8 th GEMINI OPERATIONS WORKING GROUP MEETING<br />
February 7-8, 2005<br />
Minutes<br />
Present: Taft Armandroff, Guillermo Bosch, Stephanie Cote (observer), Warrick Couch (Chair), Dennis<br />
Crabtree, Max Faundez-Abans, Paul Francis, Joe Jensen, Rachel Johnson, Sebastian Lopez, Phil Puxley,<br />
Jean-Rene Roy, Doug Simons, Richard Wainscoat.<br />
Action items<br />
Action 8.1: Roy to arrange for the minutes of the February 2004 and August 2004 Operations Working<br />
Group meetings (#6 & #7) to be made accessible to the community (without password protection) on the<br />
<strong>Gemini</strong> Web site.<br />
Action 8.2: Puxley to circulate OT worklist to NGOs.<br />
Action 8.3: Puxley to undertake simulations in order to understand the effects of reducing the queueloading<br />
quantum, with the goal of reducing the size of Science Ranking Band 1 (in terms of total hours)<br />
but at the same time ensuring all partners retain at least one queue program in this band.<br />
Action 8.4: Roy to make arrangements for those contents of the internal <strong>Gemini</strong> webpages that are of<br />
interest to the NGOs and are not of a confidential or sensitive nature, to be made available in a public<br />
area on the <strong>Gemini</strong> website.<br />
Action 8.5: Puxley to change the advertised deadline for Phase II preparation for classical runs to 3<br />
weeks prior to the run (it is currently 2 weeks), making it clear that this is measured from the observer’s<br />
first night.<br />
Action 8.6: NGOs to take responsibility for checking proposals to ensure that the specification of their<br />
instrument resource requirements are complete, and to rectify if need be.<br />
Action 8.7: NGOs to take responsibility for checking Phase I proposals for incorrect email addresses.<br />
Action 8.8: Armandroff to lead the organisation of the next ‘NGO’ meeting in Tucson on 29-30<br />
November 2005, with the assistance of Aspin (<strong>Gemini</strong>), Francis, and a staff member from each of the<br />
Canadian and UK NGOs.<br />
Action 8.9: UK NGO to undertake work required to allow GMOS masks to be made from non-GMOS<br />
images.<br />
Action 8.10: Armandroff to circulate a sample PDF file that is written out from a PIT proposal using<br />
recent NOAO software. Also circulate the style sheet.<br />
Day 1: 7 February 2005<br />
1. Review of Minutes and Action items<br />
Couch opened the meeting and welcomed all participants.<br />
The action items from the August 2004 meeting were reviewed. All of them had been accomplished<br />
except 7.5, with Puxley still to circulate the OT worklist to the NGOs for comments.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
1
Roy then reviewed the relevant <strong>Gemini</strong> Board resolutions, drawing the OpsWG’s attention to: on the<br />
recommendation of the GSC, the Board had adopted the OpsWG’s recommendation for the charging of<br />
queue and classical time; the minimum of 70% with a goal of 80% science fractions for 2005B; the need<br />
for the <strong>Observatory</strong> to increase the completion rates, reduce the ‘salami-slicing’ for queue programs, and<br />
implement electronic delivery of data to PIs as soon as possible.<br />
2. Instrumentation<br />
Doug Simons reviewed the status of <strong>Gemini</strong> instrumentation.<br />
ALTAIR: Work is underway on ALTAIR to increase the size of the isoplanatic patch. The work entails<br />
optics changes in ALTAIR and changes to its wavefront sensor. The <strong>Gemini</strong> North laser underwent preship<br />
acceptance testing at CTI. CTI is addressing the punch list from the tests. The new tip/tilt/focus<br />
sensor for ALTAIR LGS is planned to be installed in April. Commissioning of ALTAIR LGSC is<br />
planned for the middle of 2005.<br />
MICHELLE/T-ReCS: Joe Jensen is working with <strong>Gemini</strong> Staff to procure new filters for MICHELLE<br />
and T-ReCS.<br />
GMOS: The new “Lesserized” CCDs for GMOS have been held up by a contaminated processing oven<br />
at Mike Lesser’s Lab in Arizona. The oven has now been fixed, and one wafer has been processed and<br />
sent to MIT Lincoln Labs. Simons will direct his contractors to pursue Lesserized CCDs (GMOS South)<br />
and BIV CCDs (GMOS North) on a parallel track. Also, procurement for the <strong>Gemini</strong> South mask cutter<br />
is underway.<br />
There has been very little activity on the GMOS ADCs, either at <strong>Gemini</strong> or HIA. The GMOS CCD<br />
retrofit has been given higher priority. New narrow-band filters for GMOS have been ordered.<br />
FLAMINGOS-2: The Florida Team has been making good progress in integrating FLAMINGOS-2.<br />
The acceptance testing is planned for the end of 2005 or early 2006. Simons plans to decide on a<br />
destination for FLAMINGOS-2 at the next GSC meeting.<br />
NIFS: After the failure of the NIFS HAWAII-2 detector, Rockwell could not promise timely delivery of<br />
another HAWAII-2. Hence, it was decided to switch to a H2RG detector. Extra work is needed based on<br />
this change of detector. Thus, NIFS acceptance testing is now expected in mid 2005. Also, the earliest<br />
that NIFS would be available to community is semester 2006A.<br />
GSAOI: The first cold cycle of GSAOI occurred. Mechanisms were found to have a preload problem.<br />
An H2RG MUX self-destructed due to the known thermal problem. <strong>Gemini</strong> is being offered H2RG<br />
detectors regularly by Rockwell and is trading off excellent performance vs. delivery schedule.<br />
bHROS: <strong>Gemini</strong> recently sent a report to PPARC detailing bHROS deficiencies and proposing to<br />
complete bHROS as soon as possible using mostly <strong>Gemini</strong> resources. This should lead to demonstration<br />
science in 2005B, then community access in 2006A.<br />
GNIRS: New camera lenses for GNIRS’s short cameras are nearing completion at Janos. NOAO and<br />
<strong>Gemini</strong> Staff will install these in mid 2005. New GNIRS filters are on order from Barr. These will be<br />
installed as part of the lens work.<br />
NICI: MKIR is preparing for its next cold test. This test will include the NICI science-grade detectors.<br />
MKIR just received two dichroics from Barr. The pacing item in NICI development is the AO system.<br />
MKIR is still awaiting a deformable mirror (DM) delivery from the University of Hawaii. <strong>Gemini</strong> is<br />
procuring a “back-up” commercial deformable mirror.<br />
Hokupa’a-85: The Hokupa’a-85 run at <strong>Gemini</strong> South in August commenced with a “NICI-style” DM.<br />
This DM delaminated during use at <strong>Gemini</strong> South. The rest of the August run used an old-style Hawaii<br />
DM that did not have adequate stroke, but that was useful for testing interface issues. U. Hawaii then<br />
commenced a rapid DM development and production effort to address the delamination problem. New<br />
DMs were produced by late 2004 and stress tested to prove that delamination was no longer an issue.<br />
The Hokupa’a-85 run at <strong>Gemini</strong> South in January 2005 tested these new DMs. Unfortunately, these DMs<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
2
exhibited major problems during this January 2005 run. Thus, Hokupa’a-85 was not fully commissioned<br />
and did not appear to meet its performance specifications.<br />
3. Call for Proposals for 2005B – Initial Discussion<br />
Puxley reviewed <strong>Gemini</strong>’s suggested parameters for the 2005B Call for Proposals. The offered<br />
instruments and modes have changed very little from 2005A. The primary change is offering<br />
MICHELLE spectroscopy in classical mode. Puxley then stated <strong>Gemini</strong> plans to offer 70% science time<br />
on <strong>Gemini</strong> North and described the uses of the remaining time for commissioning and engineering. One<br />
of the commissioning items is MICHELLE polarimetry. This is being inserted from the GSC’s 2 nd<br />
priority bin because NIFS is not available for commissioning. Wainscoat and Armandroff raised the<br />
issue that MICHELLE is not requested or scheduled much in 2005A. Thus, while neither proposed<br />
stopping this commissioning, it is somewhat questionable unless MICHELLE demand increases. For<br />
<strong>Gemini</strong> South, the principal questionable item is whether Hokupa’a-85 will meet the performance criteria<br />
to be offered in 2005B. A report from the Hokupa’a-85 Team is pending.<br />
Puxley showed the aggregate time distribution. The U.K. and Canada are behind in the aggregate<br />
distribution, despite corrections in total time applied at the previous Operations Working Group. <strong>Gemini</strong><br />
Staff and the U.S. are ahead. Puxley enlightened the committee about his views that the merging<br />
