Roading Activity
Management Plan
Prepared for Hurunui District Council
Prepared by
AECOM (NZ) Ltd
6th Floor, DTZ House, 76 Cashel Street, Christchurch 8011, New Zealand
P O Box 710, Christchurch Mail Centre, Christchurchh 8140, New Zealand
T +64 3 363 8500 F +64 3 363 8501 www.aecom.com
The information contained in this document produced by AECOM Limited is solelyy for the use of the Client identified on
the cover sheet for the purpose for which it has been prepared and AECOM Limited undertakess no duty to or accepts a
any responsibility to any third party who may rely upon this document.
Quality Information
Document
Ref
Date
Prepared by
Reviewed by
Hurunui District Council Roading Activity Management Plan
HDC RdAMP AMP v3 0 10D.docx
July 2010
George JasonSmith John Whyte
Mark Gordon
Revision History
Revision
Revision
Date
Details
Authorised
Name/Position
Signature
v3.0
1 July
2010
Final
Mark Gordon
Regional Manager
Page ii
Version 3.0
Roading Activity Managementt Plan
PLAN STATUS
1. Overall Responsibility for the Co-Ordination of all Matters in this Appendix
Date
February 2009
Name
John Whyte
Designation
Roading Engineer Assets
2. Appendix Prepared By
Version
Date
3.0 2006-2011
3. Appendix Reviewed By
Version
Date
3.0.6 January
2009
3.0.100 January
2010
Name
George JasonSmith
John Whyte
Name
Bruce Yates
David Edge
John Whyte
John Kerse
Alex Cooke
Brian McManus
Bruce Yates
David Edge
John Whyte
John Kerse
Brian McManus
Designation
Maunsell AECOM, Christchurch
Assets Engineer Roading
Designation
Manager Engineering Services
Roading Manager
Roading Assets A Engineer
Roading Engineer Operations
Townshipp Amenities Engineer
Roading Engineer Contracts
Manager Engineering Services
Roading Manager
Roading Assets A Engineer
Roading Engineer Operations
Roading Engineer Contracts
4. Adopted
Version
Date
Authentication
3.0 Final 24
February 2011 Endorsed by Council at Council Meeting Item 7.11
5. Updated By
Version
Date
Name
Designation
D
Version 3.0
Page iii
Roading Activity
Management Plan
This page is intentionally blank.
Page iv
Version 3.0
Roading Activity Managementt Plan
Contents
1
2
3
4
5
6
7
Introduction
1
1.1 Background ................................................................................................................... 1
1.1.1 Roading Assets ...................................................................................................................... 1
1.1.2 Community outcomes o to which the activity
contributes ......................................................... 2
1.1.3 Public Concerns ..................................................................................................................... 4
1.2 Objective of Roading
Activity Management Plan .......................................................... 4
1.2.1 Plan Objectives ...................................................................................................................... 5
1.3 Asset Management Level ............................................................................................. 6
Levels of Service, Performance
e Measures, and Relationship to Community
Outcomes
7
2.1 Levels of Service and Community
Outcomes...................
............................................ 7
2.2 Reporting ....................................................................................................................... 9
2.2.1 Targets and Measures ........................................................................................................... 9
2.2.2 Network Performance ............................................................................................................ 9
The Existing Situation
12
3.1 Assets ......................................................................................................................... 12
3.1.1 Assets Required. ................................................................................................................. 12
3.1.2 Asset Register ..................................................................................................................... 12
3.2 How the Roading Assets are Maintained and Operated ............................................ 14
3.2.1 Maintenancee and Operatingg Issues ..................................................................................... 15
3.2.2 Business Continuity, Emergency Management and Reinstatement .................................... 15
3.2.3 Maintenancee Forecast ......................................................................................................... 15
3.3 Renewals and Depreciation ........................................................................................ 15
3.3.1 Renewals funding ................................................................................................................ 16
3.3.2 Particular Renewals Issues........................
........................ ........................ ............................ 16
3.3.3 Renewals Forecast .............................................................................................................. 16
3.3.4 Change in Service Potential.......................
........................ ........................ ............................ 17
3.4 Future Demand and New Expenditure ....................................................................... 17
3.4.1 Future Demand .................................................................................................................... 17
3.4.2 New Expenditure ................................................................................................................. 17
3.4.3 How New Works are Funded ............................................................................................... 18
3.4.4 Other New Works issues. .................................................................................................... 18
3.4.5 New Works Forecast.......... ........................ ........................ ........................ ............................ 18
3.5 Asset Retirement / Disposal ........................................................................................ 19
Resource allocation
and budgeting
19
4.1 Funding the Annual Net Cost – ‘Who Pays?’ ....................
.......................................... 20
4.2 Schedule of Fees and Charges .................................................................................. 20
Environmental Management, Regulatory Matters and Activity Management
Issues
21
5.1 Environmental Management Issues ........................................................................... 21
5.2 Demand
Management ................................................................................................ 21
Significant Negative Effects
22
6.1 Road Safety ................................................................................................................ 22
Significant Assumptions, Uncertainties, and Risk Management
23
7.1 Assumptions and Uncertainties .................................................................................. 23
7.1.1 Growth 23
7.1.2 Costs 23
7.1.3 Useful Lives ......................................................................................................................... 23
7.1.4 Legislative Environment ....................................................................................................... 23
Version 3.0
Page v
Roading Activity
Management Plan
7.1.5
7.1.6
Planning Environment .......................................................................................................... 24
Risk Management. ............................................................................................................... 24
8
9
Roading
Bylaws and Statutoryy Obligations
24
8.1 Bylaws ......................................................................................................................... 24
8.2 Principal Statutes ........................................................................................................ 25
Business Improvement
25
9.1 Activity Management Plan Improvement and Review, ............................................... 25
9.2 Public Consultation ..................................................................................................... 25
10
Improvement Plan
25
Annex I
Annex II
Annex III
Annex IV
Annex V
List of Appendices
Financial Summary
Change in Network Service Potential
Planned New Works
Setting the Level of Roading Asset Management
Page vi
Version 3.0
Roading Activity Managementt Plan
1
1.1
Introduction
Background
The Local Government Act 1974 vests ownership of roads, other than State Highways, in the t
Council. This makes continued Council ownership the only available option. State Highways are
vested in the Crown and are maintained by Transit New Zealand. There T are three State
Highways in the District, State
Highway 1, , State Highway 7 (the Lewis Pass road) and State
Highway 7A (to Hanmer Springs).
The Hurunui District Council has no directt role in the provision of public p passenger transport, a
function allocated
under the Land Transport Management Act to regional councils, but it does
have an advocacy
role on behalf of its citizens.
The Council considers that the provision of the roading
network is a core function of local
government. Roading is largely for public benefit and promotes thee economic, social,
environmental and cultural wellbeing of the District’s communities,
by providingg for people and
goods to move safely and efficiently throughout the District.
1.1.1
Roading Assets
The Hurunui District Council is
responsiblee for the management off a roading network that
comprises of approximately:
Table 1 Asset Summary
Sub Asset
Roads
Kerb and channel
Footpaths
Bridges
Traffic facilities
Cycleways
Category
Sealed
Unsealed
Urban
Rural
Unformed
Networkk Length
On-roadd
597.5-km
856.1-km
75.6-km
1,377.9-km
861.0-km
1,453.6-km
38.1-km
47.1-km
Bridges
timber
other than 182, totalling t 5,397m
Timber Bridges
Culvertss greater than 3.4
35, totalling 395m
50
sq m
0.0-
Street lights
883-each
Signs
23,732-each
Markings
Inventory too be
verified-
0.0-km
Link: HDC RdAMP Apx A Overview 3.0.7.xlsx]Summary > $ $B$17. Data: 2/ /04/09 to 11/11/099
Quantity
In addition,
there are approximatelyy 2,768 km of unformed legal roads.
Version 3.0
Section 1 Introduction
Page 1
Roading Activity
Management Plan
The estimated usage of thesee roads is 66 million vehicle-km per year (0.67 x 10 8 vkt/yr) 1 and
their depreciated replacementt cost, at 30 June 2008, was $231,767,113 Goal and Principal
Objectives
The vision for the
land transport network of the Hurunui District is:
“To provide a transport networkk that is accessible for all people within the region.”
The principal objectives of the
network are:
1.1.2
To maintainn and enhance levels of service that reflect the needs of economic growth
and
diversity of
road users
To ensure that the levels of service be deliveredd reliably, efficiently and economically
That maintenance and development of the land transport system has regard for
environmental effects
Through inter-regional
and intra-regional co-ordination, maintain a consistent and safe
roading environment.
To promote
education and engineering programmes that target road safety issues of
specific concern to Hurunui District
To promote
walking and cycling within the District
Community outcomes to which the activity
contributes
Table 2: Community
Outcomes to which the Roading Activity primarily contributes
Community
Well-being
Outcome
Social
Economic
A desirable
Environmental
place to live
Cultural
Sub-Outcome
e
Attractive, well designed
villages v that present a
positive imagee encouragingg
people to live in and visit the
area
How Roading Contributes Towards
The
Outcome
By designing, constructing and maintaining
the road network to industry standardss and
best practice
By designing, constructing and maintaining
bridges, culverts and stormwater structures
in a manner that minimises hazards.
