Efficient Industry Heating and Heat Recovery Technology
Efficient Industry Heating and Heat Recovery Technology
Efficient Industry Heating and Heat Recovery Technology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INTEC<br />
energy systems<br />
INTEC Company Profile<br />
Engineering GmbH
Energy Efficiency made in Germany<br />
Thai-German Forum, 15. – 19. October 2012<br />
on Energy Efficiency in Thai Industries<br />
Date: Tuesday 16th October, 2012<br />
Venue: Chatrium Ballroom, Chatrium Hotel Riverside Bangkok<br />
Speaker: Mr. Christian Daniel, INTEC Engineering GmbH<br />
Contact: INTEC Engineering GmbH<br />
Mr. Christian Daniel (Sales Director of the INTEC Group)<br />
christian.daniel@intec-energy.de<br />
Mobile: +49 (0) 151 14 80 97 33<br />
INTEC Energy Systems Sdn Bhd<br />
Mr. Yap F.W. (General Manager Malaysia)<br />
yap.fw@intec-energy.de<br />
Mobile: +6 012 28 68 530<br />
2
Overview<br />
Energy Efficiency made in Germany<br />
1. INTEC company presentation<br />
page 4 – 7<br />
2. Our Products<br />
page 8 – 16<br />
3. <strong>Efficient</strong> heat transfer for production processes<br />
<strong>and</strong> energy saving design<br />
page 17 – 24<br />
4. Company addresses<br />
page 25<br />
3
INTEC Engineering GmbH<br />
Germany<br />
INTEC supplies industrial process heating equipment using heat<br />
transfer media like:<br />
thermal oil<br />
steam<br />
hot water<br />
hot gases for dryers<br />
<strong>and</strong> offers a wide range of products,<br />
engineering, manufacturing,<br />
delivery up to turn key installations,<br />
site support services <strong>and</strong><br />
after sales service.<br />
4
INTEC Engineering GmbH<br />
Germany<br />
Established in 1995, privately owned,<br />
INTEC is developing successfully<br />
<strong>and</strong> exp<strong>and</strong>ing the network of<br />
representations as well as own<br />
offices around the world.<br />
This gives our customer a good<br />
service <strong>and</strong> short reaction times.<br />
A turnover of 30 million Euro<br />
within the involved companies<br />
of the INTEC group, generated by<br />
approx. 60 employees<br />
5
INTEC Rohrtechnik GmbH<br />
Quality „Made in Germany“<br />
INTEC manufacturing takes<br />
place at our own premises<br />
in Bruchsal, Germany<br />
Production of step grates,<br />
heater coils <strong>and</strong> tube bundles,<br />
complete heaters <strong>and</strong> boilers<br />
Certification for according:<br />
Marine industry: GL, LR, BV,<br />
RINA, DNV<br />
ASME*<br />
GOST (Ru)<br />
SELO (China) **<br />
* ASME Section VIII Boiler & Pressure Vessel Code<br />
** Boiler & Pressure Vessel Manufacture Licensing of P.R. China<br />
6
INTEC Offices across the World<br />
Offer support in consultancy, sales,<br />
project management, service <strong>and</strong><br />
commissioning <strong>and</strong> after sales support<br />
INTEC Energy Systems Sdn. Bhd.<br />
Malaysia serving since 2007 South-East<br />
Asia, located in Kuala Lumpur area<br />
Further offices in India, Netherl<strong>and</strong>s,<br />
Singapore<br />
7
Thermal oil heaters<br />
INTEC Type : ET<br />
Range of capacity: 50 to 25,000 kW<br />
Fired by natural gas or fuel oil<br />
High efficiency up to 95 %<br />
Air pre-heater, stack optionally<br />
Easy maintenance<br />
Safe design <strong>and</strong> operation<br />
Down firing<br />
Up firing option<br />
8
Thermal oil heaters<br />
INTEC Type: ET<br />
