Views
4 years ago

Commercial Site Plan - Fayette County Government

Commercial Site Plan - Fayette County Government

Commercial Site Plan - Fayette County

PROJECT NAME: PROJECT ADDRESS: APPLICANT: Fayette County Stormwater Management Department 140 Stonewall Avenue West, Suite 203, Fayetteville, GA 30214 770-305-5410 Commercial Site Plan Checklist (Amended 6/2009) Site Plans must be prepared by an engineer or architect registered by the State of Georgia. Items marked with (*) are missing or deficient Plan Included Page# Y/N 1. Provide name and location of the development (including land lot and district). Include Subdivision name on recorded plat as applicable. 2. Provide name, address, and telephone number of developer/owner and applicant. 3. Provide name, address, telephone number, and professional seal of person preparing plan. 4. Show locations and dimensions of all existing and proposed structures (principal and accessory). 5. Delineate FEMA 100-year floodplain and identify source used for delineation. Reference the correct September 26, 2008 FIRM Panel. The MFFE must be at least 3.0 ft above the 100-year elevation. 6. Delineate all watershed protection buffers and setbacks outlines in the Development Regulations, Section VII, Watershed Protection Ordinance. A minimum of 1.0 acre or 50% of the minimum lot size, whichever is greater must be out of the building setbacks. 7. Rights-of-way dedication (as needed), pavement edges, centerlines of roadways, and all easements. 8. Show distances between buildings. 9. Show number of stories, square footage per unit size, number of units per unit size and total number of units. 10. Show exit(s)/entrance(s) and internal circulation pattern include traffic lanes, fire lanes, acceleration/deceleration lanes and all dimensions. Indicate all non-residential drives and street intersections within 500’ of proposed curb cut (both sides of the road). 11. Show parking layout, including handicapped parking and landscaping. Indicate how number of spaces was determined. (Article 8 of Development Regulations). Page 1 of 3

Download the 2011 Annual Report - Fayette County Government
Integrating Transportation Decisions - Fayette County Government
UPDATE Changes in Transparency - Fayette County Government
Carlyle Lake Final Plan.pdf - Fayette County Soil & Water ...
PLAN 5- december 06-4.indd - Fayette County
Kingston/Appletree Cove Watershed - Kitsap County Government
Watershed Management Plan - Mason County
Trout Brook Watershed Management Plan - Cumberland County ...
transition plan - The Madison County Council of Governments
Fair Housing Plan - Orange County Government - OrangeCountyFl.net
The 2012 Regional Transportation Plan: Orange County ... - ictpa-scc
aka “AfG” – Growth Offsets - Carroll County Government
School Plans review - Blount County Government
Inside - Kitsap County Government
Marketing plan - Volusia County Government
Site and Regional Context - Fairfax County Government
Planned Penny Projects - Pinellas County
Mountain Area Plan review - powerpoint - Blount County Government
Leon County • Site & Development Plan Review Levels and ...
Westchester Action Plan, 2008 - Westchester County Government
Complete Plan - Delaware County Courthouse and Government ...
FCRHA MTW Plan - Fairfax County Government
2008 Comprehensive Plan - Hardin County Government
aka “AfG” – Growth Offsets - Carroll County Government
Comprehensive Water Management Plan - St. Louis County
Draft Service Plan - Council of Fresno County Governments
Complete Plan - Delaware County Courthouse and Government ...
Muncy Creek Planning Area - Lycoming County Government
Water Quality Plan review - Blount County Government