84<br />
MINISTRY OF POWER<br />
* NTPC has applied for allocation <strong>of</strong> 16 nos. <strong>of</strong> coal<br />
blocks, out <strong>of</strong> which one Block, namely Pakri-<br />
Barwadih, was allotted to NTPC in October 2004,<br />
under Govt. dispensation mode. Four blocks<br />
namely Kerandari, Chatti Baridatu, Chhatrasal<br />
and Dulanga were made in Jan. 2006 under<br />
captive Mining route. Another block namely<br />
Talaepali as a prt <strong>of</strong> lara integrated coal-mine<br />
cum power project.<br />
* NTPC is rigorously pursuing with MOC for<br />
allotment <strong>of</strong> these coal blocks.<br />
* Recently, Government <strong>of</strong> India has taken an ‘inprinciple’<br />
decision to allocate the following coal<br />
blocks to NTPC / its Joint Venture with Coal India<br />
Limited :<br />
(1) Kerandari, North Karanpura - 228 MT;<br />
(2) Chatti Bariatu, North Karanpura - 243 MT;<br />
(3) Chattrasal, Singrauli -150 MT;<br />
(4) Dulanga, lb Valley - 260 MT;<br />
(5) Talaipalli - 965 MT;<br />
(6) Brahmini-1900MT.<br />
(7) Chichro Patsimal - - 356 MT.<br />
Joint Venture with GIL / its subsidiaries :<br />
* NTPC is pursuing with CIL for developing <strong>of</strong> coal<br />
mine blocks under JV route at Gajmara (Orissa),<br />
Simhadri Expansion, and/or Darlipali (Orissa).<br />
Selection <strong>of</strong> Joint Venture Partner for coal mining:<br />
* NTPC has appointed a Consultant for upfront<br />
selection <strong>of</strong> JV Partner(s) for developing <strong>of</strong> coal<br />
mining blocks to be allotted under captive mining<br />
route. Finalization <strong>of</strong> QR, Bid documents, etc. are<br />
in progress.<br />
Pakri-Barwadih - Brief Status <strong>of</strong> activities :<br />
* Request for Notification under Section 4(1) for<br />
land acquisition under Coal Bearing Act (CBA)<br />
has been forwarded to Govt. Press for publication,<br />
by <strong>Ministry</strong> <strong>of</strong> Coal (MOC).<br />
* Application for Site clearance submitted on<br />
23.11.05 to MOEF.<br />
* Pre monsoon data for Environmental Impact<br />
Assessment (EIA)/ Environment Management<br />
Plan (EMP) studies completed & post monsoon<br />
studies including hydro geological studies under<br />
progress.<br />
* Geological modeling completed. Conceptual<br />
surface master plan prepared and Final Mine<br />
Plan expected in January 2005.<br />
* Feasibility Report (Preliminary) for establishing<br />
<strong>of</strong> Rail Link from Pakri Barwadih has been<br />
prepared.<br />
* Block Boundary received from Coal Mine<br />
Planning and Design Institute (CMPDI). Matter<br />
has been taken up with ONGC for resolving <strong>of</strong><br />
the overlapping with Coal Bed Methane (CBM)<br />
Boundary issue.<br />
* Expression <strong>of</strong> Interest (EOI) for selection <strong>of</strong> Mine<br />
Developer-cum-Operator (MDO) was published<br />
on 14.10.2005.<br />
8.5 Joint Ventures<br />
A. Existing Joint Ventures<br />
UTILITY POWERTECH LTD. (UPL) (a Joint Venture<br />
Company <strong>of</strong> NTPC & Reliance Energy) which was<br />
formed to take up assignments <strong>of</strong> construction,<br />
erection and supervision in the power sector and<br />
other sectors in India and abroad is progressing<br />
satisfactorily-. The total income and pr<strong>of</strong>it for the year<br />
2004-05 have been Rs1,124 Million and Rs 57 Million<br />
(aftertax) respectively. Company has declared 150%<br />
(Rs.30 Million) dividend for the last financial year<br />
(2004-05).<br />
NTPC ALSTOM POWER SERVICES PVT. LIMITED<br />
(NASL): NTPC has formed a JV Company with<br />
ALSTOM POWER GENERATION AG, (formally ABB<br />
KRAFTWERKE AG), under the name <strong>of</strong> “NTPC<br />
ALSTOM POWER SERVICES PVT. LIMITED”, (NASL)<br />
for taking up Renovation & Modernization assignments<br />
<strong>of</strong> <strong>Power</strong> Plants both in India and abroad. Total income<br />
and pr<strong>of</strong>it (after tax) for the year 2004-05 is Rs.1,021<br />
million & Rs 21 million respectively. A dividend <strong>of</strong> 10%<br />
( Rs 6 Million) has been declared by NASL for the year<br />
2004-2005.<br />
PTC INDIA LTD. (PTC), a Joint Venture Company with<br />
NTPC holding 8% equity, is purchasing power from<br />
NTPC Korba ash brick manufacturing unit