sequence may need to be changed to truly address the imbalance. As the imbalance situation was<br />
corrected at the most recent Operations Working Group meeting, only the total time constraint was<br />
changed. Armandroff identified another issue that may be leading to the imbalance and our inability to<br />
correct in our most recent attempt. The histograms over the observing conditions show that the United<br />
States and <strong>Gemini</strong> Staff submit packages that are better balanced over observing conditions than most<br />
partners, while the U.K. and Canada show a bias toward good conditions in their programs. Thus, the<br />
U.S. and <strong>Gemini</strong> Staff programs may show increased probability of execution, relative to Canada and<br />
U.K., during periods of non-optimal conditions. Discussion ensued on how best to address these factors<br />
in an attempt to correct these imbalances.<br />
4. 2005B Process and Schedule<br />
Puxley described that the 2005A proposal process was quite successful. There were a record number of<br />
proposals. The modified PIT for joint proposals worked quite smoothly. The NOAO-supplied PIT<br />
backend was installed at all NGOs as part of the greater automation and uniformity this semester. There<br />
were many fewer proposal processing issues than in semester 2004B. Everyone seemed pleased by the<br />
2005A improvements.<br />
For 2005B, the PIT will be enhanced to require explicit description of past <strong>Gemini</strong> allocations and what<br />
has transpired with the data. NOAO has developed software to produce formatted PDF files from PIT<br />
that include figures. NOAO gave the software to <strong>Gemini</strong>. Puxley offered to share this with any NGO<br />
and to allow different style sheets for each NGO.<br />
We discussed the fact that occasionally NGOs change the conditions in Joint programs. These really<br />
need to be adjusted to agreed joint conditions at some point. We agreed that whenever there are<br />
discrepant conditions among components of a joint proposal, it needs to be resolved at ITAC by the<br />
ITAC representatives of the partners in question.<br />
We discussed the different notification methodologies about the results of the TAC process by various<br />
NGOs.<br />
5. NGO-<strong>Gemini</strong> Interactions and Metrics<br />
5.1 Metrics<br />
Roy described the status of the NGO metrics. A subcommittee of the Ops Working Group (Roy,<br />
Johnson, Crabtree, Armandroff) has worked on the NGO metrics. The current state of the metrics is<br />
contained in the meeting materials. The subcommittee will meet again to further refine the metrics. The<br />
goal is for the Metrics Subcommittee to complete its work in time to provide an agreed set of metrics by<br />
the August Operations Working Group. The August meeting would then modify or approve the NGO<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
3
Metrics. A final set of agreed metrics will then be presented to the GSC and <strong>Gemini</strong> Board at their<br />
October/November meetings.<br />
5.2 NGO-<strong>Gemini</strong> Communications<br />
These were discussed, with each NGO representative providing his or her perspectives. The key points<br />
and issues to emerge from these discussions are as follows:<br />
• The <strong>Gemini</strong> video training sessions in December were found to be very helpful to and much<br />
appreciated by the NGO participants.<br />
• The NGO-initiated telecons of the OpsWG members are useful and should be continued.<br />
• The visits to the <strong>Gemini</strong> sites for queue observing and training are beneficial, both from a<br />
knowledge perspective and from fostering connections between the <strong>Gemini</strong> and NGO staffs.<br />
• There is continued desire by the NGOs for access to the information on the <strong>Gemini</strong> internal Web<br />
pages.<br />
• The NGOs wish to foster more sharing of ideas and questions between NGO staff members and<br />
their counterparts at <strong>Gemini</strong>. Not all ideas or initiatives need go through the <strong>Gemini</strong> and NGO<br />
leaders.<br />
6. NGO Phase I and Phase II reports<br />
During the NGO reports (see Appendix A), the following items of consensus emerged:<br />
• There is a strong desire that the overheads are made clearer to PIs and represent well the<br />
overheads that are experienced in reality. The stated GMOS advice to budget for a 25%<br />
overhead is an overestimate. It is in the <strong>Gemini</strong> work list to incorporate more realistic overhead<br />
calculations into the ITCs and OT. All agreed that this would solve the overhead problem once<br />
accomplished. The perception of some community members that several of the overheads are<br />
large and non-competitive is a perception problem for <strong>Gemini</strong> and the NGOs.<br />
• Several of the NGOs noted the difficulty of the T-ReCS ITC being non-functional and the<br />
MICHELLE spectroscopic ITC not being implemented. Puxley informed us that the <strong>Gemini</strong><br />
Staff are working on this. There are some coding optimization issues underway currently.<br />
• In response to desires of the GSC, ITAC, and some of the NTACs, <strong>Gemini</strong> will update the PIT to<br />
require listing previous <strong>Gemini</strong> time allocations and what the status of the data is (reduced,<br />
published, etc.).<br />
• <strong>Gemini</strong> has implemented a revised mechanism for the NGOs to mirror the <strong>Gemini</strong> Web site.<br />
This will allow access when the <strong>Gemini</strong> Web site is down or unreachable.<br />
• Several of the NGOs expressed appreciation and strong benefit to users from the OT libraries. It<br />
is helpful to have access to libraries for all instruments within the OT. Puxley informed the<br />
NGOs that <strong>Gemini</strong> is enhancing the prominence and capabilities of libraries within the OT.<br />
• There is strong interest in creating Phase-2 instructions and information for each <strong>Gemini</strong><br />
observing capability that can be accessed/printed with a single mouse click. This is motivated by<br />
allowing PIs to avoid searching multiple locations for this information.<br />
7. Science efficiency and productivity<br />
Puxley presented an analysis of shutter-open efficiency. The numbers are encouraging. There were<br />
several suggestions to publicize these efficiency values to the <strong>Gemini</strong> community via the <strong>Gemini</strong> Web<br />
pages and/or Newsletter.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
4
Puxley is preparing to do an analysis of the queue observing statistics to test for “salami slicing.”<br />
Roy updated the OpsWG on <strong>Gemini</strong> publications. There had been a big increase in the publication<br />
output in December and January. Roy reminded the NGOs to search out papers that do not have the<br />
standard <strong>Gemini</strong> acknowledgment and remind authors to include it. Roy also reviewed a very nice set of<br />
<strong>Gemini</strong> science highlights.<br />
Roy outlined plans for the new <strong>Gemini</strong> Newsletter. The NGO Reports will no longer be a part of the<br />
Newsletter. Emphasis will be placed on high-level scientific summaries of <strong>Gemini</strong> results. One NGO<br />
person will be included as a member of the editorial board; Johnson agreed to fill this position. The<br />
NGOs will be responsible for soliciting scientific articles and delivering them to the Newsletter.<br />
Instrumentation articles are also encouraged.<br />
Day 2: 8 February 2005<br />
8. Reports on semester science operations<br />
The impact of the MICHELLE compensatory time was discussed. The OpsWG expressed concerns about<br />
the consequences of the present compensatory and guaranteed time policy. The present policy may act as<br />
a disincentive for use of new instruments. For example, for the 05A semester, demand for Michelle was<br />
small. There is only one band 1 program (allocated 9 hours) that is not from the UK; there are no band 2<br />
Michelle programs. The band 1 program therefore potentially could be charged 9 + 12 hours<br />
compensatory time, or a total of 21 hours for just 9 hours of science. Such a charge is not reasonable.<br />
Resolution 8.1 – The OpsWG recommends that compensatory time and guaranteed time payments<br />
from 2005A onwards are limited to a maximum rate of 20% of the time charged. This rate should<br />
not be a disincentive for instrument use, yet is a reasonable rate considering the work involved in<br />
producing a new instrument. The OpsWG recommends that payments beyond the 20% rate are<br />
accumulated and accounted separately. On an individual semester basis, the excess accumulated<br />
