Traffic Impact Analysis of New Baltimore Costco - Fauquier County

Traffic Impact Analysis of New Baltimore Costco - Fauquier County

Route 29 & Commerce

Route 29 & Commerce Court Table 5 (cont.) New Baltimore Costco Levels of Service and Back of Queue (95%) Results 2012 Build-out Conditions EB/T # 1 - - - - EB/T # 2 Unsignalized EB/R - - - - - - WB/T # 1 WB/T # 2 WB/L E 32 C 25 D 25 NB/L F 100 F 25 F 35 NB/R E 31 C 63 D 25 EB/T # 1 EB/T # 2 - - - - - - - - C 2108 A 835 C 1918 EB/R A - A - A - EB LOS C A C Route 29 & Commerce Court Signalized (Improvement) WB/T # 1 WB/T # 2 WB/L B A 33 563 A D 25 2675 A C 25 1953 WB LOS A D C NB/L D 48 D 128 D 25 NB/R D 58 D 53 D 25 NB LOS D D D Overall LOS C C C EB/T # 1 EB/T # 2 - - - - - - EB/R - - - - - - Route 29 & Route 676 Unsignalized WB/T # 1 WB/T # 2 A - A - A - WB/L F 355 F 745 F 786 NB/L F 642 F 467 F 625 NB/R EB/T # 1 - - - - - - EB/T # 2 EB/T # 3 B 1085 B 710 C 1193 EB/R A 25 A 55 A 53 EB LOS B B C Route 29 & Route 676 Signalized (Improvement) WB/L WB/T # 1 WB/T # 2 WB/T # 3 F A 375 340 F B 973 923 E A 553 663 WB LOS B C B NB/L D 115 C 85 D 83 NB/R C 250 B 255 B 235 NB LOS C C C Overall LOS B C C Route 600 & Kelly Drive Unsignalized EB/TR WB/LT NB/LR - A B - 25 27 - A C - 25 57 - A B - 25 25 EB/TL B 335 C 553 B 355 EB LOS B C B Route 600 & Cross Creek Site driveway Signalized WB/TR WB LOS SB/LR B B B 388 95 C B C 638 223 C C C 588 313 SB LOS B B C Overall LOS B C C EB/LT A 25 A 25 A 25 Route 600 & Route 676 Unsignalized EB/R WB/LTR NB/LTR - A F - 25 965 - A F - 25 - - A F - 25 - SB/LTR F 619 F - F 1103 EB/LT B 315 C 453 B 303 EB/R B 78 B 198 B 200 EB LOS B B B WB/LT B 290 D 598 B 328 WB/R B 108 B 115 B 148 Signalized Route 600 & Route (Improvement) 676 WB LOS NB/L NB/TR B B B 143 313 C B C 255 193 C B B 223 153 NB LOS B C B SB/L B 105 C 193 B 153 SB/TR B 130 C 370 B 263 SB LOS B C B Overall LOS B C B Route 676 & Route 215 Unsignalized EB/LR NB/LT SB/TR F B - 1171 54 - F B - 1568 72 - F B - 918 34 - EB/L D 98 D 143 D 215 EB/R A 25 A 25 A 25 EB LOS B A B Signalized Route 676 & Route (Improvement) 215 NB/L NB/T NB LOS B A A 293 153 C A B 458 473 A A A 188 203 SB/RT A 520 A 375 A 335 SB LOS A A A Overall LOS A A A * Assumed 25 feet Vehicle Length EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound L: Left, T:Thru, R: Right Minimum queue length is assumed to be 25 feet A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 24

7. Conclusions The traffic impacts associated with the proposed New Baltimore Costco development are acceptable and manageable. Assuming suggested improvements, all the study area intersections will maintain overall levels of service “C” or better during 2012 build-out conditions. The following describes the suggested roadway improvements for each of the study area intersections as shown in Figure 10 during 2012 build-out conditions. • Route 29/15 (Lee Highway)/Route 600 (Broad Run Church Road): This intersection will require an additional eastbound and westbound thru lane, two (2) northbound left-turn lanes and a southbound left-turn lane to maintain acceptable levels of service. {These improvements are necessary without the proposed Cross Creek/Costco development} • Route 29/15 (Lee Highway)/Route 676 (Riley Road): This intersection will require traffic signalization along with an additional thru lane in the eastbound and westbound directions to maintain acceptable levels of service. {These improvements are necessary without the proposed Cross Creek/Costco development} • Route 600 (Broad Run Church Road)/Route 676 (Riley Road): This intersection will require traffic signalization, a westbound right-turn lane and a northbound southbound left-turn lane to maintain acceptable levels of service. {These improvements are necessary without the proposed Cross Creek/Costco development} • Route 215 (Vint Hill Road)/Route 600 (Broad Run Church Road): This intersection will require traffic signalization along with a left-turn lane in the eastbound and northbound directions to maintain acceptable levels of service. {These improvements are necessary without the proposed Cross Creek/Costco development} • Route 29/15 (Lee Highway)/Commerce Court: This intersection will require traffic signalization to maintain acceptable levels of service. {These improvements are necessary without the proposed Cross Creek/Costco development} • Route 29/15 (Lee Highway)/Cross Creek Site-Driveway: This intersection will require traffic signalization, an additional left-turn lane and 4 th leg in northbound direction to maintain acceptable levels of service. {These improvements are necessary with the proposed Cross Creek/Costco development} A Traffic Impact Analysis of New Baltimore Costco PHR+A Project # 15116-1-0 April 17, 2007 Page 25

Virginia department of transportation traffic - Fauquier County
Section 6.0 Traffic Impact Analysis - SWALCO
Appendix D Traffic Impact Analysis - westplainseis.com
guidelines for traffic impact analysis (zoning petitions)
Iron Mountain Quarry Traffic Impact Analysis
Traffic Impact Analysis for D-19 and the Porposed National ... - semcog
Salinas Ag-Industrial Center Traffic Impact Analysis - City of Salinas
APPENDIX 'C' Traffic Impact Assessment - Northumberland County
Traffic Impact Study – The Greens South at ... - Loudoun County
iv. environmental impact analysis b. transportation and traffic
new monaco traffic impact study peachland, bc - District of Peachland
Traffic Impact Study with comments from MOTI - Fraser Valley ...
fiscal & economic impact analysis imperial county april 2011