Access to and from Sydney Airport
- Page 33 and 34: 2.3.5 Community Open days To facili
- Page 35: This page has intentionally been le
- Page 39 and 40: 3.0 Statutory and policy framework
- Page 41 and 42: There are also several small, priva
- Page 43: This page has intentionally been le
- Page 47 and 48: 4.0 Economic and Regional Significa
- Page 49 and 50: Figure 4.1 Metropolitan Strategy co
- Page 51 and 52: One of the identified actions in th
- Page 53: This page has intentionally been le
- Page 57 and 58: 5.0 Aviation Activity Forecasts For
- Page 59 and 60: Comparisons were made with projecti
- Page 61 and 62: Figure 5.5 Air freight forecasts, 2
- Page 63: 5.8 Comparison with Master Plan 03/
- Page 67 and 68: 6.0 Airfield - Master Plan Concept
- Page 69 and 70: Runway Monitor will be replaced by
- Page 71: include aircraft maintenance hangar
- Page 75 and 76: 7.0 Terminal and Passenger Systems
- Page 77 and 78:
Customs and quarantine processing f
- Page 79:
This page has intentionally been le
- Page 83 and 84:
8.0 Freight - Master Plan Concept S
- Page 85:
This page has intentionally been le
- Page 89 and 90:
9.0 Aviation Support Facilities and
- Page 91 and 92:
• South-east sector - three wide-
- Page 93:
• Enforcement of revised Water Ef
- Page 97 and 98:
10.0 landside Access - Master Plan
- Page 99 and 100:
As indicated in Chapter 4, it is es
- Page 101 and 102:
Incremental expansion may be requir
- Page 103:
This page has intentionally been le
- Page 107 and 108:
11.0 Commercial development - Maste
- Page 109:
This page has intentionally been le
- Page 113 and 114:
12.0 land use Zoning Plan Sydney Ai
- Page 115 and 116:
The following zones and their nomin
- Page 117 and 118:
12.5.7 SP 3 - Airport logistics Thi
- Page 119 and 120:
The area designated (approximately
- Page 121 and 122:
Table 12.8 b2 Enviro-business Park
- Page 123 and 124:
applications (MDP included) unless
- Page 125:
MARRICKVILLE Local Environmental Pl
- Page 129 and 130:
13.0 Safety Management and Airspace
- Page 131 and 132:
of ground lights within a six kilom
- Page 133 and 134:
Sydney Airport Master Plan 2009 Fig
- Page 135 and 136:
Sydney Airport Master Plan 2009 Fig
- Page 137:
Sydney Airport Master Plan 2009 Fig
- Page 141 and 142:
14.0 Sustainability, Climate Change
- Page 143 and 144:
14.0 Sustainability, Climate Change
- Page 145 and 146:
Airport will occur to the north or
- Page 147 and 148:
the Chapter 4 noise standard, appli
- Page 149 and 150:
• the selection of runway operati
- Page 151 and 152:
On average, Sydney Airport receives
- Page 153 and 154:
The second step will be to pursue a
- Page 155 and 156:
Fire training exercises at Sydney A
- Page 157 and 158:
maritime navigation hazard for recr
- Page 159 and 160:
14.0 Sustainability, Climate Change
- Page 161 and 162:
Note: Track A* is Track B and C com
- Page 163 and 164:
Sydney Airport Master Plan 2009 Fig
- Page 165 and 166:
Sydney Airport Master Plan 2009 Fig
- Page 167 and 168:
Sydney Airport Master Plan 2009 Fig
- Page 169:
This page has intentionally been le
- Page 173 and 174:
15.0 Implementation The development
- Page 175 and 176:
Appendix A Glossary and Aviation Te
- Page 177 and 178:
AIRCRAFT NOISE TERMS Australian Noi
- Page 179 and 180:
Appendix b Runway Modes of Operatio
- Page 181 and 182:
Table B2 Preferred Runway Selection
- Page 183 and 184:
Source: Airservices Australia 2003
- Page 185 and 186:
Consistency with State Environmenta
- Page 187 and 188:
Appendix C - Consistency with State
- Page 189 and 190:
Appendix C - Consistency with State
- Page 191 and 192:
Zone No. 5 Special uses (A) Appendi
- Page 193 and 194:
Appendix C - Consistency with State
- Page 195 and 196:
Appendix C - Consistency with State
- Page 197 and 198:
Public Transport Access Appendix C
- Page 199 and 200:
Appendix C - Consistency with State
- Page 201 and 202:
Appendix D - Definitions Sydney Air
- Page 203 and 204:
(iii) Engineering works, or (iv) El
- Page 205 and 206:
Appendix D - Definitions Sydney Air
- Page 207 and 208:
*Structures mean: (a) bridges, (b)
- Page 209 and 210:
development Assessment at Sydney Ai
- Page 211 and 212:
E2 development Standards Appendix E
- Page 213 and 214:
Appendix F Abbreviations 203
- Page 215 and 216:
PAPIS Precision Approach Path Indic
- Page 217 and 218:
Consultation materials and related
- Page 219 and 220:
Table G2 Technical stakeholders con
- Page 221 and 222:
G3 PdMP consultation documents •
- Page 223 and 224:
PdMP summary booklet continued Appe
- Page 225 and 226:
Frequently asked questions continue
- Page 227 and 228:
Fact sheets continued Appendix G -
- Page 229 and 230:
Appendix G - Consultation materials
- Page 231 and 232:
Open day public notices bexley East
- Page 233 and 234:
Open day public notices continued C
- Page 235 and 236:
Appendix H bibliography
- Page 237:
Siting and Construction. Sydney, Au