By designing, constructing and maintaining
appropriatee warning, advisory and
regulatory signs on the road network
A strong sense of community
that t gives people a sense of
belonging andd encourages
them t to take part in local
activities, to support essential
Provision and a maintenance of the roading
volunteer v services, and to be
network allowing peoplee to access these
involved i in local consultation
activities
and decision making
Opportunities
in leisure, art
and cultural activities
By planning, designing, constructing and
Effective planning for future
maintainingg the road network in a manner
development but ensuring that considers future needs alongside
those
the t preservation of local of existing users and residents.
heritage and rural
By maintaining the roading asset in a
uniqueness
manner that is sensitive to the diversee
heritage off the District
1
Source: HDC
RdAMP Apxx A Overview 3.0.2.xls]Hierarchy > $C$1
Page-2
Section 1 Introduction
Version 3.0
Roading Activity Managementt Plan
Well-being
Social
Economic
Social
Economic
Cultural
Environmental Environmental
Responsibility
Version 3.0
Community
Outcome
Essential infrastructure
A healthy place
meets the needs of the
to live
District’s communities
Thriving Local
Economy
Essential
Infrastructure
Sub-Outcome
e
A transport network which
supports s the safe and
efficient movement of people
and goods
A safe quality road
infrastructure
i
that is well
maintained
Clean, healthyy air quality
Environmenta
al safeguards
and protectionn for natural
Section 1 Introduction
How Roading Contributes Towards
The
Outcome
By designing, constructing the road network
to industry standards and best practice and
maintainingg it in a manner such that:
•the needss of future generations are
considered alongside those of existing
users andd residents.
•safety is improved.
•appropriate warning, advisory and
regulatoryy signs are provided on thee road
network
•dust-free surfaces are provided on roads
where economically viable
By providing new and upgraded kerb and
channel, footpaths and streetlights
By designing, constructing and maintaining
bridges, culverts and stormwater structures
in a manner that minimises hazards.
By designing, constructing and maintaining
appropriatee warning, advisory and
regulatory signs on the road network
By maintaining close liaison with the
tangata whenua w on all known and
potential matters m of interest to them.
By maintaining and developing the
roading assets in a manner that is
sensitive to the diverse heritage of the
District.
By designing, constructing and maintaining
a reliable road network.
By designing, constructing and maintaining
the road network in an affordable manner.
By designing, constructing and maintaining
the road network to industry standardss and
best practice
By providing dust-free surfaces on roads
where economically viable
By providing an efficient t transportationn
system that limits exhaust emissions
All measures listed in this Activity
Management Plan
By designing, constructing and maintaining
the road network to industry standardss and
best practice
By providing dust-free surfaces on roads
where economically viable
By planning, designing, constructing and
maintainingg the road network in a manner
that considers future needs alongside
those
of existing users and residents.
By designing, constructing and maintaining
the road network in a manner such that the
full social and a economic c costs and benefits
of projects are taken intoo consideration.
By providing an efficient t transportationn
system that limits exhaust emissions
By providing efficient andd appropriate
stormwater collection, and basic treatment,
systems in urban areas
By providing dust-free surfaces on roads
where economically viable
Page 3
Roading Activity
Management Plan
Well-being
Social
Cultural
Community
Outcome
Skills and
Education for
Work and Life
Sub-Outcome
e
assets balanced with
property owner’s rights
Clean and plentiful water in
our rivers, lakes and streams
How Roading Contributes Towards
The
Outcome
By maintaining significant areas of native
vegetation and areas of significant native
vegetation in environmentally sensitive
ways
By providing efficient andd appropriate
stormwater collection, and basic treatment,
systems in urban areas
By installing and providing bridges and
culverts in environmentally sensitive ways.
Provision and maintenance of a roading
network that allows people to attend
schools and other placess of skills education
By providing and maintaining a road
network that provides for people and
communities to travel to schools,
communityy centres places of work and
other locations where they can gain or
enhance skills and improve their education.
1.1.3
Public Concerns
Past customer surveys have shown that roads cause a high level of o dissatisfaction compared to
any other Council service. Footpaths are also cause for dissatisfaction with thee predominant
reasons stated was rough surface, poor road maintenance and condition and a lack of
footpaths.
The methods used to addresss these concerns include:
A programme of seal extensions, safety improvements and road reconstruction
A significant ongoing programme too upgrade existing footpaths and construct new ones
A change to use of ‘hybrid’ type maintenance contracts to provide betterr value for money
to the District
Funding and support for road safetyy education programmes
1.2 Objective of Roading Activity Management
Plan
Page-4
The objectives of this Activity Management Plan are to explain, clearly and succinctly, the
Council’s strategic and management approach for roading, footpath and car parking assets and
to ensure that the service the network provides and the costss of delivering these services
represent value for money to the Council’ss customers. This plan has been prepared in a manner
that enables its programmes
and forecasts to be transferred directly into the Long Term Council
Community Plan.
Value
for money is defined as:
Ensuring the level of service required by our
customers is i provided at the lowest long-
various “supporting documents”. There is a separate supporting document for every key
term cost to the community”
This Activity Management Plan provides the support material for the Long Termm Council
Community Plan. It is intended to be a complete record of the asset, the methods used to
manage it, and the activities associated with it. This plan will be continuously updated via the
strategic and management aspect of the activity.
Each supporting document contains a summary of the
strategic approach and management
approaches to that particular issue. The strategic conclusions are then taken forward to the
Section 1 Introduction
Version 3.0
Roading Activity Managementt Plan
Management Plan itself, and the t management issues into an ‘implementation and management
improvement programme’ (see Appendix ‘V’).
The intention is that the Council can be satisfied that this plan will form a majorr part of its ability
to satisfy the community, and the Council’ ’s auditors, as to:
“the quality of the information and assumptions underlying the forecast information
provided [in the consultation LTP];
and
the extent to which the t forecast information
and performance measures provide an
appropriate framework for the meaningful assessment off the actual levels of service
provision.” 2
The Plan will be an important and useful management
tool that will be kept updated on a
continuous basis.
1.2.1
Plan Objectives
This plan meets the following objectives:
Basis for Council Involvement — makes the rationale for thee Council’s involvement in
roading clear;
Evolutionary — builds on the existing situation and on the information that the Council
already has, especially in its earlier r Asset Management Plans;
Complete — All relevant informationn pertaining to current and future management off the
asset is included in the Activity Management Plan. This ‘Activity Management Plan’ has
been developed in this format to avoid the necessity for the Council to have to prepare a
separate ‘Asset Management Plan’ for this activity. In this context, ‘asset management’
means:
“Systematic and co-ordinated manages its i physical assets, and their associated performance, risks and
expenditures over their life cycles for the purpose of achieving its organisational
l
activities and practices through whichh an organisation
optimally
strategic plan.”
The approach taken envisages alll of the physical asset management matters, which
would otherwise be addressed in a separate Asset Management Plan, , being addressed
together with explanations of howw the Council intends to manage m its human assets,
information assets, intangible assets (reputation etc.), and financial assets, in order to
achieve the stated organisational
strategy.
Two key reference documents in this regard are:
The International Infrastructure Management Manual (New Zealand edition), published
by the Association of Local Government Engineering New Zealand (Inc.) (INGENIUM);
and
The draft ‘Specification for thee Optimised
Management of Physical Infrastructure
Assets’,
prepared by
the British Institute of Asset Management.
Focus — the plan is outcomes and outputs focussed;
2
Local Government Act 2002 Section 84(4)
Version 3.0
Section 1 Introduction
Page 5
Roading Activity
Management Plan
Legal Obligations — enables the Council to readily substantiate that it has met its legal
obligations and enables
it to satisfy all Audit and, The NZ Transport Agency
requirements;
Strategic Approach — provides a clear statement for the elected representatives of the t
local strategic approach
towards thee provision of the particular service, and of the levels
of that service that it is aiming to provide (i.e. a strategic plan) for the particular asset;
Transparency —
Produces an outputt that enables the public to easily and readily see and understand
what the
Council’s strategic and management approach to the activity is.
Will automatically result in there being a clear audit trail of o the way that decisionss have
been made (and the
reason(s) for the chosen option) – a necessaryy requirement now
pursuant to Section 77 of the Local Government Act 2002.
Guidance — provides clear policy guidance of the Council’s expectations to managers
and other staff;
Robust — provides clear evidence of the local authority having decided the District’ss
future direction, and its development programme, in a robust manner;
Continuing Improvement —
Is easily
able to be kept continuously updated;
Is able to be gradually enhanced and developed, in stages, until the desired level of
‘advanced activity (asset) management planning’ is reached;
Produces an implementation and improvement plan for the Council’s managers, in a
form that can be easily integrated with the Council’s overall controlss for management
of the particular activity;
Is not only able to be
used by, but the method of its compilation encourages its use by,
managers as a working document and prime management tool to aid continuous
improvement throughout the year;
Compatibility — Avoids
the necessity for the Council to do any a further work (other than
minor titivating) relating
to this activity for the Long Term Council Community Plan (or
Annual Plan). In other words, it is prepared and formatted inn a way so that the information
in it can be
‘dropped directly’ into the Long-term
Council Community Plan;
Consistency —
is at all times consistent with all of the Council’s higher-level strategic and other plans,
especially the District Plan, Strategic Plans, and Catchment Management Plans;
Is consistent with the Activity Management Plans for all other o Council activities;;
Integration —
Expresses the forecast future capital costss in terms of o ‘backlog / maintenance’ of
existing levels of service, ‘increased levels of service’, and a ‘growth in order to support
the Council’s Development Contributions / Financial Contributions policy, as a routine
step in the process;
Includes
the Council’s Funding Policy for the
Activity;
Avoids or eliminates the unnecessary duplication thatt would otherwise occur in a
variety of areas;
When read by a newly appointed ‘Activity Manager’, will give that person a clear total
picture of the whole situationn relating to
the activities that he/she is to have
responsibility for;
Focus — as a result of the way in which it has been ‘put together’ and iss required to be
updated, forces stronger, more co-ordinated and focussed managementm
t of the activity,
and greater accountability allowing the Council to focus lesss on the preparation of plans
to meet statutory requirements, andd more on more effective and efficient long-term
management of the activity.