INTEC Thermal oil heaters are characterized by the<br />
following features:<br />
Optimized heat transfer <strong>and</strong> high efficiency design<br />
Tailor-made design to individual customer<br />
requirements<br />
Environmental friendly operation due to low<br />
emission values<br />
High operational reliability<br />
Low operating costs<br />
Long service life<br />
9
Waste heat boilers<br />
INTEC Type: ETA<br />
<strong>Heat</strong> <strong>Recovery</strong> Boilers using the energy of<br />
flue gases to heat up liquid heat transfer<br />
medium<br />
Available as:<br />
One pass radiation heater<br />
One pass convection heater<br />
in tube b<strong>and</strong>le design<br />
Three pass heater<br />
One pass heater with multiple<br />
concentrical coils<br />
10
Steam Generators<br />
Indirect, thermal oil heated steam<br />
generators<br />
Capacity up to 30 t/h of saturated<br />
steam<br />
Pressure up to 35 bar<br />
Easy regulation<br />
Operation without permanent<br />
attendance<br />
Complete systems with water treatment<br />
equipment<br />
11
High pressure steam boilers<br />
INTEC Type : iNOOK<br />
Natural circulation boiler<br />
High pressure boiler for<br />
closed circuits<br />
Up to 10 t/h, 100 barg<br />
Fired by natural gas or fuel oil<br />
12
Schneider-Kessel Berlin<br />
Germany<br />
Family-owned boiler manufacturer, 5th Generation since 1881<br />
More than 5,000 delivered boilers world-wide<br />
Holder of Eckrohr-Kessel Licence<br />
Design, development,<br />
tailor-made solutions<br />
Engineering, Consultancy,<br />
Project Management<br />
Commissioning,<br />
Supervision of installation<br />
After Sales Services<br />
13
Schneider-Kessel Berlin<br />
Products:<br />
Flame-tube-smoke-tube boiler<br />
Single-flame-tube boiler<br />
up to 25 t/h<br />
Flame-tube-smoke-tube boiler<br />
Double-flame-tube boiler<br />
up to 45 t/h<br />
Waste-heat recovery boiler<br />
WHR-Type<br />
Smoke tube design<br />
0.1-65 MW / 0,2-100 t/h<br />
up to 100 bar/450°<br />
indirect heated by gas engine,<br />
gas turbine, industrial processes<br />
Water-tube boiler ERK Type<br />
Eckrohrboiler design<br />
up to 100 t/h, 100 barg<br />
14
Energy plants<br />
Complete energy plants for particleboard, MDF or OSB production<br />
with heat transfer by thermal oil, steam or hot gas<br />
Capacity range: up to 100 MW<br />
Fuels like bark, wood chips,<br />
production waste, fines,<br />
s<strong>and</strong>ing dust, saw dust, rice husk,<br />
empty fruit bunches <strong>and</strong> other<br />
biomass fuels.<br />
Other fuels like coal, natural gas<br />
or fuel oil may be used additionally<br />
Low emissions, modular design,<br />
high reliability<br />
15
Power <strong>and</strong> co-generation plants<br />
Combustion systems for power plants,<br />
output up to 10 MWel<br />
Fuels like bark, wood chips, production<br />
waste, rice husks, other biomass fuels<br />
or coal may be used<br />
High degree of local<br />
manufacturing is possible<br />
16
<strong>Efficient</strong> heat transfer for production processes<br />
<strong>and</strong> energy saving design<br />
Usage of equipment with high efficiency,<br />
applies to heaters, boilers, burners, pumps,<br />
fans etc.<br />
Modern plant design with centralised heating<br />
point <strong>and</strong> service to individual consumers<br />
Waste heat recovery systems<br />
<strong>Efficient</strong> piping <strong>and</strong> ducting design<br />
17
