MINISTRY OF POWER<br />

Chapter - 23.6<br />

NORTH EASTERN ELECTRIC POWER CORPORATION LTD.<br />

North Eastern Electric Corporation Ltd. (NEEPCO) was<br />

constituted in 1976 under the Indian Companies Act, 1956<br />

with the objective <strong>of</strong> developing the power potential <strong>of</strong><br />

the North Eastern Region <strong>of</strong> the country through planned<br />

development <strong>of</strong> power generation projects, which in turn<br />

would effectively promote the development <strong>of</strong> the North<br />

Eastern Region. Since then NEEPCO has grown into<br />

one <strong>of</strong> the pioneer Public Sector Undertaking under the<br />

<strong>Ministry</strong> <strong>of</strong> <strong>Power</strong>, Govt. <strong>of</strong> India, with an authorized share<br />

capital <strong>of</strong> Rs. 3,500 Crores and having an installed capacity<br />

<strong>of</strong> 1,130 MW (755 MW hydro & 375 MW thermal), which<br />

meets more than 66% <strong>of</strong> the energy requirements <strong>of</strong> the<br />

Khandong Dam<br />

N.E. Region. The main objectives <strong>of</strong> Corporation are to<br />

add to the power generating capacity in the North Eastern<br />

Region by ensuring optimum utilization <strong>of</strong> commissioned<br />

generation projects, to generate adequate internal<br />

resources ensuring justifiable return on investment, to<br />

continue sustained efforts to obtain the receivables from<br />

State Electricity Boards/Departments, to execute and<br />

commission power projects, both hydro and thermal,<br />

within prescribed time frames, and to undertake long term<br />

feasibility studies and preparation <strong>of</strong> detail project reports<br />

for optimum development <strong>of</strong> hydro power resources <strong>of</strong> the<br />

North Eastern Region.<br />

CAPACITY ADDITION PROGRAMME FOR THE 10TH PLAN:<br />

The proposed capacity addition during the 10th Plan has been fixed as 155 MW (130 MW approx. Thermal and 25 MW<br />

Hydro). Out <strong>of</strong> this, Kopili H.E. <strong>Power</strong> Station Stage-II with one unit <strong>of</strong> 25 MW has already been completed.<br />

1. POWER STATIONS UNDER OPERATION:<br />

The following completed Projects are under Operation:<br />

Sl. No. Name <strong>of</strong> the Project State Installed Capacity<br />

A. HYDRO<br />

1. Kopili H.E. <strong>Power</strong> Plant Assam 275 MW<br />

2. Doyang H.E. <strong>Power</strong> Plant Nagaland 75 MW<br />

3. Ranganadi H.E. <strong>Power</strong> Plant Arunachal Pradesh 405 MW<br />

Sub Total (A) 755 MW<br />

B. THERMAL<br />

4. Assam Gas Based <strong>Power</strong> Plant Assam 291 MW<br />

5. Agartala Gas Turbine <strong>Power</strong> Plant Tripura 84 MW<br />

Sub Total (B) 375 MW<br />

T O T A L 1,130 MW<br />

Kameng HEP (600MW)