1.3
Asset Management Levell
In 2008/09, the Hurunui District Council commissioned
Waugh Infrastructure Management
to
review
its asset management practices with a view to determining the appropriate level of asset
management for each of its activities. Thiss review recommended that the appropriate level for
Roading Asset management is i Core Plus. . The Council adopted this recommendation on 27
November 2008 at an ordinary Council meeting.
Page-6
Section 1 Introduction
Version 3.0
Roading Activity Managementt Plan
A copy of the Waugh report is
attached ass Annex V to
this Plan.”
2
2.1
Levels
of Service, Performance
Measures, and Relationship
to Community
Outcomes
Levels of Service and Community
Outcomes
The Levels of Service developed in this Plan are based on the District’s Community Outcomes.
The Community Outcomes are the result of public consultation carried out up to and during
preparation of the
2009/19 Long Term Community Council Plan (LTP).
In establishing the
Levels of Service the Council has considered itss legal obligations, comments
made
to it throughh formal consultation processes, the results of customer surveys, sound
engineering practice, affordability and economic efficiency.
As not all roads can reasonably be expected to provide identical levels of service a road
hierarchy has been established to assist inn defining the expected levels of service. The road
hierarchy reflects the significance and importance of each road in the District Road Network,
generally, the higher a road’s status in thee hierarchy the more traffic a road will carry. Hurunui
District Council roads fall into the followingg hierarchy:
Strategic Arterial Roads
District Arterial Roads
Collector Roads
Local Roads
For the purposes of establishing levels of service that are sensiblee to the road-user into the following groups,
for which current and desirable levels of service are established:
and at the
level of individual roads thesee five hierarchies have been rearranged
Strategic and Arterial Roads
Collector and Urban Collector Roads
Local Urban Roads
Local Rural Sealed Roads
Local Rural Unsealed Roads
Unsealed Urban Roads are not included inn this list as there is onlyy a small number of them and
the Council considers that the
minimum level of service for them iss a sealed surface.
Theree are four carriageway service indicators, capacity; ride quality; safety andd appearance;
and responsiveness; that are used to define the levels
of service on o each of the roads in each of
thesee groups.
The roading asset is also made up of a number of different components, each of which naturally
delivers completely differencee “service”. Apart from the
carriageway, upon which motor vehicles
normally run, there are also seven other associated roading sub-assets; footpaths and cycle
ways, kerb & channel and drainage, bridges and fords, street lighting, road marking and
delineation, signs, and appearance.
Theree is only a very shall amount of publicc off-street car parking that is not directly associated
with an adjacent public building, such as the Council’s
Amberley Offices, O or with a public
reserve maintained as a Community, rather than Roading, asset. Currently C these public off-road
car parks have not been identified but thiss is programmed to occurr early in 2011/12.
Version 3.0
Section 2 Levels of Service, Performance Measures, and Relationship to Community
Outcomes
Page 7
Roading Activity
Management Plan
The relationship between these level of service indicators and the Council’s Community
Outcomes is illustrated below:
Table 3, Community Outcome Linkages
Service Indicator
Carriageway
Footpaths and cycleways
Kerb & channel and
drainage
Bridges and fords
Streett lighting
Road marking and delineation
Signs
Appearance
Sub-indicator
Ride quality
Width
Surface
Safety
Presence
Width
Surface
Safety
Presence
Type
Material
Width
Load capacity
Availabilityy (fords)
Cycle lanes
Pedestriann facilities
Presence
Standard
Safety
Presence / use of
marking and delineationn
Legal compliance
Presence of Name-
warning of
blades
Appropriate
hazards and sudden
changes
Appropriate information
provided
Painted surfaces
Township roadsides
Rural roadsides
“Noxious weeds”
Related Community Outcome
Economic wellbeing
Economic wellbeing
Economic wellbeing
Social wellbeing
Environmental wellbeingg
Social wellbeing
Social wellbeing
Social wellbeing
Social wellbeing
Social wellbeing
Economic wellbeing
Social wellbeing
Cultural wellbeing
Environmental wellbeingg
Social wellbeing
Cultural wellbeing
Environmental wellbeingg
Social wellbeing
Cultural wellbeing
Environmental wellbeingg
Economic wellbeing
Environmental wellbeingg
Economic wellbeing
Environmental wellbeingg
Economic wellbeing
Social wellbeing
Environmental wellbeingg
Social wellbeing
Environmental wellbeingg
Social wellbeing
Environmental wellbeingg
Social wellbeing
Environmental wellbeingg
Social wellbeing
Social wellbeing
Economic wellbeing
Economic wellbeing
Economic wellbeing
Cultural wellbeing
Environmental wellbeingg
Social wellbeing
Economic wellbeing
Cultural wellbeing
Environmental wellbeingg
Social wellbeing
Social wellbeing
Social wellbeing
Social wellbeing
Environmental wellbeingg
Page-8
Section 2 Levels of Service, Performance Measures, and Relationship to
Community Outcomes
Version 3.0
Roading Activity Managementt Plan
Service Indicator
Sub-indicator
Weeds in footpaths and
gutters
Cleanliness
Offensive matter and
crash debris
Related Community Outcome
Social wellbeing
Environmental wellbeingg
Social wellbeing
Environmental wellbeingg
Social wellbeing
Cultural wellbeing
Environmental wellbeingg
NZ Transport Agency (NZTA)) has issued maintenancee guidelines for all road controlling
authorities, whichh have been incorporatedd in the various maintenance contracts as appropriate.
2.2
2.2.1
Reporting
Targets and Measures
Performance measures/indicators for the District’s roading networkk have, to date, largely been
found
within the specificationss for the various contracts the Council has made with contractors
and consultants for the maintenance and development of the road network. The maintenance
contracts set fault
trigger levels and response time requirements.
The District’s safety performance indicator is to “experience a downward tracking in the annual
accident rate over the next 5 years”.
The NZTA requires all road-controlling authorities to annually report on achievements and a
number of performance indicators.
The NZTA also records and analyses traffic crashes and publishess an Annual Report for
Hurunui District covering reported crashess over the previous 5-year period.
Environment Canterbury’s (ECan’s) Regional Land Transport strategy sets outt indicators and
monitoring requirements for a safe, efficient, accessible network that also has regard for the
environment.
Reporting also includes regular staff reports to the Council’s Workss and Services Committee.
2.2.2
Network Performance
The information reported in these ways forms the basis of the following Network Performance
Measures. Thesee measures will be reported in the Council’s Annual Reports. Progress towards
them, and the latest Achievements are detailed in Appendix B — Levels L of Service
Table 4, Network Performance Measures
Measure
Target
•LTP Measures
1. Essential Infrastructure
a.
Maintain infrastructure to a
standard appropriate to their use
and traffic volume
Version 3.0
Section 2 Levels of Service, Performance Measures, and Relationship to Community
Outcomes
Page 9
Roading Activity
Management Plan
Measure
•Roading Survey data compares
favourably
with other rural
councils similar to Hurunui District
• Smooth Travel exposure of the
network 3
− Overall
Target
− 95%
•NZTA audits confirm that the
roading network is in satisfactory
condition
•40-km of sealed roads have
waterproof sealing applied peryear
b. Good quality streetlights
c. Good quality kerb and channel in
urban areas
d. •Good quality footpaths in i urban
areas
• Percentage of
“rough” roads on the
Hurunui District’s sealed network
− Overall
• Pavement Integrity Index for sealed
roads
− Overall
• Surface Integrity Index for sealed
roads
− Overall
• Audits are carried out at
approximately
3- to 5-yearly intervals
as determinedd by the NZTAA
• Annual length
resealed
− District Wide
Reduce the percentage of substandard
lights by 1% annually to 4% by June
2013
• 2009/10
• 2010/11
• 2011/12
• 2012/13+
Reduce the percentage of deficiencies
inn kerb and channel by 1% annually a to
2% by June 2013
• 2009/10
• 2010/11
• 2011/12
• 2012/13+
• The percentage of defects footpath f
surfaces does
not increase
• The percentage of urban streets (by
length) without smooth footpaths
reduces to 12% by June 2013.
• 2009/10
• 2010/11
• 2011/12
• 2012/13+
− 5%
− 95%
− 95%
•2005 - Yes
− 40km
•7%
•6%
•5%
•4%
•5%
•4%
•3%
•2%
Currently 0.2%
− 15%
− 14%
− 13%
− 12%
3
Determined in accordance with NZTA definitions
and reporting criteria incorporated
in the
algorithms included in the RAMM database by the Agency..
Page-10
Section 2 Levels of Service, Performance Measures, and Relationship to
Version 3.0
Community Outcomes
Roading Activity Managementt Plan
Measure
2. •A healthy place to live
a. •Residents’’ satisfaction
b. •An additional 1km of unsealed
road is sealed each year
c. •Bridges have adequate strength s
and are well maintained
d. Improving road safety
Internal measuress
3 Unsealed roads
4 Urban Streets
5 Bridges
•
• The proportion of those surveyed
considering the standard off sealed
roads to be satisfactory or better
increases to 80% by June 2013
− 2009/10
− 2010/11
− 2011/12
− 2012/13+
• The proportion of those surveyed
considering the standard off unsealed
roads to be satisfactory or better
increases to 60% by June 2013
− 2009/10
− 2010/11
− 2011/12
− 2012/13+
• Length of seal extension (km)
• All bridges are
capable of carrying
Class 1 loads
− Number of load restricted bridges
• Bridges and bridge components will
be prioritized for renewal and a
replacement programme implemented
− Number of renewed bridges and
major structural components
i. 20010/112
• Bridges are inspected regularly,
according to need, and nott less than
once in 5-years
− Number of bridges over-due for
inspectionn
The number of
road crash fatalities on
Hurunui District’s roads reduces
− 2009/10
− 2010/11
− 2011/12
− 2012/13+
• Length of unsealed roads ( km)
• Proportion of unsealed network
carrying > 100 veh/day
• Proportion of unsealed roadd length in
the maintained network
• Proportion of travel on unsealed roads
(vkt)
• Proportion of urban streets (by
length) with substandard street
lighting by June 2013
• Proportion of load-restrictedd bridges
in the network
• Proportion of network accessed over
load-restricted bridges
Target
− 70%
− 75%
− 75%
− 80%
− 50%
− 55%
− 60%
− 60%
•
•
− 20 bridges
− Nil
− By 5%
− By 10%
− By 10%
− By 20%
•854
•0.5%
•58.9%
•
Roading Activity
Management Plan
Measure
6 Road maintenance and renewal
7 Road safety
• Average remaining seal life (years) on •7-years
all roads
• Value for Money
− Maintenance Cost / vkt (Total
value of subsidised maintenance
based on final The NZ Transport T
Agency claim)
− Value of Deferred Maintenance at
end of year
− Change in
Network Service
Potential 4
• Total number of injury crashes per
100 million vehicle km travelled
(10 8 vkt) on local roads
Target
− < $0.05
•
•
−
Roading Activity Managementt Plan
lightly
trafficked metal roads. This information is required to allow more m accurate prediction
of
future
needs.
