Anuex.-A<br />
GENERATION FROM NHPC POWER STATIONS<br />
MINISTRY OF POWER<br />
(FIGURES IN MUs)<br />
NAME OF POWER GENERATION UP LIKELY TO BE GENERATED IN TOTAL EXPECTED<br />
STATION TO BALANCE PERIOD i.e GENERATION<br />
DECEMBER ’05 JAN’06 TO MARCH’06 DURING 2005-06<br />
BAIRASIUL 667.78 110.17 777.95<br />
LOKTAK 449.88 115.84 565.72<br />
SALAL 3050.97 301.19 3352.16<br />
TANAKPUR 443.13 43.27 486.50<br />
CHAMERA-I 2118.06 171.44 2289.50<br />
URI 2038.96 507.47 2548.43<br />
RANGIT 311.89 38.89 350.78<br />
CHAMERA-II 1351.42 207.08 1558.50<br />
DHAULIGANGA 223.86 87.72 311.58<br />
TOTAL 10655.96 1582.16 12239.12<br />
Note: GENERATION TARGET FOR THE MONTH OF JAN’06 TO MARCH’06 AS PER VERY GOOD RATING OF MOU 2005-<br />
06 OF THE INDIVIDUAL POWER STATIONS. TARGET FOR GENERATION FROM DULHASTI PROJECT HAS NOT BEEN<br />
INCLUDED.<br />
60 MW Rangit <strong>Power</strong> Station, (Sikkim) - <strong>Power</strong> House<br />