cost would be borne by the partnership, but the payment of compensation would continue in future<br />
semesters until users have paid all accumulated compensatory time, or the instrument is<br />
decommissioned.<br />
The OpsWG also recommends that future compensatory and guaranteed time agreements are<br />
limited to classical time. Awarding compensatory time in Band 1 queue causes a large change in<br />
national balance in Band 1, requires Band 1 to be made unreasonably large, and reduces the<br />
completion rate of Band 1.<br />
9. Large science campaigns<br />
Jensen gave a detailed presentation about the need to allocate large blocks of time to the scientific<br />
programs which are the main drivers for the new Aspen instruments (e.g., “dark energy” and “galaxy<br />
genesis” programs). He proposed to use the NICI planet-finding program as a ‘path-finder’ in the<br />
development of a new mechanism for allocating time to campaign programs.<br />
The NGO representatives felt that they needed to show this presentation to their national advisory<br />
committees. Armandroff was concerned that there were dangers in building the campaign process around<br />
NICI, since there were uncertainties over its delivery time performance. Certainly, the survey allocation<br />
and plan can be tweaked when the performance is better known. However, if NICI’s performance is<br />
significantly below that expected or is very late, it may no longer be productive to undertake such a<br />
survey.<br />
Resolution 8.2 – The OpsWG recommends that Jensen’s proposal be discussed by the GSC at its<br />
meeting in April. In doing so, it has the following comments/concerns to make/flag:<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
5
• It accepts that the Aspen science goals demand large allocations of telescope time.<br />
• It endorses the top-level principles contained within the proposal:<br />
o Enable Aspen science goals<br />
o Attract the best groups and encourage creativity<br />
o Award telescope time through open competition<br />
o Maintain balanced and inclusive partner participation<br />
o Allow free participation by anyone in the <strong>Gemini</strong> community<br />
o Maintain time for PI science.<br />
• It highlights the following potential concerns:<br />
o The dangers in allocating time outside the normal TAC process<br />
o The need for monitoring survey progress and team formation during the campaign<br />
o The difficulties in getting competitors to work together<br />
o Making sure ‘peripheral’ science is included by enlisting auxiliary team members<br />
o ‘Locking out’ campaign targets to regular PI programs.<br />
10. Long-range instrument deployment and decommissioning plan<br />
The <strong>Gemini</strong> Science Committee (GSC) was asked at its October 2004 meeting to sketch out a future<br />
instrument availability plan that limits the number of instruments to a set that is feasibly supported by<br />
<strong>Observatory</strong> scientific and engineering staff. This was set by the <strong>Observatory</strong> at 4 supported instruments<br />
at each telescope [not including facilities, such as the AO systems] with 2 or fewer instrument changes<br />
per telescope per semester. The GSC devised such a plan through 2007 and presented it in its report.<br />
At this OpsWG meeting, Simons presented an alternative instrument deployment plan. Simons’ plan<br />
resembles the GSC plan in embracing the concept of “core” instruments, yet it has some notable<br />
differences.<br />
• GNIRS moves to <strong>Gemini</strong>-North in 2007,<br />
• Both GMOS-N and GMOS-S, as well as bHROS, are decommissioned in 2007,<br />
• TEXES is made available on <strong>Gemini</strong>-North for two weeks per semester, starting in 2006.<br />
• It extends in time well beyond 2007, into the Aspen instrument era (2008-2011).<br />
The OpsWG discussed the Simons plan extensively and appreciated the opportunity to comment. It<br />
recognizes the need to retire instruments as new ones come on line. It also believes that the scientific<br />
opportunities, technical advantages, and community aspirations need to be considered carefully before<br />
the instrumentation roadmap is finalized. It was agreed that OpsWG members would consult their<br />
national science advisory committees over the GSC and Simon plans before the GSC ‘Aspen retreat’ in<br />
April. It will be important to have the GSC discuss and comment in detail on the Simons plan at the April<br />
GSC meeting.<br />
Resolution 8.3 – The OpsWG is grateful to Doug Simons for his efforts to further develop a longrange<br />
instrument deployment and decommissioning plan for the <strong>Gemini</strong> telescopes. It has the<br />
following comments to make on what is proposed in his plan:<br />
• The proposed retirement of the two GMOS instruments at the end of 2007 is a major<br />
concern because of the very strong community demand for these instruments and the wide<br />
range of science they enable. GMOS makes up the vast majority of some partners’<br />
proposals. The OpsWG considers it essential that <strong>Gemini</strong> retain one of the GMOS<br />
instruments.<br />
• The retention of one of the GMOS instruments requires that some other instrument be<br />
decommissioned at the end of 2007. The OpsWG suggests one of the mid-IR instruments,<br />
either T-ReCS or Michelle. This would maintain mid-IR as well as optical capability on one<br />
of the two <strong>Gemini</strong> telescopes, which the OpsWG views as being vital.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
6
• It strongly endorses the plan to keep an AO-fed, near-IR imaging and spectroscopic<br />
capability on both telescopes.<br />
• It recommends that a minimum of two years notice be given for retiring instruments.<br />
12. Finalization of Call for Proposals for 2005B<br />
A final discussion of the Call proposed by Puxley took place, from which the following resolutions<br />
ensued:<br />
Resolution 8.4 – The OpsWG endorsed the proposal by <strong>Gemini</strong> staff for the capabilities to be<br />
offered on <strong>Gemini</strong>-North and <strong>Gemini</strong>-South in semester 2005B.<br />
Resolution 8.5 – The OpsWG is fully supportive of the HIRES-MICHELLE time exchange with<br />
Keck. However, a significant complication arose in 2005A when it was implemented for the first<br />
time. Keck prepares their telescope schedule before the <strong>Gemini</strong> ITAC meets and hence the <strong>Gemini</strong><br />
HIRES time is scheduled without knowledge of the programs’ lunar phase requirements, the RA<br />
range of its targets, whether the ‘red’ or ‘blue’ arm is required, and what observing dates are<br />
unacceptable to the PIs. The OpsWG recommends that <strong>Gemini</strong> work with Keck to explore means<br />
by which the <strong>Gemini</strong> HIRES time can be scheduled to better meet the needs of the programs<br />
recommended by the <strong>Gemini</strong> ITAC.<br />
Resolution 8.6 – The OpsWG endorsed Puxley’s proposal for dealing with joint proposals which<br />
are ‘discrepant’ due to the individual NTACs/NGOs involved making changes to the proposal, for<br />
example to the specified observing conditions: In future these should be recombined at the pre-<br />
ITAC stage by taking the poorest of the recommended conditions, with the possibility that they are<br />
modified again by ITAC.<br />
Resolution 8.7 – The OpsWG recommends that the NGOs take responsibility for checking<br />
proposals to ensure that the specification of their instrument resource requirements are complete,<br />
and to rectify if need be.<br />
Resolution 8.8 – The OpsWG recommends that it will be the responsibility of the NGOs to enforce<br />
the Phase-II hard deadlines. Programs not received by the second PI deadline will not be accepted<br />
by the NGOs. PIs who miss the deadline and want their program reinstated will be advised by the<br />
NGOs to contact the Associate Directors.<br />
Resolution 8.9 – The OpsWG endorses Puxley’s proposal to address the time-charging /usage<br />
imbalance by automatically applying in each semester a 50% correction to the distribution of time<br />
to each of the partners, and adjusting the merging sequence to the resulting effective partner<br />
shares.<br />
Armandroff alerted the OpsWG to the NOAO software that makes PDF files from the PIT (including<br />
figures), and showed an example. It was agreed that this feature should be incorporated into the PIT and<br />
be customized for each partner country. Armandroff offered to circulate a sample PIT-proposal-derived<br />
PDF file and the related style sheet to OpsWG members.<br />
13. Other items<br />
13.1 <strong>Gemini</strong> Science Archive<br />