The major component of the network is the carriageway.
The following charts show the
distribution of carriageway types by hierarchy and between urban
and rural areas.
Figure
1 Carriageway Types
km
1,600
1,400
1,200
1,000
800
600
400
200
-
Arterial
Carriageway Types
Data: 11 Nov 09
Collector
Local
Grand Total
Unsealed
Sealed
Concrete
-
82.337
-
16.848
154.947
-
839.2022
360.0033
0.221
856.050
597.287
0.221
Link: HDC RdAMP Apx A Overview 3.0.6.xlsx]Hierarchy > $ $A$24
Figure
2 Carriageway Types
Network length
Vehicle-km travelled /year
Proportion of Network Total
80.0%
60.0%
40.0%
20.0%
0.0%
Rural
Urban
Sealed
36.5%
4.6%
Unsealed
58.3%
0.6%
Proportion of network vkt
100.0%
80.0%
60.0%
40.0%
20.0%
0.0%
Rural
Urban
Sealed
67.7%
11.7%
Unsealed
20.4%
0.2%
Link: HDC RdAMP Apx A Overview 3.0.6.xlsx]Hierarchy > $ $A$68. Data: 3/11/09
Some
66,755,5266 vehicle-kilometres are travelled (vkt) on these roads annually, with
4,916,000-vkt being in covered in urban areas 58,787,839-vkt on rural r roads. (S
Apx A Overview 3.0.2.xls]Hierarchy > $G$ $62)
Source: HDC RdAMP
Bridges are the other significant asset element. The Bridge Inventory is summarised in the
following chart.
Version 3.0
Section 3 The Existing Situation
Page 13
Roading Activity
Management Plan
Figure
3 Bridging Summary
6,000
Bridge Summary
Data: 2 Apr 09
250
Length (road centreline-m)
5,000
4,000
3,000
2,000
1,000
200
150
100
50
Number
0
Concretee Steel Timber
Other
Concrete
Steel
Timber
Other
Concrete
Steel
Timber
Other
Grand
0
Length (m) 2805
Quantity 89
Single Lane
1525 375
56 31
7 492
1 11
Ambiguous
9 16
2 3
171 347
2 20
Two Lane
41 5
1 1
Total
0 5792
0 217
3.2
How the Roading Assets
are Maintained and Operated
Maintenance and Operation are discussedd in detail in Appendix E.
Maintenance in this context includes mostt activities normally associated with the word but
excludes “renewals”, which are the replacement of long-life assetss or components at the end of
their useful lives. Renewals are detailed inn a separate section, below. Maintenance also
excludes new works, and works whose prime purpose
is to improve levels of service, e.g. seal
extensions
The Council’s operational maintenance strategy is to provide the most m cost effective
maintenance solution in each circumstance. This is done by:
monitoring
the condition and performance of assets,
investigating any system
deficiencies which are
outside the parameters of the targett level
of service,
identifying the work required to correct defects, and
engaging skilled, qualified and experienced contractors after seeking prices for work
on
the competitive market.
Assets are monitored throughh routine proactive inspections, testingg and the analysis of
customer complaints and condition reports. Service levels are managed by assessing the
consequences of asset failure
and assessing the levels of customer expectation. Asset
ownership costs are minimised by identifying, evaluating and introducing new technologies
and
equipment that may improve operational and management efficiencies.
All physical maintenance activities are carried out under contract. The T Council maintains no
physical-road-works maintenance staff, either directly or through a Council Controlled
Organisation, to carry out road
maintenance activities.
The government supports 50%
of the costt of many of the maintenance activities carried out on
the District’s roads. This support, commonly called “subsidy” but more m correctlyy termed financial
assistance, is only available when the work meets particular criteria, specified in The NZ
Transport Agency’s manuals, and is generally not available for amenity works or work on
footpaths or off-road facilities. . The Inland Road between Mt Lyfordd and the Conway River is an
exception to the normal subsidy regime. This road (17.3km) is designated a special purpose
road because of its national significance and attracts a 100% maintenance subsidy.
Page-14
Sectionn 3 The Existing Situation
Version 3.0
Roading Activity Managementt Plan
The Council has in place a Civil Defence plan that has
been prepared in accordance with the
Civil Defence Act 1983. This plan will be updated to meet the requirements of the Civil Defence
Emergency Management Act 2002.
The Council also has an Adverse Events Plan to cover those events that may occur that do
not
activate a full civil defence emergency.
3.2.1
Maintenance and Operating Issues
Maintenance of the road network has generally been to a standardd sufficient too maintain safety,
keep abreast of maintenance and respondd to most public complaints. However, the
development of this Activity Management
Plan has highlighted four principal areas where
maintenance has not kept up with demand, or where it may fall behind if something is not done.
These are: road widths (seal widening), seal extensions, area widee treatment or strengthening
overlays, and short culvert barrel-lengths creating pinch points.
The overall condition of the network has been improving over the years y but, in some instances,
user expectations
have increased faster than the improvements can be fundedd or implemented.
However, the adoption of the agreed levels of service should go some way to addressing this.
3.2.2
Business Continuity, Emergency Management and Reinstatement
The Council has in place a Civil Defence plan that has
been prepared in accordance with the
Civil Defence Act 1983. This plan is to be updated to meet the requirements off the Civil
The Council also has in effectt an Adversee Events Plan
to cover those events that may occur but
do not activate a full civil defence emergency.
Emergency reinstatement refers to unforeseen significant expenditure that arises from a
defined, major, short duration natural event such as earthquakes or o major floods It allows for f the
restoration of roads and roading structuress to a standard no betterr than that which existed
before any damage occurred.
The Hurunui District Council has experienced only three adverse events e that have required
emergency expenditure since
its formationn in 1989. It is understood that the previous local
authority did not experience these types of events in the 10-years preceding amalgamation
either; therefore no financial provision hass been made
for Emergency Reinstatement. It is
expected that should there be
a need for such work, there would be b significantt expendituree
required and the costs, after subsidy, would be met by
loans.
Expenditure on “predictable” and minor emergencies,
such as heavy, but not extreme, snow,
wind or rainstorms, is funded as routine maintenance
under the corridor maintenance category.
3.2.3
Maintenance Forecast
The Maintenancee Forecast is at Appendixx E. Maintenance forecasts by activityy area are also
outlined Annex II to this plan
3.3
Renewals and Depreciati
on
Renewals are discussed in detail in Appendix F — Renewals.
Asset
renewals are activities that t go beyond maintaining the serviceability of an asset and
extend its life significantly. For roads, the main parameter that signals the needd for renewals is
the condition of asset elements. As an element deteriorates some of its characteristics change,
for example, a sealed road surface will become rougher with age and a a sealed-carriageway will
crack
and lose chip as it ages, eventually losing its waterproofing qualities. q
Version 3.0
Section 3 The Existing Situation
Page 15
Roading Activity
Management Plan
All renewal activities are carried out underr contract. The Council employs no maintenance
staff,
either
directly or through a Council Controlled Organisation, to carry out road maintenance
or
renewal activities.
The renewal activities listed will take placee across the District, based on the state of the assets
and the relative priority of the work. In assessing the relative priority, staff will consider the
requirements of the Council’s Safety Management System for Roads.
3.3.1
Renewals funding
Roading renewals
are not funded from depreciation charged on roading assets; rather, the
costss of renewals
are met as direct costs. Nevertheless, depreciation — an amount charged
over a period to reflect the cost of the portion of the life
of the asset ‘consumed’ over that period
— is calculated and charged annually. This amount is compared with w actual and forecast
expenditure on renewals as one measure of the Council’s commitment to maintain the current
service capacity and integrity of the Council's assets.
Not all components of the network deteriorate over time and hencee depreciation is not charged
on alll components. Land is one example of a non-deteriorating component. A complete
discussion on depreciation is contained the Associated
Documents.
3.3.2
Particular Renewals Issues
3.3.2. 1 General
The most significant issue when renewingg roading assets is the difficulty in obtaining NZTA
financial assistance for renewal works, because of the
very low traffic volumess on many of the
District’s roads.
Approximately 26% of sealed surfacings have exceeded their design lives by more than 2-
years. While some of these “over-runs” could be the result of missed reseal dates in the data
collection process, most are considered too be the result of better than expectedd achievement –
typical of the upper end of the
“bell curve” ” that defines
the distribution of lives around the mean.
