Views
4 years ago

Preliminary Engineering Report - Fauquier County

Preliminary Engineering Report - Fauquier County

DynaLift OUT-OF-BASIN

DynaLift OUT-OF-BASIN MEMBRANE BIOREACTORS LOW PRESSURE LOW COST LOW CARE DYNATEC SYSTEMS, INC.

WASTE STREAM The waste stream is introduced to the anoxic tank for use as a carbon source for the process. The system accomodates variable flows and concentrations much better than conventional systems. BIOREACTOR TANK Smaller than conventional treatment systems due to much higher levels of mixed liquor. ANOXIC TANK Used to denitrify the waste stream, if required. DYNALIFT MBR SYSTEMS use industrial-grade membranes in a sealed, low-pressure system to separate biological solids from water BLOWER Blower air provides DynaLift MBRSYSTEMS Dynatec Systems has built on its water treatment experience that began in the 1970’s, using membranes with rugged industrial reliability to produce an MBR system with extremely low operating costs. Wrapped in a compact package, DynaLift MBR Systems are easy to install and maintain. oxygen for the process. Membrane Bioreactors with the Lowest Energy & Operating Costs Key Benefits with the lowest energy and operating costs for any bioreator system produced today. Out-of-Basin Flexibility immersion tanks. existing tanks and basins or performance. Low Cost of Ownership DynaLift MBR Systems lowers the total cost of operation: rates reduce energy costs. installation costs. lowers costs needs less space reduces replacement costs Better Performance cleans the membrane: membranes clean.

fauquier high school renovation and addition - Fauquier County
PDR Program Qualifications - Fauquier County
fauquier county purchase of development rights program progress ...
Your Anthem HealthKeepers Plan - Fauquier County
BLACK BEAR SAFETY TECHNIQUES - Fauquier County
The American Battlefield Protection Program - Fauquier County
Your Prescription Drug 10-20-35 or 20% with ... - Fauquier County
Good Times - Holiday Issue FINAL for Print - Oct ... - Fauquier County
AREA A/B ENGINEERING REPORT - Waste Management
Concept Report / Preliminary Technical and Cost Analysis
Tri-County Growth Management Plan Preliminary Draft - Santa Rosa ...
RPCC-Preliminary-Design-Phase-Summary-Report-December-2014
County Prison Oversight Project Preliminary Report
Final_Moose-Wilson-Corridor-Preliminary-Alternatives-Public-Comment-Report
2010.2011 Engineers Report - Orange County Water District
OCWD 2008 2009 Engineers Report - Orange County Water District
2012 Hamilton County Engineer Annual Report
OCWD 2007 2008 Engineers Report - Orange County Water District
Preliminary SWM/BMP Checklist - Fauquier County