US 29 / 15 Lee Highway &

US 29 / 15 Lee Highway & Route 215 Vint Hill Road DRAFT Evaluation & Recommendations Two mitigation measures were identified as having the potential to address the rear-end collision concerns on US 29 northbound without the construction of a concept alternative. (Numbered per their respective number from the description list previously presented) 10. Install Queue length detectors along US 29 northbound that can trigger dynamic message signs to display approximate distance to stopped vehicles. 11. Install a traffic camera and full matrix, color dynamic message sign to display roadway conditions to approaching traffic where the crest curve currently limits sight distance. Most of the combinations of concept alternatives included Synchro and Simtraffic analysis, but some of the alternatives did not warrant this level of effort. The alternatives that were not modeled are listed below (numbered per their respective number from the description list previously presented). 1. Construct a left turn lane on US 29 northbound at Vint Hill Road. 2. Modify the ends of the unpaved median and / or construct an island in the median of the intersection to block left turns and U-turns from US 29 northbound. 7. Re-grade the vertical curve on US 29 northbound approaching Vint Hill Road to improve stopping sight distance. 8. Relocate Vint Hill Road to allow for a grade separation between US 29 northbound and Vint Hill Road. Of the non-modeled alternatives the first two (1 and 2) on their own would not significantly address the operational and safety concerns, though each may be included with the one of the alternatives under further consideration if appropriate. The second two non-modeled alternatives (7 and 8) are inherently much more expensive than the other alternatives and should be considered as potential long-term alternatives. Since the primary focus of this study is to identify short-term to intermediate-term solutions to address the intersection concerns, these two more costly but potential long-term solutions were not selected for further investigation. The following table presents a summary of the results of the Simtraffic analysis for different combinations of alternatives. Please note that alternatives with “West” are referring to indirect lefts from US 29 SB to Vint Hill Road – the median U-turn location is west of the intersection per map North. Similarly alternatives with “East” are referring to indirect lefts from Vint Hill Road to US 29 southbound – the median U-turn location is east of the intersection per map North. Page 14 of 21 Over a Century of Engineering Excellence

US 29 NB Thru at Vint Hill 95% Queue (ft) US 29 / 15 Lee Highway & Route 215 Vint Hill Road DRAFT Evaluation & Recommendations US 29 SB LT at Vint Hill 95% Queue (ft) Vint Hill WB RT 95% Queue (ft) SB to NB U-Turn @ West 95% Queue (ft) US 29 NB Thru @ West 95% Queue (ft) NB to SB U-Turn @East 95% Queue (ft) US 29 SB Thru @ East 95% Queue (ft) Network Total Delay (veh-hr) AM / PM AM / PM AM / PM AM / PM AM / PM AM / PM AM / PM AM / PM Existing 611 / 256 148 / 285 151 / 78 NA NA NA NA 11.9 / 10.1 WB RT Acceleration Lane 463 / 267 134 / 197 0 / 0 NA NA NA NA 10.2 / 9.3 One Indirect-Left (West) 164 / 66 NA 153 / 100 111 / 160 238 / 153 NA NA 8.8 / 8.9 One Indirect-Left (West) + RT Acc 159 / 74 NA 0 / 0 122 / 163 255 / 146 NA NA 8.5 / 8.1 One Indirect-Left (East) 420 / 226 241 / 226 246 / 145 NA NA 98 / 103 82 / 247 9.7 / 9.4 One Indirect-Left (East) + RT Acc 290 / 226 237 / 255 NA NA NA 100 / 101 82 / 245 7.9 / 9.0 Two Indirect-Left NA NA 232 / 105 139 / 163 225 / 140 82 / 108 70 / 229 9.4 / 9.0 Two Indirect-Left + RT Acc NA NA 0 / 17 149 / 164 268 / 139 81 / 110 84 / 228 8.6 / 8.8 Dual LT 441 / 231 95 / 125 174 / 83 NA NA NA NA 10.0 / 9.4 Dual lefts + Indirect left (East) 334 / 155 119 / 165 315 / 158 NA NA 91 / 98 89 / 272 8.7 / 8.9 Dual lefts + RT Acc 386 / 227 98 / 124 0 / 0 NA NA NA NA 8.7 / 9.2 Dual lefts + Indirect left (East) + Acc 180 / 161 121 / 154 0 / 0 NA NA 101 / 107 83 / 295 6.7 / 8.9 The following combinations of alternatives are considered worth investigating further to develop short-term to intermediate-term projects to address the traffic operational and safety issues at this intersection. Simtraffic Analysis Name Alternative Descriptions One Indirect Left (West) Indirect left US 29 SB to Vint Hill One Indirect Left (West) + RT Acc Indirect left US 29 SB to Vint Hill and Acceleration / merge lane from Vint Hill to US 29 NB Two Indirect Lefts Indirect left US 29 SB to Vint Hill Indirect left Vint Hill to US 29 SB Two Indirect Lefts + RT Acc Indirect left US 29 SB to Vint Hill Indirect left Vint Hill to US 29 SB Acceleration / merge lane from Vint Hill to US 29 NB Dual lefts + Indirect Left (East) + Acc Dual left turns US 29 SB to Vint Hill Indirect left Vint Hill to US 29 SB Acceleration / merge lane from Vint Hill to US 29 NB Each of these selected alternative combinations address the US 29 northbound traffic queue that combined with the limited vertical sight distance over the hillcrest approaching the Vint Hill Road intersection contribute significantly to the number and severity of the rear-end collisions on US 29 northbound. Page 15 of 21 Over a Century of Engineering Excellence

Print or Download - Fauquier County, Virginia
fauquier county purchase of development rights program progress ...
fauquier high school renovation and addition - Fauquier County
Marriott Ranch Corporate Retreats - Fauquier County, Virginia
2008 - Virginia Department of Transportation
PDR Program Qualifications - Fauquier County
a policy on Geometric Design of - Virginia Department of ...
Public Involvement Process - Virginia Department of Transportation
DMV Annual Report - West Virginia Department of Transportation
Geospatial Transportation Information - West Virginia Department of ...
ntroduction To Field Guide - Virginia Department of Transportation
Handout - West Virginia Department of Transportation
agenda - West Virginia Department of Transportation
Download - West Virginia Department of Transportation
Transportation Technical Report - Virginia Department of ...
Business Plan - Virginia Department of Transportation
FINANCIAL REPORT - Virginia Department of Transportation
Hampton Roads - Virginia Department of Transportation
US-340 Corridor Study - West Virginia Department of Transportation
DESIGN RECOMMENdATIONS - Gloucester County Virginia
tods/logo - West Virginia Department of Transportation
WV Driver Handbook - West Virginia Department of Transportation ...
2012 Annual Report - Virginia Department of Transportation
Public-Private Transportation Act - Virginia Department of ...
STARS Workshop - West Virginia Department of Transportation
Route 24 Draft Report - Bedford County, Virginia
King William County - Virginia Department of Fire Programs
Louisa County - Virginia Department of Fire Programs
Charlotte County - Virginia Department of Fire Programs
Tech Memo 5 - Kane County Department of Transportation - Kane ...