(Source: [HDC RdAMP Apx F Renewals v3.0.3.xls]Surfacings > $A$123)
3.3.2. 2 Bridges
Theree are 48 bridges, with a total replacement value of $42,297,893 that do not meet the
NZTA’s requirements for funding, becausee they are deemed to be “uneconomic”. These are
discussed in detail in Appendix F — Renewals. Source: [HDC[
RdAMP Apxx F Renewals v3.0.3.xls]Bridges >
3.3.2. 3 Roads
The current NZ Transport Agency fundingg arrangements with do not allow certainty when
programming renewals works, especially pavement renewals. Thee programmes developedd in
this plan are based on sound engineering practice and, where applicable, industry and NZTA
accepted modelling techniques, nevertheless the NZTA’s economic based approach can
sometimes preclude funding for f some projects.
$A$13
3.3.3
Renewals Forecast
The Renewals Forecast is at Appendix F. Renewal forecasts by activity area, are also outlined
Annex II to this plan
Page-16
Sectionn 3 The Existing Situation
Version 3.0
Roading Activity Managementt Plan
3.3.4
Change in Service Potential
In is accepted practice that the useful capacity of an infrastructural network, such as the
Council’s roading network, can be represented by its replacement
cost. From an asset
management perspective the most useful part of this measure is its annual change, which can
provide an indication of the long-term sustainability or otherwise off the investments being
made
in the network.
Standard practice
is that the annual change in network
service potential (sometimes call decline
in service potential) is measured by the difference between annual depreciation 6 and the annual
investment in asset renewals, , at a network level.
Because the change in network service potential varies with changes in both the annual budget
and the asset valuations, it changes year-on-year. servicee potential it is i discussed in Annex III below, which can
To facilitate more accurate and timely
reviews of the changes in network
be amended and updated more easily than the body of this plan.
3.4
3.4.1
Future Demand and New
Future Demand
Expenditure
The land transport network is responsible for the efficient movement of people and goods
throughout the District and to neighbouringg districts. The land transport network is a core facility
maintained by the
Council to assist it in meeting its Community Outcomes.
The major factors
that may force the needd for change on the assets are a change in population,
a change in the way a road is used, a change in the level of service demandedd by the road
users, and a change in the strategic management of the assets.
No rigorous demand predictions have been prepared for the Hurunui District.
The District population has grown slowly but steadily over the last 10 years, with the majority
occurring in the built-up areas
of Hanmer Springs and Amberley. There T has been some recent
movement towards small “lifestyle” holdings in the rural area but this is not yet having an
appreciable effect on the District’s road network. As the bulk of traffic in the District is carried on
the State Highway network, owned and maintained by
the Crown, any effects of growth on the
road system are largely confined to the areas experiencing the growth.
Theree is one significant exception to this “minimal effect’ rule of thumb, Hanmer Springs. Growth
here has been significant and is putting considerable strain on the Council to upgrade the
facilities in the older parts of the town to match those being provided by developers in newer
areas.
3.4.2
New Expenditure
Demand for new or upgraded facilities arises from the needs of thee existing population i.e.
meeting the level of service standards, changing habits, and population growth. This demand
can manifest itself in the need
for:
New roads;
Sealing of unsealed roads;
Widening and alignment improvements;
Upgraded intersections;
New or upgraded bridges;
6
Calculated using the Optimised Depreciated Replacement Cost method
Version 3.0
Section 3 The Existing Situation
Page 17
Roading Activity
Management Plan
Appropriate
urban facilities in closely settled areas, e.g. streetlights, kerbb and channel,
footpaths
These projects are identified via monitoring, community and Council input, andd through statutory
requirements. The
condition of the network and its components aree continuallyy monitored and
council staff, contractors and consultants identify development opportunities. The concerns and
desires of all stakeholders are
also identified, considered and taken into account through
feedback and consultation. To
date the rate of development has not generatedd a need for any
new roads outside
the subdivisions themselves; this is
expected too remain the case at the
current rate of development.
Projects are funded based on need, with funding priorities determined on condition and any
known safety deficiencies. Where there are competing
projects preference will be given to those
eligible for subsidy. New footpaths and kerbs and channel are funded from thee Amenities
budget, which is allocated to and approved by Wards Committees.
The new works planned to be
provided during the next three yearss are listed inn Annex III.
3.4.3
How New Works are Funded
Financial Contributions, levied under the Resource Management Act 1991 (the RMA).
The policies to offsett adverse effects of a particular development are identified in the
Hurunui District Council’s Districtt Plan.
Development Contributions, levied under the Local Government Act 2002 (the LGA) for
growth related projects that are identified in the Council’s Long Term Council
Community Plan.
Existing residents, through rates and loans..
Direct contributions from f residents, e.g. towards seal outside a residents’ property.
Councils can require contributions from developers to offset the costs or adverse effects off
growth. However,
to do so the
mechanisms must be stipulated in a Development Contributions
Policy
and the District Plan must contain rules providing for Financial Contributions. The Council
cannot take Development Contributions for the same purpose as itt has also levied Financial
Contributions.
Debt,
loan repayment period, priorities, impact of future debt level, and similar topics are
discussed in Appendix J — Debt and Loann Servicing
3.4.4
Other New Works
issues.
The Council’s share of new works above $ $100,000 is funded from reserves or by loans over 20-
years
with the cost met by the
District Roading Rate. The Council’ss share of new works
expenditures lesss than $100,000 is fundedd as operational expenditure from thee District Roading
Rate.
Other
sources of funds for roading improvements are:
3.4.4. 1 Land Transport Programme
The Land Transport Management Act 2002 requires that the Regional Transport Committee, of
whichh the Hurunui District Council is a member, to prepare a Land Transport Programme three-
the public on it. The Hurunui District Council prepares a Land Transport Programme as an input
yearly, to coincide
with the Long Term Council Community Plan cycle, and to formally consult
to this
process.
3.4.5
New Works Forecast
The New Works Forecast is at Appendix F. New works
forecasts by b activity area, are also
outlined Annex II to this plan; the forward programme for the next three t years is at Annex III.
Page-18
Sectionn 3 The Existing Situation
Version 3.0
Roading Activity Managementt Plan
3.5
Asset Retirement / Disposal
Assets are considered for disposal when they becomee uneconomic to own andd operate, such as
when
they become an uneconomic roading facility as supported byy The NZ Transport Agency,
or through rationalisation of the asset stock.
The use of revenue arising from the sale of any assetss will be credited to the respective
operating account at the time of the asset’s disposal.
Other
than Deans
Bridge on Kilmarnock Rd, which has been bypassed and is scheduled to
be
sold in 2008/09, no major assets are expected to be disposed of over the next 10 years.
4
Resource allocation andd budgeting
Resource allocation and budgeting are components of
the continuum illustrated in Figure 4
below. Changing any part of this continuum affects all the other parts. While none of these
effects is unexpected, the sequence of events is often lost sight of.
Figure
4 The budgeting continuum
Resource
Allocations
Levels of
Service
Budgets
Asset
condition &
performance
measures m
Achieved
performancee
Programs
At the
Core Plus level of asset roading management adopted by the Council budgets should be
based
on asset management needs developed through the asset management process. While
the process is continuous the start point of each cycle at the Core Plus level is s Levels of
Service; thus if a particular budget outcome is required
this will normally be achieved by
adjusting the levels of service. However, even in organizations exhibiting the highest levels
of
best practice asset management there will be occasions when the immediate needs of the
assets cannot be met by available fundingg and budgets are adjusted ahead of changes in levels l
of service.
The continuum illustrated Figure 4 shows that the immediate effect of a changee in budget is on
resource allocation. A change
in budget influences levels of service and the expected end-of-
on resource
allocations. This change in turn affects thee Council’s programs andd ultimately its performance.
These considerations provide
the basis for the Council’s asset management process when
theree is an urgent
need or desire to reducee or increasee a budget or a budget has been
period condition and performance of the assets through their immediate effectss
unexpectedly changed. The appropriate response is to:
Version 3.0
Section 4 Resource allocation and budgeting
Page 19
Roading Activity
Management Plan
Review planned resource allocations.
Determine the effects these will have on agreed
levels of service.
Assess how
these changes in levelss of service will be reflected in the end-of –period
asset condition and performance.
Adjust the work plan as
necessary to achieve the best possible life cyclee asset condition
and performance within
the available budget. This may mean leaving some assets to
decline in condition to the stage that they require more expensive actionn later.
Assess the
effects of the revised programs of the agency’s performancep
e targets.
Report the anticipated effects on the targets to senior management.
When
the need for a budget change is less urgent or is anticipated, the sequence illustrated in
Figure 4 will be followed, starting at levelss of service and going through as many iterations as
many
times as required to produce the desired result. Before any changes c to levels of service
are confirmed the
Council will consider whether the equired changes are sufficient to warrant
consultation with key stakeholders or customers.
4.1
Funding the Annual Net Cost – ‘Who Pays? ?’
Councils are required to have
a Revenue and Financing Policy to show s who pays for the
services it delivers. There is a list of principles, relating
to the funding of expenditure needs, in
the Local Government Act 2002 that the Council must take into consideration when it adopts its
Revenue and Financing Policy.
Many
roading activities receive financial assistance from the Crown, through The NZ Transport
Agency. These Crown funds are essentially a user charge and aree gathered byy the Crown from
road user charges, petroleum taxes and similar charges and fees. Currently maintenance
activities attract financial assistance at 50% of total cost and construction activities at 60% .
The benefits apply in part to the whole community, as people are free f to use any public road in
the District. The recovery of subsidies fromm The NZ Transport Agency reflects partly the private
benefits that are attributed to the roading network. However, in many instances parts of the
roading activity are not eligiblee for subsidy. Therefore, the balance of costs must be recovered
through rates.
When
considering
the underlying roading infrastructure the Council recognisess that there are
benefits to both individuals and to properties, from of the roading activity. a The Council’s
assessment is that its share of roading costs should be gathered solely s from a rate on the
capital value of properties, with no uniformm annual charges levied as a this best reflects equity,
use and access to
the network.