Roy gave a progress report on the <strong>Gemini</strong> Science Archive (GSA). New instruments, such as<br />
MICHELLE and GNIRS, are being added to the GSA. Refinements in the interface, such as filter<br />
naming, are taking place. Data distribution via the GSA, with P.I. notification by e-mail, is planned to be<br />
underway soon. A first version is scheduled for testing in May 2005, with a final version by September<br />
2005.<br />
13.2 Another ‘NGO” meeting<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
7
The OpsWG discussed convening another meeting for NGO and <strong>Gemini</strong> Staff for training and<br />
interactions. Armandroff volunteered to host this meeting at NOAO in Tucson. The Organizing<br />
Committee will be Armandroff, Cote, Francis, and a UK member to be named later. The dates would be<br />
November 29 and 30, with ITAC occurring in Tucson on December 1.<br />
13.3 IQ and seeing monitor on Cerro Pachon<br />
Puxley reported that the seeing monitor (DIMM) at CP was now automated and producing<br />
measurements. While not all the measurements could be explained, in particular comparisons with seeing<br />
measurements made with instruments on the <strong>Gemini</strong>-South telescope, the DIMM seeing measurements<br />
were nonetheless being used as the basis for running the queue. It was also reported that further work is<br />
still require before a seeing monitor is installed at <strong>Gemini</strong>-North, where it will be installed on the<br />
emergency staircase for the telescope dome.<br />
13.4 GMOS mask definition from non-GMOS images<br />
The UK NGO has agreed to tackle this problem, working with scripts that Michael Ledlow had<br />
developed.<br />
13.5 Mirroring the <strong>Gemini</strong> website<br />
A new, ‘secure’ method of doing this has been developed by IT staff at <strong>Gemini</strong>. Instructions on<br />
how to do this are to be sent to the NGOs shortly<br />
14. Next OpsWG meeting<br />
This will be hosted by the UK NGO in Oxford, and held on 8-9 August 2005.<br />
Appendix A – Reports from the National <strong>Gemini</strong> Offices<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
8
Argentinean <strong>Gemini</strong> Office Report<br />
Submitted by Guillermo Bosch<br />
o/subs rate<br />
Applied: 4 proposals (3 GMOS + 1 NIRI) to <strong>Gemini</strong> North (33.27 hours) 1.4<br />
4 proposals (3 GMOS + 1 T-ReCS) to <strong>Gemini</strong> South (31.1 hours) 1.16<br />
From our NTAC: 4 proposals (3 GMOS + 1 NIRI) to <strong>Gemini</strong> North (24.5 hours) 1<br />
4 proposals (3 GMOS + 1 T-ReCS) to <strong>Gemini</strong> South (27.9 hours) 1<br />
From ITAC: 3 proposals (3 GMOS) to <strong>Gemini</strong> North (14.8 hours) 0.6<br />
3 proposals (2 GMOS + 1 T-ReCS) to <strong>Gemini</strong> South (22.1 hours) 0.82<br />
Phase II experience (2004B and 2005A so far…)<br />
2004B was our first complete run since observing database was implemented.<br />
• One program did not complete their phaseII at all (PI claims didn´t know time had been<br />
awarded…)<br />
• Another (Band 4) program was completed late due to similar communication problems.<br />
Research group changed contact address and phase II was completed.<br />
• Remaining programs, several of them including GMOS pre-imaging were completed on<br />
time (or not too late)<br />
2005A strong deadline is already showing its effect, as everyone is trying to make it before<br />
Feb.10 th .<br />
• NGO reviewers did not receive a copy of emails sent to PIs as in 2004B. We found that<br />
useful in previous semester.<br />
Users comments/questions:<br />
• Mask design software is not too friendly, particularly when PIs found at the last step that<br />
pixscale had to be changed and start over again…<br />
• Is there a way of producing a printout of the whole program? Or another method that<br />
helps an overall check of the program?<br />
• Could it be possible to “import” phaseI xml file to the OT in order to check for issues<br />
that turn out to be important during phaseII preparation (such as availability of OIWFS<br />
for dithering or offsets)?<br />
Other issues<br />
• New Argentinean <strong>Gemini</strong> Scientist (Rubén Diaz, OAC)<br />
• New NGO staff member (Carlos Saffe, OAC)<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
9
Australia <strong>Gemini</strong> Office Report<br />
Submitted by Warrick Couch<br />
Phase 1:<br />
The 2005A semester proposal round for <strong>Gemini</strong> telescope time was a strong improvement<br />
compared to the low demand we have experienced in previous “A” semesters. Australia received<br />
a total of 22 proposals for 2005A: 9 for <strong>Gemini</strong>-North, 12 for <strong>Gemini</strong>-South and 1 for Keck<br />
(HIRES). Ten of these were “joint” proposals and 2 requested time in the classical mode<br />
(excluding the Keck/HIRES proposal). Not surprisingly the GMOS instruments were again the<br />
most popular, garnering 8 applications for time on GN and 7 for GS. Once again there were no<br />
proposals received for the MICHELLE mid-infrared imager and spectrometer.<br />
The oversubscription rates were 1.23 for GN and 2.02 for GS. The combined oversubscription<br />
rate was 1.60. Details of the 22 proposals received are summarized in the following two tables:<br />
AustralianTime<br />
Requested (hrs.)<br />
Telescope<br />
GMOS<br />
North<br />
GMOS<br />
South<br />
GNIRS<br />
Keck/<br />
HIRES<br />
NIR<br />
I<br />
NIRI-<br />
Altair Phoenix T-ReCS<br />
<strong>Gemini</strong> North 55.25 (12.0) 18.0 4.0 77.25<br />
Tot. <strong>Gemini</strong><br />
Time (hrs.)<br />
<strong>Gemini</strong> South 91.82 8.50 5.0 9.75 115.07<br />
Grand Total 55.25 91.82 8.50 (12.0) 18.0 4.0 5.0 9.75 192.32<br />
# of Proposals<br />
Telescope<br />
GMOS<br />
North<br />
GMOS<br />
South<br />
GNIRS<br />
Keck/<br />
HIRES<br />
NIRI<br />
NIRI-<br />
Altair Phoenix T-ReCS Total<br />
<strong>Gemini</strong> North 6.5 1 1 1 9.5<br />
<strong>Gemini</strong> South 8.5 2 1 1 12.5<br />
Grand Total 6.5 8.5 2 1 1 1 1 1 22<br />
The TAC process and packaging of the results to send to <strong>Gemini</strong> went very smoothly this past<br />
semester. The AusGO was the first national office to submit the completed TAC results on to<br />
<strong>Gemini</strong> headquarters in Hilo.<br />
The PIT proposal submission software continued to work in a stable fashion with only some<br />
minor “hiccups”.<br />
As in earlier semesters, the need for forthcoming results from previous allocations of <strong>Gemini</strong><br />
time was an important factor during the TAC process. For the 2005A semester, the TAC<br />
deliberations resulted in 20 proposals being forwarded to <strong>Gemini</strong>.<br />
Phase II<br />
Based on current reports, about half of the Phase IIs were submitted by the early deadline. Phase<br />
II proceeded quite smoothly, with an average of ~2 iterations between observer and NGO<br />
support scientist to get programs ready for submission to <strong>Gemini</strong>. After programs were<br />
submitted 'for activation', response from <strong>Gemini</strong> was generally found to be quick and thorough.<br />
The OT was relatively bug free in general. The documentation was generally considered<br />
adequate and the OT examples were highly praised (though there’s room for more of them!).<br />
Some troubles were reported with finding information on the <strong>Gemini</strong> web pages – the<br />
information was there, but hard to find and dispersed over many pages.<br />
General News:<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
10
1. Paul Francis has taken over from Warrick Couch as Australian <strong>Gemini</strong> Project Scientist. The<br />
office is thus nominally now at Mt Stromlo <strong>Observatory</strong>, though the workload is as dispersed<br />
around Australia as ever – and mostly being done by the same people.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
11
Brazil <strong>Gemini</strong> Office Report<br />
Submitted by Max Abans<br />
1 – Brazilian Proposals 2005A<br />
1.1 – Phase I and Phase II<br />
As for the submitted proposals for Semester 2005A, a total of 33.32 hours at <strong>Gemini</strong> North have<br />
been requested, representing an oversubscription of 1.33. For <strong>Gemini</strong> South, 51.44 hours have<br />
been requested, resulting in an oversubscription of 1.84. Table 1 displays the final allocated<br />
time schedule for the Brazilian proposals after ITAC evaluation.<br />
Table 1: Phase I/II – Brazilian 2005A – Final Telescope Time Allocation<br />
Requested Time Allocated Time<br />
Instrument Proposals<br />
[hours]<br />
[hours]<br />
GMOS North 7 32.07 23.82<br />
GMOS South 8 28.60 14.04<br />
GNIRS 3 12.84 7.9<br />