Usage of Combustion Air Preheating System (CAPS)<br />
Transfer of heat from flue<br />
gas to combustion air<br />
Increases efficiency by up<br />
to 7%<br />
Considering non<br />
subsidized fuel (oil or<br />
gas) leads to ROI of 12-<br />
24 months<br />
Design is important,<br />
cross-counter flow plus<br />
parallel flow<br />
18
Usage of Economizer<br />
Transfer of heat from flue<br />
gas to heat transfer<br />
medium<br />
May be applied to<br />
thermal oil or to steam<br />
boilers<br />
Secondary heat transfer<br />
medium like hot water<br />
may be heated<br />
19
Proper Plant Design<br />
20
Plant design with centralised system<br />
Interface is the Zero<br />
pressure header<br />
Several heating units<br />
working in parallel<br />
Consumers may be served<br />
together or individually<br />
Higher efficiency due to<br />
optimised boiler operation<br />
21
Waste <strong>Heat</strong> <strong>Recovery</strong> Units<br />
<strong>Recovery</strong> of unused heat from<br />
production process<br />
Preheating of combustion air<br />
<strong><strong>Heat</strong>ing</strong> of heat transfer medium<br />
Stainless steel piping optionally<br />
Modular design allows usage of<br />
different types for divers industries<br />
22
Waste <strong>Heat</strong> <strong>Recovery</strong><br />
<strong>Heat</strong> recovery from engine<br />
<strong>Heat</strong> recovery from gas turbine<br />
23
Insulation of equipment <strong>and</strong> piping<br />
Proper insulation needs to be done to reduce heat losses<br />
Good insulation allows efficient<br />
heat transfer over long distances;<br />
e.g. temperature loss of < 1°C<br />
over 100 m of piping at<br />
temperatures up to 400°C<br />
Quick removal <strong>and</strong> fixing of<br />
leakages, increases also safety<br />
for operation <strong>and</strong> personnel<br />
24
Contact Addresses<br />
INTEC Rohrtechnik GmbH<br />
John-Deere-Str. 41<br />
D-76646 Bruchsal<br />
Germany<br />
Tel.: +49 7251 3 66 29-10<br />
Fax: +49 7251 3 66 29-25<br />
intecrohr@aol.com<br />
INTEC Service GmbH<br />
Zeiloch 15<br />
D-76646 Bruchsal<br />
Germany<br />
Tel.: +49 7251 30272-22<br />
Fax: +49 7251 30272-27<br />
service@intec-energy.de<br />
Schneider Engineering GmbH<br />
Hildburghauser Straße 79<br />
D-12249 Berlin<br />
Germany<br />
Tel.: +49 30-75 44 93 99-0<br />
info@schneider-kessel.de<br />
INTEC Engineering GmbH<br />
Zeiloch 15<br />
D-76646 Bruchsal/Germany<br />
Tel.: +49 7251 93 243-0<br />
Fax: +49 7251 93 243-99<br />
info@intec-energy.de<br />
INTEC Energy Systems Sdn Bhd.<br />
6F-21, IOI Business Park,<br />
47170 Puchong, Selangor;<br />
Malaysia<br />
Tel.: +6 03 8071 1842<br />
Fax.:+6 03 8071 1824<br />
yap.fw.@intec-energy.de<br />
www.intec-energy.de<br />
INTEC Netherl<strong>and</strong>s BV<br />
PO Box 101<br />
NL-8180 AC Heerde<br />
The Netherl<strong>and</strong>s<br />
Tel.: +31 653231730<br />
Fax: +31 842299814<br />
<strong>and</strong>re.bastiani@intec-energy.de<br />
INTEC <strong><strong>Heat</strong>ing</strong> Solutions (India) Ltd.<br />
B- 410 / A, Gallera<br />
Opp. Bayer House, Hiran<strong>and</strong>ani Gardens<br />
Powai, Mumbai – 400 076<br />
India<br />
Tel./Fax: +91 22 259 42292<br />
bharat.k@intec-energy.de<br />
INTEC UB Pte Ltd.<br />
4 Battery Road<br />
Bank of China Building # 25-01<br />
Singapore 049908<br />
Telefon +65 6408 8000<br />
Telefax +65 6408 8001<br />
info@intec-ub.com<br />
www.intec-ub.com<br />
25