Private developers generally meet the full cost of new roads, or contribute to the upgrade of
existing roads through Development Contributions, the
balance of funding requirements are met
by the
Council and funded as for other neww works. For minimum standard, non-subsidised, rural
seal extensions, direct contributions are made by benefiting landowners.
4.2
Schedule of Fees and Charges
Some
important, but relatively
minor aspects of the network’s operation traditionally attract
charges or user-pays costs in some districts. The Council’s policies and practices on fees and
charges are discussed in Appendix L — Income, Fees, Charges and Funding Policy. In
summary, there are few charges or fees, the most common fees charged are for road-opening
permits (not charged to utility operators) and for road closures for car c rallies.
Page-20
Section 4 Resource allocation
and budgeting
Version 3.0
Roading Activity Managementt Plan
5
5.1
Environmentall Management, Regulator
ry Matters and
Activity Management Issues
Environmental Managem
ment Issues
Some
roading activities may have potential or actual effects on thee environment and the Council
is required to monitor the environmental impacts of its activities. Ensuring that all necessary
resource consents are applied
for, and granted, in a timely fashionn is a critical part of road
management. The
Council has three typess of resourcee consents from Environment Canterbury
to cover its roading activities, Global Consents, Period
Consents and a Project Consents.
The Council maintains an electronic database for all its consents, the t majority of which are
for
activities related to the operation of its various utilities.
This database keeps track of all consent
requirements and
the monitoring of them. It also generates alert notices prior to expiry of
consents. Large consent applications, such as a global consent for working in waterways, can
take up to a year and $20,0000 to $30,000 to prepare and lodge.
Current consents are detailedd in Appendixx N — Resource Management` Matters:
Consents required from time to t time for specific projects are generally relinquished once the
work has been completed.
Future resource consents to be sought aree also discussed in Appendix N.
The Hurunui District Plan contains two roading designations for thee Hurunui District Council
under the Resource Management Act for road widening on Osborne Road andd Courage Rd.
5.2
Demand Management
The number of motor vehicles
per household in the District is predicted to increase in the short
term but the change is the medium to longg term is very
unclear. The Council has adopted the t
policies set out in the Regional Land Transport Strategy that will encourage and facilitate the
reduction in motorised road traffic.
Policies and strategies that will encouragee a reduction
in the levelss of motorised road traffic
include:
Aiming to reduce the use of Heavy Commercial Vehicles on local roads as defined in
the
road hierarchy;
Promoting economic alternatives too roading where alternatives are safe and efficient;
Ensure that significant land use developments provide for a range of land transport
movements
(cycle ways, waterways, public transport, etc.) in their developments, either
directly or as part of a financial f contribution;
The District promotes a choice of transport modes, includingg public transport and
provides facilities for cycling and walking particularly within urban u centres;
Implementation, where economically acceptable, of the recommendations of the District
Cycling/Walking Strategy;
Further development of policies and strategies to manage roading demand is required as part of
the Activity Improvement Plan
Version 3.0
Section 5 Environmental Management, Regulatory Matters and Activity
Management Issues
Page 21
Roading Activity
Management Plan
6
Significant Negative Effects
The Hurunui’s land transport network provides people a high degree of mobility. However, the
development of the roading network, despite being the
foundation upon which the whole District
functions, can also have some
negative effects, or more accurately, use of the e network can
have some adverse effects. These includee road safety, local air pollution, road run-off (rainwater
that becomes polluted on the road surface) to adjacent land and waterways, w traffic noise and
vibration, visual impacts, loss and damagee of land and
natural environments, separation off
neighbours and emission of greenhouse gases. Thesee impacts can also have a negative effect
on public health and well-being.
Some
of these negative effects are beyond the control of the road owner but measures can
be
taken
to alleviate the effect off many and this is taken into account during design and
construction of projects and other work.
High volumes of traffic affect residential r amenity. The
most common effects are noise, lighting
and air quality. Dust from unsealed roadss causes a nuisance on neighbouring
n
properties.
In addition to the effects on air quality discharges from
motor vehicles has the potential to
diminish the water quality of adjacent streams from the
run off fromm the roads.
6.1
Road Safety
On the Hurunui District’s roads there weree 2 fatal, 10 serious, 42 minor m and 700 non-injury traffic
crashes in the years 2000 - 2004. In 20044 the social cost of road crashes c on local roads,
according to the NZ Transport Agency Road Safety Report, was $ 19.91 million. This was 0.55%
of the
social cost of all crashes New Zealand.
The social cost of
a road crash includes a number of different elements:
Loss of life and life quality;
Loss of output due to temporary incapacitation;
Medical costs;
Legal costs;
Property damage costs.
The average value of a loss of life due to a road crash
is estimatedd by the amount of money the
New Zealand population would be willing to pay for a safety improvement that would resultt in
the expected avoidance of one prematuree death. It, and the social cost of eachh crash, is
established by the
NZ Transport Agency on behalf of the Crown.
The Hurunui District currently ranks 3 rd forr urban local roads and 4 th for rural local roads in NZ
Transport Agency’s Peer Group ‘E’.
The Council challenges the people of the District to meet the visionn of:
“We live the lives that thee rest of the world wouldd love to live”
The road safety goal is:
To develop a responsible road safety culture by changingg behaviour and attitudes.
The Council proactively encourages commitment to road safety activities at all levels of the
community.
Page-22
Section 6 Significant Negative Effects
Version 3.0
Roading Activity Managementt Plan
7
7.1
7.1.1
Significant Assumptions, Uncertainties,
, and Risk
Management
Assumptions and Uncertainties
Growth
From
research carried out for the Regional Land Transport Strategy by ECan future traffic
growth is predicted to be at a level of 2% per annum. This level off traffic growth is linked to:
population growth in established urban centres and the coastal margins between
Amberley and Christchurch;
an increasee in vehicle ownership within the District;
growth in intensive agriculture and agricultural processing industries (e.g. vineyards and
wineries;
development in both the primary and value-added sectors; and a
the popularity of Hurunui as a tourist destination.
Increasing traffic volumes are
expected too significantly
affect the Districts D arterial road network,
whichh is largely owned and operated by the NZTA on behalf of thee Crown.
7.1.2
Costs
Project costs are based on current practice, standardss and local knowledge of materials and
construction costs. Provision for f future inflation, required in LTPs by b the LGA 2002, has not
been included in this plan. Rather, it will be estimated and applied uniformly to all aspects of the
LTP at a corporate level. Costs in this plan are quoted
in “Year Zero” dollars. Year Zero is the
current year – that before the first year of the programme or plan. Costs for thee coming year are
reviewed annually
as part of the annual budget preparation process.
It is assumed thatt costs forecast in forward programmes will not vary beyond the corporate
allowance for inflation. The Council has noo contingency in its budget to allow for increases. If
costss do increasee over the budget amount, the Council may have insufficient budget, this will
affect
levels of service.
It is assumed thatt the only increases in Operations and Maintenance costs associated with
the
network are related to growth of the network. Unidentified increases in costs could reduce the
Council’s ability to
deliver the maintenancee programmes.
7.1.3
Useful Lives
The useful lives of the network described in the asset valuation aree assumed too be an accurate
representation. An incorrect assumption relating to useful life would affect the asset valuation
and depreciation calculations, , which further impact on the depreciation recovery portion of rates.
The council is confident in the
accuracy off the current figures; however these are continually
under review to ensure on going accuracy.
7.1.4
Legislative Environment
The Council has assumed there will be noo changes to legislation that will incur r significant
increases in compliance costs. No budgett provision has been made for any increased costs in
this area.
Version 3.0
Section 7 Significant Assumptions, Uncertainties, and Risk Management
Page 23
Roading Activity
Management Plan
7.1.5
Planning Environment
Although there are changes proposed to the Resourcee management Act 1991 by the
Government 7 , this
plan makes
now allowance for the affects of anyy changes that may occur,
because of the uncertainties that t surroundd tem. Further, this plan assumes a there will be not
changes to the Hurunui District Plan or thee Canterbury
Natural Resources Regional Plan.
7.1.6
Risk Management.
The council is exposed to a number of risks arising from the operation of the road network. .
Riskss arise from any number of sources, but can generally be grouped into twoo main areas:
Management: those risks that are largely concerned with thee way the roading network is
managed, including funding, resourcing, programming of work and interaction with the
public.
Environmental: those risks that are concerned with the impact of the environment on
the
physical assets, including natural and man-made disasters.
At present there is no comprehensive hazard register for the Hurunui road network. Never-the-
reduced
risk on the network over the years by improving high-risk sites as the t work cann be afforded. This
less the roading staff are familiar with the network and
the Council has progressively
process has been
assisted by
crash-reduction studies, focussed on areas where there are
clusters of crashes, with the assistance and support of The NZ Transport Agency. Development
of a Hazard Register for the road network is included in i the Improvement Plan.
Riskss have been analysed by staff of the Council and they are currently only a limited view
of
the risks the network is exposed to. The list was developed by considering each area of the
Council’s road network activities and identifying risks arising from the t way eachh activity is
carried out. Thesee risks were then be evaluated and ranked using the criteria described in
Appendix R. The result is the Roading Risk Register which identifies and evaluates risks as
well
as identifying mitigation and management
t options to reduce the level of risk.
7.1.6. 1 Natural Hazards and Lifelines
In addition to the risks arising from the operation of the
road network the network itself is att risk
of damage from natural events such as earthquake, flood freezing and snow. Because of the
importance of roads in ensuring that communities and individuals can c obtain the necessities of
life consideration
of the risks of natural events on the network and of methods of addressing
and overcoming these risks is
described as Lifeline Security.