Michelle 1 1.25 0.0<br />
Phoenix 1 5.0 5.0<br />
T-ReCS 2 5.0 0.0<br />
Total 22 84.76 50.76<br />
1.2 – Suggestions for the improvement of Phase I–II processes<br />
In the last two OpsWG meetings, at Waikoloa and Sydney, I highlighted that we have realized<br />
that, in some occasions, that proposals approved by the NTAC suffer from some typically<br />
technical problems as described below (e.g. based on the GMOS experience):<br />
(1) The target is in a field lacking suitable bright guiding stars (OIWFS stars).<br />
(2) The only suitable guiding star is so far, that it compromises the science observations with<br />
longslit and IFU.<br />
(3) The suitable OIWFS star compromises the longslit angle position.<br />
Our colleague, Mariângela de Oliveira-Abans, also raised this issue in the NGO meeting in<br />
Victoria, Canada.<br />
Then again, we strongly recommend the implementation of the "field tool" of the OT into the<br />
PIT for the next semester. This will help PIs to improve their proposals and facilitate the NTAC<br />
members’ work by allowing them to check the technical viability of executing the projects "right<br />
from the start".<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
12
2 – Brazilian Questions<br />
I would like to submit some issues for appreciation, which we wish that could be taken into<br />
account. As a small partner, we would like that the Ops. WG derived some resolutions about<br />
them, when applicable.<br />
1. Let us examine closely the change of the size of Band 1 and the elimination of Band 4.<br />
2- Let us spend a few minutes discussing about Band 1 programs: what is the executed<br />
percentage? What about the data quality?<br />
3- Again we ask the following: <strong>Gemini</strong> keeps careful track of the telescope time used. The<br />
Brazilian community thinks it should be possible to have, at the end of each semester, a short<br />
and compact report on each program, highlighting the following points:<br />
The overall conditions of the completely executed programs (e.g. quality data, weather<br />
conditions, seeing)<br />
For the partially executed programs, the reasons for this partiality: (i) weather conditions, (ii)<br />
instrumental failure, (iii) problems with the program itself, (iv) queue order, to mention a<br />
few. NOTE: Point (iii) is important to find out how well the NGOs, NTACs and contact<br />
scientists have been working.<br />
Not executed programs: the reasons why!<br />
3 – Brazilian <strong>Gemini</strong> Support<br />
3.1 – Training<br />
As NGO, we continue to successfully provide the Brazilian <strong>Gemini</strong> community with instrument<br />
support. However, to improve our efficiency even more, the Brazilian NGO is still trying to<br />
manage to establish a program that envisages its staff training at the <strong>Gemini</strong> facilities during<br />
Phases II processes in 2005.<br />
As a small partner, we define our participation in the support/training at <strong>Gemini</strong> from now on as<br />
“Phase II-Support”. That means we wish to concentrate the efforts to improve our expertise to<br />
support Phase II. We are also interested in running “queue runs”, but we do not have enough<br />
personnel for those duties at the present time.<br />
4 – <strong>Gemini</strong> Public Information and Outreach Network<br />
The Brazilian NGO has had the opportunity to intensify the outreach activities and as such bring<br />
<strong>Gemini</strong> closer to the public attention. Brazilian <strong>Gemini</strong> results and other <strong>Gemini</strong> highlights have<br />
been widely presented in about eight major national events during the second semester. Several<br />
talks, congresses and fairs, videoconferences, open-door events and star parties reached about<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
13
19,000 people throughout Brazil. School children, teachers and senior citizens are still important<br />
targets.<br />
Two events deserve special attention:<br />
a) the workshop entitled “Science with <strong>Gemini</strong> and SOAR Telescopes”, sponsored by the<br />
Brazilian Instituto do Milênio MEGALIT on the science already made and yet to be made with<br />
those telescopes as well as the related outreach activities. It took place at the IAG-USP, São<br />
Paulo, from December 6 to 9, 2005. MEGALIT has supported the distribution of 10,000 CD-R<br />
with hypertexts and slide presentations to 6,000 schools of which students participated in the<br />
Brazilian Astronomy Olympiad; the Brazilian NGO has contributed with a presentation which<br />
presents the <strong>Gemini</strong> <strong>Observatory</strong>.<br />
b) the VIII Brazilian Workshop on Teaching of Astronomy, where Mariângela presented<br />
<strong>Gemini</strong>'s StarTeachers, Family ASTRO and Journey Through the Universe programs at a round<br />
table for Brazilian astronomers and experts in education as examples of well-succeeded<br />
initiatives in other countries.<br />
5 – The Mask-cutting machine<br />
The Third Amendment to the <strong>Gemini</strong> Agreement has been signed by the Brazilian Minister of<br />
Science and Technology and now become effective. This means it could start the process of<br />
purchasing the Mask Cutting Machine, foreseen as payment, on behalf of Brazil, of the financial<br />
obligations arising from the Third Amendment. The mask cutting machine shall be located at<br />
the precincts of <strong>Gemini</strong> South at Cerro Pachon, in Chile. The <strong>Gemini</strong> Directorate shall define the<br />
specifications for the mask cutting machine and identify, in collaboration with the Brazilian<br />
National <strong>Gemini</strong> Office a provider for the machine. <strong>Gemini</strong> shall consult SOAR before<br />
specifying the machine in order to assure that it can also be used for cutting masks for SOAR´s<br />
Goodman Spectrograph.<br />
6 – The next-generation <strong>Gemini</strong> instrumentation<br />
The Brazilian community continues the discussion about the new instrumentation for the <strong>Gemini</strong><br />
<strong>Observatory</strong>; the cost, the science and how it should be used by the community are a concern.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
14
Canadian <strong>Gemini</strong> Office Report<br />
Submitted by Dennis Crabtree<br />
Canadian response to the 2005A Call for Proposals was gratifying. The details of the 50<br />
proposals received are included in the following two tables. The subscription rate on <strong>Gemini</strong>-<br />
South was significantly lower than that for <strong>Gemini</strong>-North (1.4 vs. 3.4). The combined<br />
subscription rate was 2.4. There were no major issues during Phase I which ran quite smoothly.<br />
Canadian Time<br />
Requested (hours)<br />
Telescope<br />
AcqCam<br />
GMOS<br />
North<br />
GMOS<br />
South GNIRS HIRES Michelle NIRI NIRI-Altair Phoenix T-ReCS Total<br />
<strong>Gemini</strong> North 230.35 33 10 270.2 173.5 543.55<br />
<strong>Gemini</strong> South 20 160.44 14 40 13.95 248.39<br />
Grand Total 20 230.35 160.44 14 33 10 270.2 173.5 40 13.95 791.94<br />
# of Proposals<br />
Telescope<br />
AcqCam<br />
GMOS<br />
North<br />
GMOS<br />
South GNIRS HIRES Michelle NIRI NIRI-Altair Phoenix T-ReCS Total<br />
<strong>Gemini</strong> North 13 2 1 7 6 29<br />
<strong>Gemini</strong> South 1 14 1 2 3 21<br />
Grand Total 1 13 14 1 2 1 7 6 2 3 50<br />
The TAC process and packaging of the results to send to <strong>Gemini</strong> went well this past semester.<br />
The scheduling of the Keck time turned out to be very problematic. Keck had already scheduled<br />
the “<strong>Gemini</strong> slots” into their schedule before <strong>Gemini</strong>’s ITAC met. Two Canadian proposals<br />
were granted a total of 3 nights (2.5 and 0.5 nights) of Keck time but the <strong>Gemini</strong> slot conflicted<br />
with conference travel for the primary PI and was too bright to achieve the science of the<br />
primary program. After much iteration the time was split into two 1.5 night blocks. Thanks to<br />
Barbara Schaefer at Keck for being so flexible! We need to think the time exchange with Keck<br />
through a bit more and see if we can avoid this type of issue in the future.<br />
The Phase II process has gone fairly smoothly this semester. PIs are obviously reading the<br />
information on the Web and even first time users are getting a lot of Phase II aspects correct.<br />
The Mid-Term Review of the Canadian LRP has been released and is available at:<br />
http://www.casca.ca/lrp/mtr_approved.pdf. The MTR gives <strong>Gemini</strong> the highest priority for<br />
ongoing operations support and endorse the Aspen instrumentation program.<br />
