4 Market Based Criteria 46

248.3

235.0

235.1

199.6 G6

584.1 G5

G6

L6

585.0 G5

L6

6

20.07

6

19.96

5

Mean of Power in MW

20.82

5

15.7

29.0

20.81

Fig. 4.5 – The eight bus network after adding plan 3

115.2

36.1

0.6

159.6

246.3

162.5

127.9

159.3

134.4

limit=140

274.4

limit=200

limit=200

limit=140

138.9

163.6 18.66 21.7

24.64

27.64

Fig. 4.6 - The eight bus network after adding plan 5

Table 4.1 – Value of the market based criteria for the suggested plans

TL4

4 98.8

18.88 1 2 3

G1,1 96.8

G2,1 (IPP)

85.4

TL2

98.8

L2

284.1

L3 23.54

G3 285.6

108.6

Mean of LMP in $/MWhr

21.7

45.6

TL4

4 98.8

G4

L4

245.0 20.84 60.9 37.2

19.12 1 2 3

G1,1 97.7

G2,1 (IPP)

86.6

TL2

98.8

L2

282.9

L3 24.72

G3 285.2

122.6

Mean of LMP in $/MWhr

Mean of Power in MW

22.2

200.9

L4

140.7

97.4

G4

5.8

282.6

24.69

281.8

7

63.0

26.50

24.81

L8

8

7

25.00

L8

8

G7

238.1

G7

238.1

178.7

186.3