The Council has a set of well-established
procedures for dealing with w snow, flood, fire, and
wind
events. It has also
worked with NZTA on the development of the State S Highway Lifelines project
covering SH7, SH7A and SH1
within the District. A separate Hurunui District Lifelines Study is
being
undertaken.
8
8.1
Roading Bylaws and Statutory
Obligations
Bylaws
The following council bylaws affect roads, roading and
transportation:
Hurunui District Council Public Places Bylaw 2008
Hurunui District Council Speed Limits Bylaw 2005 (as amended)
7
At 1 Feb 2009
Page-24
Section 8 Roading Bylaws and Statutory Obligations
Version 3.0
Roading Activity Managementt Plan
Hanmer Springs and Gore Bay Liquor ban Bylaw 2006
Hurunui District Council Dog Control Bylaw 2008
Hurunui District Council Livestock Movement Bylaw 2008
The process for, and timing of, bylaw reviews are both
managed by b the Council’s Policy
Section. These processes are
carried out in accordance with the equirementss of the Local
Government Act 2002.
8.2
Principal Statutes
The principal statues affecting
this activityy are listed below. This is not a comprehensive list.
That is contained in the supporting documents to the Plan.
Local Government Act 1974
Local Government Act 2002
Land Transport Management Act 2003
Resource Managementt Act 1991
Legislative and other similar requirementsr
s are discussed in more detail d in Appendix S.
9
9.1
Business Improvementt
Activity
Management Plan Improvement and Review,
During preparation of this plan, a number of opportunities to improve the management and
operation of the road network were identified. Each of the supporting documents has its own
Improvement Plan. These individual improvement plans have beenn consolidated into the
Roading Activity Management Plan Improvement Plan
at Annex A to this document.
This plan will be updated during preparation of the 20012/22 LTP and a reviewedd and revised
during preparation of the 2015/25 LTP to ensure that it meets the needs n determined by the
revised Community Outcomes
that will bee adopted by the Council for that Plan.
9.2
Public
Consultation
The Council intends to consult the public only on the Customer Levels of Service detailed in
Appendix B. Consultation on the t funding and on new works associated with this plan will occur
through the Long Term Council Community Plan and Annual Plan and Budget processes.
10
Improvement Plan
The Asset management Improvement plan is at Appendix U, it is a compiled from the
improvement actions listed in each appendix.
Version 3.0
Sectionn 9 Business Improvement
Page 25
Roading Activity
Management Plan
This page is intentionally blank.
Page-26
Section 10 Improvement Plan Version 3.0
Roading Activity Managementt Plan
Annex I
List of Appendices
Appendix A
Overview of the
Activity. — incorporates:
An Overview of every Separate Significant part of the Activity”
An outline of How the Council Develops and Delivers the Activity
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Appendix J
Appendix K
Appendix L
Appendix M
Appendix N
Appendix O
Appendix P
Appendix Q
Appendix R
Appendix S
Appendix T
Appendix U
Appendix V
Future Planned
Levels of Service
Asset Valuations
Risk
Maintenance and Operations
Future Renewals' Requirements
Depreciation and Decline inn Service Potential
Future Demands and Trends and New Works
Development Contributions
s and Financial Contributions
Debt and Loan Servicing
Asset Disposals
Income, Fees, Charges andd Funding Policy
Summary of Future Overall Financial Requirements
Resource Management Matters and Property
Land Transportt Management Act Matters
Demand Management
Significant Effects
Growth, Significant Forecasting Assumptions, Uncertainties
Legislative and Other Requirements
Stakeholders and Consultation
Continuous Improvement Programme
Overview of Roading Management and Standards
Appendix W Special Cultural Considerations
Appendix X
Glossary of Terms
Version 3.0
Annex I List of Appendices
Page I-1
Roading Activity
Management Plan
This page is intentionally blank.
Page I-2
Annexx I List of Appendices Version 3.0
Roading Activity Managementt Plan
Annex III
Financial Summary
The financial summary appears on the following pages. Because they t are prepared separately
from this document the following pages may not conform to the formatting and other
conventions of this plan.
Version 3.0
Annex II Financial Summary
Page II-1
Roading Activity
Management Plan
This page is intentionally blank.
Annex II II
Change
in Network Service
e
Potential
Review of the network shows that there iss currently no
significant visible v maintenance backlog.
The most recent asset valuation, and consequent depreciation provisions, wass carried out using
the same useful lives and other data that were used in
the preparation of this plan.
The change in the
service potential of the network is assessed by subtracting annual
depreciation charges from the
total cost off renewals, the forecast changes c are illustrated by the
following chart
Figure
5 Forecast Change in Network Service Potential 2009-100
Link: [AMP Budgets HDC_12_13 v3_6_8.xlsm]Renew_Summary > $C$208
This chart shows that annual value of asset renewals over the planning period will exceed the
annual value of deprecation charges in each of those years. This is likely to bee the result of a
number of factors
including:
Discrepancies between
the lives being achieved
in practice and those used for asset
valuations resulting in lower estimates of annual depreciation.
Discrepancies between
the replacement costs obtained in practice p and those used for f
asset valuations; resulting in lower estimates of
annual depreciation.
The current state of the
network andd the proportion of assets that are currently due for f
renewal
The values of these predictedd changes, and their accumulated values, need too be considered in
relation to the total replacement value of the network. This comparison is madee in Figure 6
below
Figure
6 Forecast Percentage Change in Networkk Service Potential 2009-10
Link: [AMP Budgets HDC_12_13 v3_6_8.xlsm]Renew_Summary > $C$240
Theree are small increases in service potential of around 0.6% eachh year, the significant increase
in 2010/11 is the result of the planned reconstruction of Amberley Beach Road. This chart
suggests that at worst there will be no significant decline in the service potential of the network
and that it may possibly increase. However work needs to be donee to eliminatee the potential
discrepancies outlined above before this prediction can be relied on. o
Continual review is required to
ensure:
That the potential of the
asset is not
Either being “mined”” or “stripped”
Or that renewal work is being carried out before it is necessary; and
That it is being maintained in a suitable state to the benefit of o current and future users
while attributing costs fairly to each group.
It will be necessary to continue ensuring that the lives and costs used in the asset valuations
match
those being achieved and that deterioration rates are well understood u and applied
throughout the asset management process, including valuations.
Page III-2
Annex III Change in Network
Service Potential
Version 3.0
Roading Activity Managementt Plan
Version 3.0
Annex III Change in Network Service Potential
Page III-3
Annex IV
Planned
New Works
Roading Activity Managementt Plan
The data on the following pages is the same as thatt included with Appendixx H. It is repeated
here to enhance understanding of the programmes
and because of the significance of new
works
to the Council
The items financial summary appears on the following
pages.The forward programmes were
prepared in a spreadsheet and do not necessarily conform to the numbering n and other
conventions of this plan. They
appear on the following
pages
Version 3.0
Annexx IV Planned New
Works
Page IV-1
Roading Activity
Management Plan
This page is intentionally blank.
Page IV-2
Annexx IV Planned New Works Version 3.0
Roading Activity Managementt Plan
Year 0 Description of Works
Currrent
2011/12
Seal Extension
- No
Programme
- Total seal extension
Seal Widening
- Other Costs:
- Total seal widening
Minor Works -local roads
- Other Costs:
- Total minor works -local roads
Reconstruction and Realignment
- No
Programme
- Total reconstruction and realignment
New Cycleways
- No
Programme
- Total new cycleways
Seal Widening - Special Purpose Road
- No
Programme
- Total seal widening - special purpose road
Reconstruction - Special Purpose Road
- No
Programme
- Total reconstruction - speci al purpose road
- Total Subsidised New Works
2012/13 Year 2
2013/14
-
-
$104,500
$104,500
$262,590
$262,590
-
-
-
-
-
-
-
-
-
-
$104,500
$104,500
$262,590
$262,590
-
-
-
-
-
-
-
-
$367,090 $367,090
Year 3
2014/15
-
-
$104,5000
$104,5000
$262,590
$262,590
-
-
-
-
-
-
-
-
$367,0900
Financial Forecast New Unubsidised Works
Year 0
Currrent
2011/12
Description of Works
2012/13 Year 2
2013/14
Year 3
2014/15
Minor Seal Extension
- Dust Sealing- Allows for one 200m frontage @
50:50 cost sharing ( recovery shown above )
- Total minor se al extension
$25,000
$25,000
$25,000
$25,000
$25,0000
$25,0000
Major Seal Extension
- No
Programme
- Total major se al extension
Miscellaneous New Works
- No
Programme
- Total miscellaneous new works
Loan Repayments
- No
Programme
- Total loan repayments
- Total Unubsidised New
Works
-
-
-
-
-
-
$ 25,000
-
-
-
-
-
-
$25,000
-
-
-
-
-
-
$25,0000
Version 3.0
Annexx IV Planned New
Works
Page IV-3
Annex V
Setting the Level of Roading
Asset Management
The report on the following pages discusses the issues behind establishing the appropriate
level of asset management for the District’s roads and recommends an appropriate level. The
Council adopted this recommendation on 27 November 2008 at an ordinary Council meeting.
The report does not necessarily conform to the numbering and other conventions of this plan.
Page V-1 Annex V Setting the Level of Roading Asset Management Version 3.0
This page is intentionally blank.
Page V-2 Annex V Setting the Level of Roading Asset Management Version 3.0
January 2009
Final
Page 1
Annex V Setting the Level of Roading Asset Management
Version 3.0
This
page is intentionally blank.