The CGO published <strong>Gemini</strong> updates in the September and December newsletters of the<br />
Canadian Astronomical Society.<br />
The CGO worked with the Royal Astronomical Society of Canada (main amateur group) to<br />
distribute a copy of the <strong>Gemini</strong> CD to their 5000+ members.<br />
The CGO and Canadian <strong>Gemini</strong> Scientist ran an imaging contest for Canadian amateur<br />
astronomers. One hour of imaging time was available on each of <strong>Gemini</strong> and CFHT. The plan is<br />
to present the winning clubs with their images at the CASCA meeting in Montreal in May.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
15
Chile <strong>Gemini</strong> Office Report<br />
Submitted by Sebastian Lopez<br />
Phase I:<br />
The Chilean 2005A proposal deadline was on October 1st, and the statistics were:<br />
Time requested GMOS-S: 164.9 h in 8 proposals<br />
Time requested T-ReCS: 11.0 h in 1 proposal<br />
Time requested GNIRS: 21.5 h in 1 proposal<br />
Time requested Phoenix: 35.0 h in 1 proposal<br />
Time requested Acqu: 21.5 h in 1 proposal<br />
Total 254.4 h in 12 proposals<br />
Subscription factor = 1.8<br />
Out of these 12 proposals, 4 are joint proposals: CH+BR+US+AU (Phoenix),<br />
CH+CA, (GMOS-S), CH+UK+US (GMOS-S), CH+BR (T-ReCS).<br />
The proposal statistics shows a subscription factor of 1.8 with GMOS-S further being the most<br />
requested instrument. A novelty in this semester was the relatively high number (4) of joint<br />
proposals.<br />
Upon <strong>Gemini</strong> suggestion the submission mechanism was changed from simple e-mail to PIT<br />
submission and the first Chilean phase I in this new mode went smoothly.<br />
Pre-TAC technical assessment was done (in general I see carefully prepared proposals in there<br />
technical part) and the TAC finally ranked 7 proposals. Total awarded time was 141.7 hours. Of<br />
these, 4 are GMOS-S programs (1 of them Joint program), 1 GNIRS, and 1 Phoenix (Joint<br />
program). There are 5 nights (35%) allocated for classical programs with Chilean participation.<br />
Phase II:<br />
Phase II has gone smoothly. There has been a good interaction with PIs. The instrument<br />
information on the webpages has become much clearer, which speeds up the process at this<br />
NGO. My load of work was lightened by M. Bergmann at <strong>Gemini</strong> who assumed motu proprio<br />
the check of one GMOS program directly.<br />
None of the (queue) Chilean programs had submission delays in Phase II.<br />
Issues:<br />
I could not attend one of the December training sessions (on GNIRS) because we could not<br />
connect to the BCNet MCU in Vancouver, although we apparently had registered in advance.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
16
United Kingdom <strong>Gemini</strong> Office Report<br />
Submitted by Rachel Johnson<br />
Phase I<br />
For the 2005A proposal round the UK received 82 proposals for 1728 hours - 51 proposals and<br />
1129.1 hours in the North, 28 proposals and 552 hours in the South, 2 proposals for North &<br />
South for 43 hours and 1 HIRES proposals for 4 hours.<br />
The split by instruments is given in the following table:<br />
<strong>Gemini</strong> North<br />
<strong>Gemini</strong> South<br />
# props hours # props hours<br />
GMOS-N 23 419 GMOS-S 20 387<br />
NIRI 16 398 GNIRS 7 95<br />
NIRI+Altair 3 38 T-ReCS 3 87<br />
Michelle 13 290 Phoenix 1 10<br />
total 55 1145 31 579<br />
Other<br />
HIRES 1 4<br />
Note that this table includes 5 proposals for 2 instruments. The times above are uncorrected<br />
for wrongly estimated overheads.<br />
The time available to the UK in 2005A is 304 hours in the North and 295 hours in the South,<br />
giving a total oversubscription of 2.9, 3.8 in the North and 2 in the South. For comparison<br />
oversubscription in 2004B was 2.5(N) and 2.6(S) and for 2004A it was 3.5(N) and 1.1 (S).<br />
46 proposals (the two proposals for North and South were both split) for 686.9 hours were<br />
forwarded to the ITAC of which 39 for 561 hours were included in the queue. Additionally 2<br />
proposals for 22 hours of Michelle Compensation Time were forwarded to ITAC. At the ITAC<br />
another 10 hours of Michelle CT was added to one of these, a joint proposal, as the US part of<br />
the time was not forwarded.<br />
Long term status was awarded for the Michelle compensation time proposals, for 12 hours in<br />
05B, 14 hours in 06A and 4 hours in 06B. The PIs will submit an update + their original<br />
proposal via the PIT for the upcoming semesters. These will go through the Phase-1 and Phase-2<br />
process as normal.<br />
The Phase-I process was smoother than 2004B and the PIWI worked well. The bug in PIT<br />
caused by submission without a partner country affected 2 UK submissions before the NGOs<br />
were notified of the workaround.<br />
Phase-I questions and suggestions:<br />
• No-one in the UK applied for the 90%ile or ‘any’ cloud cover bins, even though it was<br />
suggested to PI’s that they include in the technical case ways that (a subset of) their<br />
science goals could be obtained with worse observing conditions (nobody did). Could<br />
this problem be alleviated by changing the cloud cover bin boundaries (eg having a<br />
boundary at 1 mag extinction) ?<br />
• The GMOS 75% efficiency in Phase-I severely underestimates the efficiency as<br />
calculated in Phase-II for many GMOS programs (Dennis made this point in the last<br />
OpsWG) e.g. long (30min) exposures with MOS or IFU have efficiency more like 90%.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
17
This leads to some proposals getting more time than they need, and therefore to some<br />
getting none.<br />
• In PIT, if no partners are selected this should generate a fatal error.<br />
From the UK TAC:<br />
• Are classical programs still actively encouraged ?<br />
• The UK would like to offer long term status for all instruments.<br />
• Could there be a place in the PIT asking if the proposal has been submitted to other<br />
observatories for that round.<br />
Phase II<br />
The Phase-II process was generally smooth.<br />
The OT databases were down for several days to test the new OT. This caused problems for<br />
some programs (eg Isobel’s) who use the OT to check the status of their observations, and who<br />
needed to make updates during this time. The OT database was also down 23-26 November<br />
without any information on the web site. The OT was released some days after the originally<br />
planned date (10 th not 1st Dec). The bug and re-release of the OT did not cause problems for any<br />
UK PIs.<br />
The training sessions on mid-IR and GNIRS were useful as was the ‘what’s new for this<br />
semester’ section of the Phase-II.<br />
We received about half of the Phase-II for the first deadline.<br />
Phase-II questions and suggestions:<br />
• Is there any way to have a parallel OT database whilst the new OT is being checked.<br />
• The classical deadline is ‘2 weeks before the block in which your observations are<br />
scheduled’. PI’s seem to read this as ‘2 weeks before my run’. We find this a bit short.<br />
Could we change it to ‘3 weeks before your run’ ?<br />
Other news from the UK<br />
The second UK 8mUG meeting was held in September 2004 with much useful discussion which<br />
fed into the October GSC meeting. The next meeting is planned for March 2005. UKNGO staff<br />
have been on 4 support runs and 2 training runs in 2004B. Ilona S¨ochting did 2 of these support<br />
runs whilst on a long term visit to <strong>Gemini</strong>-S during Dec04-Jan05, which she found very useful<br />
and enjoyable. During her stay she created a GMOS Phase-II cookbook, and started to look at<br />
GMOS mask making without GMOS pre-imaging.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
18
University of Hawaii <strong>Gemini</strong> Office Report<br />
Submitted by Richard Wainscoat<br />
Phase 1:<br />
No major problems were experienced. Proposals were initially accepted on the UH form, and<br />
successful proposals transferred into the Phase I Tool. For the first time, proposals were also<br />
accepted directly from the Phase I Tool. Only one proposal was submitted in this manner – the<br />
single joint proposal – for which this was the only method of submission possible. The PIT<br />
proposal acceptance software was installed fairly smoothly, but documentation of the software is<br />
a little scarce. The software doesn’t seem to be getting much maintenance or support – some<br />
attention to this may be necessary in the future.<br />
Proposal statistics were:<br />
GMOS-N: 6 queue proposals – 34.2 hours; 2 classical proposals – 4 nights<br />
NIRI: 1 classical proposal – 2 nights<br />
NIRI/Altair: 1 queue proposal – 11 hours; 1 classical proposal – 2 nights<br />
