27.10.2013 Views

UVA South Lawn BIM Case Study by Barton Malow - Facilities ...

UVA South Lawn BIM Case Study by Barton Malow - Facilities ...

UVA South Lawn BIM Case Study by Barton Malow - Facilities ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>BIM</strong> PARTNERS<br />

Choose <strong>BIM</strong> Designers and Contractors<br />

• Utilize <strong>BIM</strong> for Drawing Creation<br />

• Integrate <strong>BIM</strong> with Other Processes<br />

Shop Fabrication<br />

Submittal Review<br />

Lessons Learned<br />

AGENDA<br />

<strong>Barton</strong> <strong>Malow</strong> <strong>BIM</strong> Philosophy<br />

<strong>South</strong> <strong>Lawn</strong> Overview<br />

Metrics & Results<br />

Lessons Learned<br />

New <strong>BIM</strong> Applications<br />

PROBLEMS<br />

Difficulty presenting &<br />

communicating<br />

schedule<br />

PROJECT<br />

EXPERIENCE:<br />

SCHEDULING<br />

<strong>BIM</strong> SOLUTION<br />

Link model objects to schedule tasks<br />

Visualize planned progress & sequence<br />

Quantify task work amounts<br />

FT. Pickett Training Facility<br />

New <strong>BIM</strong> Applications<br />

Allow for Technology Interoperability<br />

• Avoid Specifying Software<br />

• Detail Information Needed and Formats<br />

Design: Revit,<br />

Graphisoft,<br />

Bentley<br />

New Cabell Hall Renovation<br />

Charlottesville, VA<br />

Cost Model<br />

Structural<br />

Detailing:<br />

SDS/2, Tekla<br />

Description Quantity<br />

CONSTRUCTION COST<br />

DIRECT COST<br />

Demolition / Abatement 159,129 SQFT<br />

PROBLEMS<br />

Inefficient takeoffs<br />

Lengthy estimate<br />

development<br />

Difficulty<br />

communicating &<br />

reconciling estimates<br />

PROJECT<br />

EXPERIENCE:<br />

PROBLEMS<br />

Multiple uncoordinated<br />

deficiency and issue lists<br />

Inefficient information<br />

exchange between the<br />

field and the office<br />

Tracking and<br />

documentation problems<br />

PROJECT<br />

EXPERIENCE:<br />

INTEROPERABILITY<br />

Software Packages<br />

MEP/FP<br />

Detailing:<br />

Quick Pen, Cad<br />

Duct, HydraCAD<br />

Enclosure<br />

Detailing:<br />

Tekla, Other<br />

Integrated Formats: IFC, IFCZIP<br />

Lessons Learned<br />

ESTIMATING<br />

<strong>BIM</strong> SOLUTION<br />

Construction<br />

Management:<br />

Tekla Structures for<br />

CM, Vela Systems<br />

Export quantity information from <strong>BIM</strong><br />

Visualize estimate items for quick<br />

reconciliation<br />

Morgan State University - CBEIS<br />

New <strong>BIM</strong> Applications<br />

QUALITY CONTROL<br />

Tablet PC Central Database<br />

<strong>BIM</strong> SOLUTION<br />

Utilize tablet PC’s to document issues in the field<br />

Communicate issues to contractors immediately<br />

Track issues through one central database.<br />

Virginia Tech – Ambler-Johnston Renovation<br />

New <strong>BIM</strong> Applications

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!