6.

6. Analysis of 2012 Conditions with Development A. Future Daily and Peak Hour(s) Traffic Volumes The New Baltimore Costco development assigned trips (Figure 8) were added to the 2012 background traffic volumes (Figure 5) to obtain 2012 build-out conditions. Figure 9 shows the 2012 build-out Weekday and Saturday ADT as well as Weekday AM/PM and Saturday mid-day peak hour traffic volumes at key locations within the study area. B. Capacity Analyses and Level of Service Figure 10 shows the 2012 build-out lane geometry as well as Weekday AM/PM and Saturday mid-day peak hour levels of service. Table 5 is provided to show the 2012 build-out Weekday AM/PM and Saturday midday peak hour levels of service and 95 th percentile back of queue for each lane group. All HCS+ level of service worksheets are included in the Appendix section of this report. A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 20

N No Scale 15 29 [56](40)78 [2394](1916)2535 [176](338)218 [218](386)219 [45](111)30 41(229)[80] 16(55)[37] 22(9)[38] Kelly Drive 15 29 600 [189](298)193 [25](25)49 [60](46)105 11(22)[48] 1548(2713)[2331] 14(105)[49] 600 1(7)[6] 0(0)[0] 2(10)[9] [6](5)2 [1866](1530)2413 [620](436)246 29(71)[66] Cross Creek Site Dr. # 1 600 273(289)[218] [57](80)73 [70](60)61 [582](429)196 [0](0)0 [524](386)176 Kelly Drive 3(8)[9] 1375(2405)[1841] 221(393)[558] SITE [62](44)26 [270](437)323 Driving Range Cross Creek Site Dr SITE Figure 9 2012 Build-out Traffic Conditions 600 [64](79)70 [229](312)241 [208](218)88 Cross Creek Drive [2379](1909)2524 [20](17)67 Commerce Ct. 39(99)[77] 98(236)[185] 102(173)[150] [197](191)141 [116](129)149 [45](59)148 102(175)[250] 294(392)[283] 600 Commerce 676 Court 1570(2734)[2396] [12](71)30 [14](30)37 37(25)[13] 120(133)[158] 216(277)[259] 70(136)[60] 15 29 [2262](1793)2491 [131](146)70 15 29 215 [143](100)70 [251](405)405 AM Peak Hour(PM Peak Hour)[Sat Peak Hour] A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 21 [60](62)83 676 Weekday ADT Saturday ADT [292](305)273 1523(2697)[2349] 182(396)[334] 306(718)[389] 297(401)[267] 15 29

Virginia department of transportation traffic - Fauquier County
Appendix D Traffic Impact Analysis - westplainseis.com
guidelines for traffic impact analysis (zoning petitions)
Section 6.0 Traffic Impact Analysis - SWALCO
Iron Mountain Quarry Traffic Impact Analysis
Traffic Impact Analysis for D-19 and the Porposed National ... - semcog
Salinas Ag-Industrial Center Traffic Impact Analysis - City of Salinas
Traffic Impact Study – The Greens South at ... - Loudoun County
APPENDIX 'C' Traffic Impact Assessment - Northumberland County
iv. environmental impact analysis b. transportation and traffic
new monaco traffic impact study peachland, bc - District of Peachland
Traffic Impact Study with comments from MOTI - Fraser Valley ...
fiscal & economic impact analysis imperial county april 2011