Michelle: 1 queue proposal – 9 hours<br />
The UH TAC also examined proposals for Keck and Subaru to determine whether any of these<br />
would be better done on <strong>Gemini</strong>.<br />
Total time requested was 134.2 hours, available was 122 hours, and the oversubscription factor<br />
was 1.1. The low oversubscription is probably a reaction to the high oversubscription by UH of<br />
<strong>Gemini</strong> in 2004B – unsuccessful applicants last semester sought observing time elsewhere. UH<br />
oversubscription was high in 2004B partly as a result of a fairly large accounting correction<br />
applied that semester.<br />
The Time Allocation Committee moved one proposal for classical time to Subaru, and made<br />
other changes to requests, allocating 9.2 hours to 10 proposals. The remaining 30 hours were<br />
scheduled as 3 nights of UH Director’s Time. The Time Allocation Committee changed small<br />
requests for classical observing<br />
In 04B, a substantial fraction of UH proposals were joint proposals with other agencies. In 05A,<br />
only one proposal was a joint proposal. This may also partially explain the fluctuation in<br />
oversubscription. A contributing factor to the fluctuation is likely that one of the stronger joint<br />
collaborations is in the area of star formation, which is better observed in the “B” semester in the<br />
north.<br />
UH was ready to submit its Phase I proposals on October 29. This was before <strong>Gemini</strong> was ready<br />
to accept them. The UH TAC meets earlier than most other agencies, because we must meet a<br />
deadline to provide our proposals to Keck by approximately Nov 1 (or May 1). This means that<br />
UH allocations can be ready much earlier than the typical <strong>Gemini</strong> deadline for PIT proposal<br />
submission. This semester, early submission was necessary because of an overseas trip by<br />
Richard Wainscoat. The changes from sftp to ftp caused some confusion – hopefully the<br />
proposal submission mechanism can be stabilized.<br />
Technical reviews of Canadian, UK, and Australian Keck HIRES proposals were performed.<br />
The HIRES proposals were in general technically sound. Several proposals requested rather<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
19
short “queue style” amounts of time – not appropriate for classically scheduled observing. More<br />
careful identification of the nights that will be scheduled on Keck, and adherence by the ITAC to<br />
that schedule appears to be essential to the successful future of this program.<br />
Phase II:<br />
No major problems were experienced. Errors were fairly typical; some users are becoming<br />
better; a few have been somewhat sloppy making careless mistakes.<br />
The new hard deadline is a big improvement. It allows the review of the Phase II programs to<br />
be focused in a short period of time, rather than dragging out indefinitely in a disruptive manner.<br />
All UH applicants were asked to complete their Phase II programs early – no later than 1 week<br />
after the early deadline. I took his approach because of the timing of the OpsWG meeting and<br />
my consequent travel to this meeting.<br />
As of February 2, all but 2 UH queue programs are “Ready,” or close to ready. Both programs<br />
that are still at “Phase 2” are from the same recalcitrant PI who has been warned many times<br />
about the hard deadline; he argues that his target is later in the semester, so it cannot be observed<br />
right now.<br />
Some further discussion by the OpsWG of the meaning of the Phase II deadline would be useful.<br />
The hard deadline was suggested by the GSC, and has not yet been discussed by the OpsWG. I<br />
worry that a PI can wait until February 10, and then slap together something that has a lot of<br />
problems, yet still technically meets the deadline. This could put unnecessary pressure on the<br />
NGO to ready the proposal in the next week.<br />
It is still hard to find information on the <strong>Gemini</strong> web pages, and hard to navigate them . For<br />
mature instruments, such as GMOS, it would be helpful if a printed manual (e.g., PDF format)<br />
could be produced.<br />
Other issues:<br />
Richard Wainscoat is presently the sole person at UH responsible for NGO duties. I expect that<br />
UH will hire a new support astronomer to replace Andrew Pickles, and that this person will take<br />
on some of the <strong>Gemini</strong> NGO workload.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
20
US <strong>Gemini</strong> Office Report<br />
Submitted by Taft Armandroff<br />
Phase I:<br />
The NOAO <strong>Gemini</strong> Science Center (NGSC) saw enthusiastic demand from the U.S. community<br />
for <strong>Gemini</strong> observing time for semester 2005A. One hundred twenty proposals were received<br />
for <strong>Gemini</strong> North: 60 for GMOS-North, 35 for NIRI alone, 12 for NIRI with the Altair adaptive<br />
optics system, and 22 for Michelle. One hundred fourteen U.S. proposals requested <strong>Gemini</strong><br />
South: 39 for GNIRS, 34 for GMOS-South, 24 for Phoenix, 23 for T-ReCS, and 1 for the<br />
Acquisition Camera. In total, 217 U.S. <strong>Gemini</strong> proposals sought 475 nights on the two <strong>Gemini</strong><br />
telescopes. The numbers of U.S. <strong>Gemini</strong> proposals and nights requested represent record highs.<br />
The oversubscription factors of 5.1 at <strong>Gemini</strong> North and 4.2 at <strong>Gemini</strong> South demonstrate<br />
healthy community engagement.<br />
The demand for Keck observing time on HIRES, as part of the <strong>Gemini</strong> time trade, is not<br />
included in the above statistics. The reason for this omission is the fact that NOAO has offered<br />
a modest amount Keck time to the U.S. community based on the Telescope System<br />
Instrumentation Program (TSIP). Thus, NOAO fulfils U.S. requests for Keck HIRES time via<br />
both the TSIP nights and the <strong>Gemini</strong> time-trade nights. In total, 7 Keck HIRES proposals were<br />
received for semester 2005A, requesting a total of 11.5 nights.<br />
The NOAO Telescope Time Allocation Committee (TAC) reviewed the proposals, and the<br />
NGSC Staff performed technical assessments. The 92 most highly ranked proposals were<br />
forwarded to <strong>Gemini</strong> for ITAC review. Thirteen approved U.S. <strong>Gemini</strong> programs requested<br />
classical observing and were scheduled in this mode. One U.S. Keck HIRES program was<br />
scheduled using the <strong>Gemini</strong> time-trade arrangement.<br />
The Phase I process ran smoothly in the U.S. However, a few issues arose during Phase I.<br />
These are listed in the spirit of improvement for next semester:<br />
• The lack of a <strong>Gemini</strong> integration time calculator (ITC) for Michelle in spectroscopy<br />
mode was a problem for both proposers and NGSC Staff performing technical reviews.<br />
An ITC is provided for Michelle in imaging mode. NGSC Staff recommend that the<br />
Michelle ITC be generalized to include all spectroscopy modes to be offered in semester<br />
2005B.<br />
• The T-ReCS ITC was taken off-line in September 2004 (because of problems with the<br />
calculations). While we support the decision to take the ITC off-line for “repair,” the<br />
length of time that the ITC has been unavailable has negatively impacted Phase I and II<br />
for 2005A. The U.S. strongly recommends making the updated T-ReCS ITC available<br />
before/at the release of the 2005B Call for Proposals.<br />
• The U.S. TAC wishes to see the PIT enhanced so that it contains explicit mention of the<br />
proposers’ previous <strong>Gemini</strong> time allocations and a description of whether the data has<br />
been published and/or analyzed. The NOAO proposal form contains a section where the<br />
proposer must list and explain previous time allocations, and this could serve as an<br />
example for PIT. Such an addition to PIT was discussed and supported at the October<br />
2004 GSC meeting and the 2005A ITAC meeting.<br />
• The <strong>Gemini</strong> Web pages continue to be an issue. We applaud the recent update of some<br />
of the pages (e.g., GNIRS). However, too many of the instrument Web pages are out of<br />
date, and too many policy and/or procedure changes that have occurred during the past<br />
few years are not yet reflected on the Web pages. The NOAO Users’ Committee<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
21
ecently criticized the <strong>Gemini</strong> Web pages, citing outdated information and difficulty in<br />
finding information required to submit proper Phase I and II programs. One of the<br />
contributors to user dissatisfaction with the <strong>Gemini</strong> Web pages is the lack of consistency<br />
