Route 29 & Route 676

Route 29 & Route 676 Unsignalized Table 3 (cont.) New Baltimore Costco Levels of Service and Back of Queue (95%) Results 2012 Background Conditions EB/T # 1 - - - - - - EB/T # 2 EB/R - - - - - - WB/T # 1 WB/T # 2 WB/L F 314 F 529 F 579 NB/L F 597 F 322 F 459 NB/R - - - - - - EB/T # 1 EB/T # 2 - - - - - - C 1978 C 1175 C 1300 EB/R A 25 A 90 A 48 EB LOS C C C Route 29 & Route 676 Signalized (Improvement) WB/L WB/T # 1 WB/T # 2 F A 270 418 D C 348 2065 D A 225 713 WB LOS C C B NB/L D 140 D 103 D 95 NB/R D 343 C 385 C 275 NB LOS D C C Overall LOS C C B Route 600 & Kelly Drive Unsignalized EB/TR WB/LT NB/LR - A B - 25 25 - A C - 25 33 - A B - 25 25 EB/LT A 25 A 25 A 25 Route 600 & Route 676 Unsignalized EB/R WB/LTR NB/LTR - A F - 25 599 - A F - 25 - - A F - 25 303 SB/LTR F 504 F 1607 F 723 EB/LT B 280 C 378 C 188 EB/R B 45 B 133 B 90 EB LOS B B B WB/LTR B 238 D 465 C 205 Route 600 & Route 676 Signalized (Improvement) WB/R WB LOS NB/LTR B C B 110 440 B B C 133 308 B B B 163 218 NB LOS C B B SB/LTR B 258 C 680 C 458 SB LOS B C C Overall LOS B C B Route 676 & Route 215 Unsignalized EB/LR NB/LT SB/TR F B - 973 40 - F B - 1195 47 - F A - 424 25 - EB/L C 93 D 143 C 193 EB/R A 25 A 25 A 25 EB LOS A A B Route 676 & Route 215 Signalized (Improvement) NB/L NB/T NB LOS B A A 228 170 A A A 263 473 A A A 93 240 SB/RT A 575 A 375 A 395 SB LOS A A A Overall LOS A A A * Assumed 25 feet Vehicle Length EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 14

Code 4. Trip Generation Land Use PHR+A determined the number of trips entering and exiting the site using equations and rates provided in the 7 th Edition of the Institute of Transportation Engineers’ (ITE) Trip Generation Report. Table 4 is provided to summarize the total trip generation associated with the New Baltimore Costco development. Amount Table 4 Proposed Development: New Baltimore Costco Center Trip Generation Summary Weekday AM Peak Hour Weekday PM Peak Hour Weekday Saturday Peak Hour Saturday In Out Total In Out Total ADT In Out Total ADT East Side of Cross Creek Drive 820 Ga. Shopping Center 33,000 SF 49 31 80 145 157 301 3,303 219 202 421 4,595 861 Discount Club 154,000 SF 61 25 86 326 326 653 6,437 517 538 1,055 8,278 932 H-T Restaurant 4,900 SF 29 27 56 33 21 54 623 62 36 98 776 932 H-T Restaurant 4,900 SF 29 27 56 33 21 54 623 62 36 98 776 933 Fast Food w/out DT 3,200 SF 84 56 140 43 41 84 2,291 86 89 175 2,227 934 Fast Food w/ DT 3,200 SF 87 83 170 58 53 111 1,588 97 93 189 2,310 934 Fast Food w/ DT 1,400 SF 38 36 74 25 23 48 695 42 41 83 1,011 944 Gas Station (Costco) 12 pumps 69 69 138 83 83 166 2,023 83 83 166 2,023 West Side of Cross Creek Drive 820 Ga. Shopping Center 32,000 SF 48 31 79 142 153 295 3,238 215 198 413 4,507 881 Pharmacy w/ DT 14,000 SF 21 16 37 59 62 121 1,234 55 55 110 1,234 912 Drive-in Bank 6,400 SF 44 35 79 146 146 293 1,424 121 116 237 491 932 H-T Restaurant 4,900 SF 29 27 56 33 21 54 623 62 36 98 776 948 Automated Car Wash 5,000 SF 36 35 71 36 35 71 706 36 35 71 1,412 Total Trips 626 499 1,125 1,161 1,142 2,303 24,808 1,655 1,558 3,214 30,416 100% (15% maximum per use) Total Internal 31 31 61 113 113 226 2,400 164 164 329 3,104 8% (15% maximun) Total Pass-by 84 84 169 173 173 345 3,721 241 241 482 4,562 15% Total "New Trips" 511 384 894 875 856 1,731 18,687 1,250 1,153 2,403 22,750 77% 5. Site Traffic Distribution and Traffic Assignments The distribution of trips was based upon existing travel patterns for the roadway network surrounding the proposed site. PHR+A utilized the trip distribution percentages shown in Figure 7 to assign the New Baltimore Costco development trips, shown in Table 4, throughout the study area. Figure 8 provides the corresponding development-generated Weekday AM/PM and Saturday mid-day peak hour traffic volumes as well as the Weekday and Saturday ADT assignments. For informational purposes, PHR+A has provided Figures 8A and 8B to show the development-generated “new trips” and “passby trips”, respectively. Percentage of Total A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 15

Virginia department of transportation traffic - Fauquier County
Section 6.0 Traffic Impact Analysis - SWALCO
Appendix D Traffic Impact Analysis - westplainseis.com
guidelines for traffic impact analysis (zoning petitions)
Traffic Impact Analysis for D-19 and the Porposed National ... - semcog
APPENDIX 'C' Traffic Impact Assessment - Northumberland County
Iron Mountain Quarry Traffic Impact Analysis
new monaco traffic impact study peachland, bc - District of Peachland
Traffic Impact Study – The Greens South at ... - Loudoun County
Salinas Ag-Industrial Center Traffic Impact Analysis - City of Salinas
iv. environmental impact analysis b. transportation and traffic
Traffic Impact Study with comments from MOTI - Fraser Valley ...
fiscal & economic impact analysis imperial county april 2011