13.10.2013 Views

Selling price calculation of a Wind Turbine Generator (WTG)

Selling price calculation of a Wind Turbine Generator (WTG)

Selling price calculation of a Wind Turbine Generator (WTG)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Selling</strong> <strong>price</strong> <strong>calculation</strong><br />

<strong>of</strong> a <strong>Wind</strong> ind <strong>Turbine</strong> urbine <strong>Generator</strong> enerator (<strong>WTG</strong>)


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


1. Technical specifications<br />

Name:<br />

<strong>WTG</strong> WP/S-III WP/S III 1,5 MW<br />

Rotor diameter 76 m<br />

Capacity <strong>of</strong> generator 1.500 kW<br />

Base 4.590 m²<br />

Price 1 mio. €<br />

capacity<br />

[kW]<br />

1600<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Capactiy in relation to the wind<br />

speed<br />

0 5 10 15<br />

<strong>Wind</strong> speed [m /s]


1. Technical specifications<br />

- <strong>Wind</strong> speed: 6,5m/s<br />

- Energy output: 342.47 kW<br />

- Capacity apacity p.a.:<br />

8.760 h x 342.47 kW = 3.000 MWh<br />

3.000 MWh<br />

1,5 MW x 8.760 h<br />

Average capacity<br />

- <strong>Wind</strong>turbine utilization factor:<br />

x 100 = 22,7 %


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


2. Decide the costs<br />

- Costs for the wind turbine generator<br />

- <strong>WTG</strong> itself<br />

- Supplement and buildup<br />

- Costs for the property / land<br />

- Costs for the loan (interest)<br />

- Costs for the fall in value (write-down)<br />

(write down)<br />

- Costs for keeping the basement (base fee)<br />

- Costs for maintenance (material and work)<br />

- Calculative costs (e.g. rental for land)


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


3. Valuation <strong>of</strong> costs<br />

Part 1 – Valuation <strong>of</strong> purchasing costs<br />

<strong>WTG</strong> 1.000.000,-<br />

1.000.000,<br />

Buildup 80.000,- 80.000,<br />

Property 225.000,- 225.000,<br />

Purchasing costs 1.305.000,-<br />

1.305.000,


3. Valuation <strong>of</strong> costs<br />

[loan 1.305.000,- 1.305.000, ]<br />

Part 2 – Calculation <strong>of</strong> loan repayment<br />

Repayment p.a. 1.305.000,- 1.305.000, : 20 years = 62.250,- 62.250,<br />

Average interest p.a. 1.305.000,- 1.305.000, : 10 years x 5% = 6.525,- 6.525,<br />

Loan repayment p.a. = 68.775,- 68.775,


3. Valuation <strong>of</strong> costs<br />

Part 3 – Valuation <strong>of</strong> write-down<br />

write down<br />

<strong>WTG</strong> 1.000.000,-<br />

1.000.000,<br />

Buildup 80.000,- 80.000,<br />

Purchasing costs 1.080.000,- 1.080.000, : 20 years =<br />

write-down write down p.a. 54.000,-<br />

54.000,


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


4. Calculation costs<br />

maintenance (material and work) 50.000,-<br />

keeping the basement (base fee) 10.000,-<br />

loan (interest) 68.775,- 68.775,<br />

fall in value (write-down) (write down) 54.000,-<br />

54.000,<br />

property / land (calculative costs) 27.000,-<br />

Summary costs p.a. 245.775,


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


5. Result on the market<br />

Summary costs p.a. 245.775,- 245.775,<br />

Performance 3.000.000 kWh p.a.<br />

Income per kWh 0,11 EUR<br />

- Costs per kWh 0,08 EUR<br />

pr<strong>of</strong>it per kWh 0,03 EUR<br />

= 0,08 EUR / kWh<br />

pr<strong>of</strong>it per 3 mio. mio.<br />

kWh p.a. 90.000,- 90.000, EUR


A <strong>WTG</strong> is a pr<strong>of</strong>itable<br />

investment for the<br />

future and a high quality<br />

option to save the<br />

environment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!