between instruments in how important information is presented. An example of this<br />
inconsistency is the occasional “burying” of important information required for a proper<br />
Phase II in the “Hot News” or other less mainstream pages.<br />
• As regards the <strong>Gemini</strong> Web deficiencies described above, NGSC suggests that the<br />
Operations Working Group develop a process to involve the NGO Staff in identifying<br />
issues with the Web pages, contributing to solving any deficiencies, and reviewing drafts<br />
of Web page updates.<br />
• The mechanism that allows the NGOs to mirror the <strong>Gemini</strong> Web pages has been taken<br />
out of service due to security concerns. We had asked that it be reinstated in a more<br />
secure form. Thus, whenever the <strong>Gemini</strong> Web server is down, there is no alternate Web<br />
site(s) to allow access to any of the useful <strong>Gemini</strong> Web information.<br />
Phase II:<br />
NGSC staff performed Phase II review, and related proposer interactions, for U.S. proposals.<br />
NGSC reminded all U.S. P.I.s (on December 22 and January 30) of the Phase II deadlines, their<br />
great importance, and the help available to them through NGSC. Individual NGSC contact<br />
scientists also sent individualized reminders and offers of Phase II assistance to the investigators<br />
they had been assigned. For 2005A, the Phase II checking and related P.I. interactions are going<br />
well. Before or at the early-in-semester P.I. Phase II deadline (January 12), 14 U.S. programs<br />
had submitted targets to NGSC. By the corresponding NGO deadline (end of January 21),<br />
NGSC had worked with all of these P.I.s and forwarded 19 Phase II programs to <strong>Gemini</strong> (the<br />
number sent is larger than the number received by the P.I. deadline because we were able to<br />
check/interact/fix some programs that arrived after the P.I. deadline).<br />
The following difficulties or inefficiencies arose during the 2005A Phase II process to date.<br />
These are given in the spirit of continuously improving the Phase II process, to the benefit of the<br />
<strong>Gemini</strong> communities. We appreciate the fact that some of our suggestions from the last such<br />
report have been implemented.<br />
• NGSC Staff recommend that the Observing Tool (OT) be enhanced to contain a selfchecking<br />
capability. A check button should be added that would perform straightforward<br />
mechanical checks: for example, checks of the targets in the Phase I vs. Phase II<br />
proposals, checks of the observing conditions granted vs. those contained in the Phase II,<br />
missing “observe” command, etc. This would greatly reduce the time required to<br />
complete a Phase II check and increase checking accuracy, benefiting <strong>Gemini</strong> and the<br />
NGOs. It could also allow P.I.s to do some self-checking before submission.<br />
• NGSC Staff recommend that the OT enable NGO staff to highlight and fetch multiple<br />
programs with a single fetch from the database.<br />
• NGSC has been advising U.S. P.I.s to use the OT libraries. This often strongly increases<br />
the P.I.’s ability to complete their Phase II without major errors. NGSC Staff<br />
recommend that the OT libraries be easily available within the OT for all instruments. It<br />
is also important for <strong>Gemini</strong> to check the OT libraries each semester to insure that they<br />
do not contain errors / procedural violations. If the rules for the upcoming semester are<br />
well defined, the NGOs could help check whether the OT libraries are completely in<br />
compliance before Phase II commences.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
22
• The Phase II skeletons, based on the Phase I submission, that are the starting point for<br />
P.I.s, should be modified to be closer to what we are requesting the P.I.s to submit.<br />
• NGSC continues to receive P.I. feedback advocating for GMOS mask making from preexisting<br />
images or astrometry of sufficient accuracy (i.e., not requiring GMOS preimaging).<br />
This would certainly simplify the process of securing GMOS multi-object<br />
spectroscopy.<br />
• NGSC carefully tracks the status of each U.S. Phase II program. The Interactive<br />
Observing Database Snapshot page<br />
(http://www.gemini.edu/sciops/schedules/obsStatus/ODBConfigGS05A.html) has aided<br />
this tracking significantly, and NGSC appreciates this innovation. One deficiency of this<br />
page is that the status is updated only once per day. It would be helpful if this page were<br />
updated with a more rapid cadence. One suggestion is to update the page with the same<br />
cadence as the “Execution Status” pages<br />
(http://www.gemini.edu/sciops/schedules/obsStatus/ObsStatusNorth.html#GN-2005A-Q-<br />
1), which is “every few hours.” Another possibility is to automatically trigger an update<br />
of the pages when more than some fixed number of observations have changed status<br />
since the previous update.<br />
• Data from previous <strong>Gemini</strong> programs often play a role in specifying Phase II<br />
instructions. NGSC received some complaints again this semester regarding the<br />
unusually slow pace of data distribution from <strong>Gemini</strong> to P.I.s. The two instruments<br />
involved in the complaints were GNIRS and Phoenix. One set of Phoenix data, observed<br />
in June 2004, was received by the P.I. in late January 2005. The U.S. recommends that<br />
we speed data distribution to P.I.s, presumably via electronic distribution via the GSA.<br />
Rapid data distribution is one important step toward rapid publication.<br />
• As NGSC interacts with the community on Phase II, it is clear that there is interest in an<br />
eavesdropping mode. NGSC recommends that the Operations Working Group explore<br />
how to enable eavesdropping pathfinder(s). NGSC is enthusiastic to participate in such<br />
an effort.<br />
Other:<br />
The following NGSC astronomers visited <strong>Gemini</strong> to take part in queue observing during<br />
semester 2004B. The first table shows visits for standard queue observing.<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
23
Dates NGSC Astronomer Purpose<br />
8/14-8/18 Lucas Macri GMOS-N queue<br />
9/21-9/28<br />
Jay Elias<br />
GNIRS commissioning +<br />
queue<br />
9/23-9/26<br />
10/4-10/6<br />
10/7-10/9<br />
Rachel Mason<br />
Patrice Bouchet<br />
Marcel Bergmann<br />
Michelle queue<br />
T-ReCS commissioning +<br />
queue<br />
GMOS-S queue<br />
10/9-10/20 Tom Matheson GMOS-N training + queue<br />
10/29-11/2 Jay Elias GNIRS queue<br />
11/8-11/11 Marcel Bergmann GMOS-N queue<br />
12/11-12/13 Verne Smith GMOS-S training<br />
12/11-12/15 Marcel Bergmann GMOS-S queue<br />
1/28-1/31 Rachel Mason Michelle queue<br />
The second table shows NGSC support at <strong>Gemini</strong> South for Phoenix observing and Hokupaa-85<br />
commissioning during semester 2004B. NGSC provides expert support for these two<br />
instruments.<br />
Dates NGSC Astronomer Purpose<br />
8/6-8/10 Bob Blum Phoenix queue + payback<br />
8/22-8/25 Bob Blum Hoku-85 commissioning<br />
8/29-8/31 Andrei Tokovinin Hoku-85 commissioning<br />
12/16-12/17 Knut Olsen Phoenix queue<br />
12/18-12/19 Bob Blum Phoenix queue + payback<br />
12/19-12/23 Verne Smith Phoenix queue + payback<br />
1/20-1/27 Bob Blum Hoku-85 commissioning<br />
1/20-1/22 Andrei Tokovinin Hoku-85 commissioning<br />
Ramon Galvez and Michael Warner of NOAO improved the Abu read-noise performance in<br />
advance of the Hokupaa-85 January run. Galvez worked with Manuel Lazo and Hernan Solis of<br />
<strong>Gemini</strong> South to provide support for the Phoenix and Abu WFIRE electronics systems.<br />
NGSC organized a booth for the January 2005 American Astronomical Society meeting in San<br />
Diego, California. The NGSC booth featured displays on how to propose for <strong>Gemini</strong> observing<br />
opportunities, brochures on available <strong>Gemini</strong> instruments, posters on new <strong>Gemini</strong> observing<br />
opportunities, and tutorials on preparing Phase II programs. Numerous community members<br />
visited the NGSC booth.<br />
NGSC added two new staff members since the most recent report to the Operations Working<br />
Group meeting. Verne Smith started on 1 August 2004 as NGSC Deputy Director. Tom<br />
Matheson commenced employment as NGSC Assistant Astronomer on 1 September 2004; he is<br />
supporting U.S. GMOS users. Both Smith and Matheson perform all of their functional duties<br />
within NGSC (not shared with other NOAO divisions).<br />
C:\Documents and Settings\armand\My Documents\NGSC\Ops Working Group\OWG <strong>Meeting</strong> Feb05\Minutes_OWG_Feb05.doc<br />
24