27.10.2013 Views

Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup

Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup

Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-7s Diagnostic <strong>Environmental</strong> Inc.<br />

sc EaSIFOOIFIIII BIVC<br />

Ar:aola Cahtorfi,a<br />

91OW<br />

EIH47 -5216<br />

FAX B1W7-?59:<br />

April26,1993<br />

MS.tinda finlq-Miller<br />

Project Manager<br />

Hazardous and Toxic Waste Section<br />

CESPK-ED-M/H~<br />

U.S. ARMY CORPS OF ENGINEERS<br />

1325 J Street<br />

Sacramento, California 95814-2922<br />

RE ASBESTOS SURVEY REPORT<br />

,/,“J. .<br />

‘(’:)‘“,,<br />

,,lj ,,<br />

c<br />

‘)<br />

U.S. ARMY CORPS OF ENGINEERS - FORT ORD<br />

FORT ORD, CAUFORNIA<br />

CONTRACT NO. DACA05-89-C-0181<br />

MODIFICATION NOS. 7,8,9 (OPTION 6) AND 10<br />

DEI PROJECT NO. 1A2141ABO01<br />

- “’ Dear Ms. Finley-Mille~<br />

A,r&dwater AnaWSls<br />

~mstos Management<br />

Bu!l@ngSysIem EvalJallofi<br />

<strong>Environmental</strong> Engmenn9<br />

Indu$tnal Hyglen@<br />

Refn~lal Inveshgauon<br />

Attached is the <strong>Asbestos</strong> Suwey Report for buildings included in the above-referenced modifications. In<br />

addition, buildings that were included in other modifications have been incorporated into this repofi.<br />

This repofi includes an executive summary, recommended wok<br />

sample results and cost estimates.<br />

items,<br />

If you have any questions regarding this report, please contact our office.<br />

Sincerely,<br />

&d!<br />

Leslie Werner<br />

Project Manager<br />

LW/eb<br />

Enclosure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!