Qualityy Record
Sheet
Hurunuii Districtt Councill
Selecting the
Appropriate AM Level
Issue Information
Issue Purpose
Issue Date
Version Number
Final
30 January
2009
1.0
Authorisation
Hurunui District Council
Date
Prepared By
Reviewed By
Report Number
Bruce Yates, Engineering Services Manager
4 September 2008
Grant Holland
Andrew Iremonger
64-026-1007
Page 2
Final
Annex V Setting the Level of Roading Asset Management
January 2009
Version 3.0
Roading Activity Managementt Plan
TABLE
OF CONTENTS
1.0
2.0
3.0
4.0
5.0
6.0
1.1
1.2
1.3
2.1
2.2
2.3
2.4
2.5
3.1
3.2
4.1
4.2
5.1
5.2
5.3
5.4
6.1
6.2
6.3
6.4
INTRODUCTION
5
Purpose of this Report ..................................................................................................
5
Assessment Methodology .............................................................................................
5
Definition of
‘Core Plus’ Asset Management Practice ..................................................
6
INITIAL RISK SCREEN
– DISTRICTT POPULATION
8
Overview of
New Zealand City and Town Populations .................................................
8
New Zealand Main and Secondary Urban Areas...................
.......................................
8
Analysis by
Community Population ...............................................................................
9
Analysis by
District Total Populationn ................... ........................................................ 10
Initial Risk Screen - Conclusion .................................................................................. 10
CONSIDERATION OF DISTRICT WIDE RISK FACTORS
11
Identification of District Wide Factorss .......................................................................... 11
Consideration of Districtt Wide Factors - Conclusion .................................................. 12
SECTION 2.2.4 DETAILED FACTOR ANALYSIS
13
Detailed Analysis Hurunui District Council Asset Groups ........................................... 13
Final Appropriate Asset Management Level Determination ....................................... 14
ASSET MANAGEMENT
POLICY STATEMENTS
17
Land Transport ............................................................................................................ 17
Utilities ......................................................................................................................... 20
Community Services (Parks & Property) .................................................................... 23
Solid Waste
................................................................................................................. 26
DETAILED ANALYSIS OF ASSET GROUPS
29
Land Transport ............................................................................................................ 31
Utilities ......................................................................................................................... 34
Community Services ................................................................................................... 39
Solid Waste
................................................................................................................. 42
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 3
Version 3.0
Selecting the Appropriate AM Level
TABLE
OF TABLES
Table 2. 1: Extraction
of New Zealand City and Town Populations fromm WINZ Database ..................... 8
Table 2.2: 2006 Census Main and Secondary Urban Areas .................................................................. 8
Table 2.3: Hurunui District Council ......................................................................................................... 9
Table 2.4: Total District Population ...................................................................................................... 10
Table 3. 1: Identification of District Wide Riskk Factors .......................................................................... 11
Table 3.2: Examples
of District Wide Risk Factors .............................................................................. 12
Table 4. 1: Detailed Analysis Hurunui District t Council Asset Groups ................................................... 13
Table 5. 1: Land Transport Activity Factor Assessment Results ........................................................... 17
Table 5.2: Utility Factor Assessment Resultss ................... .................................................................... 21
Table 5.3: Community Services Factor Assessment Results .............................................................. 24
Table 5.4: Solid Waste Factor Assessment Results ............................................................................ 26
Table 6. 1: Land Transport Detailed Asset Management Practice Assessment ................................... 31
Table 6.2: Utilities Detailed Asset Management Practice Assessmentt ................... ............................. 34
Table 6.3: Community Services Detailed Asset Management Practicee Assessment .......................... 39
Table 6.4: Solid Waste Detailed Asset Management Practice Assessment ........................................ 42
TABLE
OF FIGURES
Figure 1.1: Methodology for Determining Appropriate Asset Management Level ................................. 6
Page 4
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
1.0
INTRODUCTION
Authorities that manage assets on behalf of their communities need to define ann appropriate
level of
asset management for the assett or activity being managed. For some authorities and assett / activity
groups this may not necessarily be fully comprehensive ( advanced) asset a management practices.
Section 2.2.4 of the International Infrastructure Management Manual (IIMM)) contains a section
regarding core and comprehensive (advanced) asset management practices. p The part of this section
that deals with selecting the Appropriate Asset Management Level is replicated below:
Selecting the Appropriate AM Level (from IIMM Section 2.2.4, page 2.9)
Selecting
the appropriate asset management level for an organisation, which for activities or asset
types may not need
to progress beyond a core approach, will depend d on a number of factors,
including:
• The costs and
benefits to the organisation
• Legislative equirements
• The size, condition and complexity of the assets
• The risk associated with failures f
• The skills and
resources available to the organisation
• Customer expectations
1.1
Purpose of this Report
The purpose of this report is to outline the methodology
used by Hurunui Districtt Council to select an
Appropriate AM Level for each off the District’ ’s asset groups.
This methodology is
required to
be logical and robust, and able too be used byy Council to
adopt a
position or policy on the appropriate level of asset management sophistication for each asset group.
The methodology and Section 2.2.4 Appropriate AM Level adoptedd will be scrutinised by Council’s
Auditors and the methodology, and subsequent determination must be b robust enough to withstand this
scrutiny. Assessing
and adopting an Appropriate AM Level will allow a Council to focus resources r
accordingly and enhance prudent management of community infrastructure.
1.2
Assessment Methodology
The assessment methodology, developedd by Waugh Infrastructure Management Limited, in
conjunction with a number of local authority partners, is as follows:
1. Adopt a risk based approach using district population and largest town size as a proxy for risk
and an initial screen
2. Determine an initial position based onn the population risk screening
3. Modify initial
position based on the District wide risk factors
4. Examine each asset group and conduct a furtherr analysis based on the Section 2.2.4 factors:
a. Costs and Benefits
b. Legislative Requirements
c. Size, condition, complexity of assets
d. Risks associated
with failuress
e. Organisational skills and resources
f. Customer expectations
g. Sustainability (additional to IIMM list)
5. Adopt a Final Appropriate AM Level position for each asset group g based on the detailed factor
analysis
6. Use a detailed analysis table t to plot the adopted position
7. Use the detailed analysis of assett groups to identify gaps between adopted appropriate
practice and current practice
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 5
Version 3.0
Selecting the Appropriate AM Level
Figure 1.1:
Methodology for Determining Appropriate Asset Management Level
METHODOLOGY FOR DETERMINING
APPROPRIATE ASSET MANAGEMENT LEVEL
ASSET FACTORS
INITIAL
ASSESSMENT
DISTRICT WIDE FACTORS
Costs and
Benefits
Adopt Final Appropriate Asset
Management Level for each
asset group
Determine District
Population
Determine size of
largest town
Determine Initial
AM Level Position
Determine District
Wide Risk Factors
Modify Initial AM
Level Postion
Legislative
Requirements
Asset size,
condition,
complexity
Failure Risks
Organisational
Skills and
Resources
Customer
Expectations
Sustainability
INTERNAL
MANAGEMENT
Undertake detailedd analysis of
each asset group for internal
management and
direction
purposes
Assess each asset group by
these factors
1.3
Definition of ‘Core
Plus’ Asset Management Practice
This report introduces the concept of ‘Core Plus’ asset management practice. The IIMM in
Section
2.2.4 indentifies two levels of asset management practice; core and comprehensive (also referred to
as Advanced). For
many asset owning authorities their desired practice levels, based on their
infrastructure drivers
will be above core practice (as defined in the IIMM) butt may well be below
comprehensive asset management practice.
For this situation the concept of ‘ Core Plus’ asset management practice has beenn introduced.
The genesis of the thinking around this level of asset managemen
t practice goes back to the New
Zealand Infrastructure Asset Management Manual (June
1998), which was superseded by the t IIMM.
Section 2.3 of the 2006 Edition covered thee topic of Basic and Advanced Asset Management. The
table on page 2.22 suggested six
stages of asset management improvement as follows:
Stage 1: Strategy Development
Stage 2: Basic Asset Register
Stage 3: Basic Technical Assett Management
Stage 4: Improved Maintenance Management
Stage 5: Introduce Advanced Asset Management Techniques
Stage 6: System Optimisation (fully optimised decision
making and advancedd asset management
practice)
This approach outlined in the
1998 Manual anticipated graduated stages of improving asset
management practice. ‘Core Plus’ asset management practice covers Stagee 4 and 5 using this
approach.
So what is ‘Core Plus’ asset management practice? Is it:
• Core, plus one or two advanced categories fully compliant.
Page 6
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
• Core, plus with over 50% of advancedd categories fully compliant
• Core, plus some advanced categoriess substantially compliant
• Core, plus most advancedd categories. substantially or fully compliant
The answer is it could be any one of these and there may not be an appropriatee single response due
to the variations within any organisation. ‘Core Plus’ asset management practice is above core and
below fully compliant
with comprehensive practice.
Therefore, each asset owner needs to consider the Appropriate AM Level on ann activity basis, taking
into account national, regional and local drivers of asset management
t practice forr that asset.
The recommended methodology
for assessing this is to use the Detailed Asset Managementt Practice
Assessment Tables included in Section 5.0 of this report to assess appropriate practice levels
for each
activity or asset group. These tables cover detailed analysis of the t followingg asset management
practice areas:
• Description of assets
• Levels of Service
• Managing Growth, including sustainability strategies
• Risk Management
• Lifecycle decision making
• Financial forecasts
• Planning assumptions, linkages, and confidence levels
• Improvement
programmes
• Planning qualifications
• Commitment by asset owner
For the asset owner where the
overall practice has been set at
variations of practice
by asset or activity group.
‘Core Plus’ ’ there still
could be
It is possible for some organisations that their asset management practice for some activities
may be
required at nearly comprehensivee practice (e.g. Land Transport), while their practice for others may be
nearer to
core practice (e.g. Parks and Reserves).
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 7
Version 3.0
Selecting the Appropriate AM Level
2.0
2.1
INITIAL RISK
SCREEN – DISTRIC
CT POPULATION
Overview
of New Zealand City and Town Populations
In orderr to undertake an initial assessment on the
District Population, Waugh Infrastructure
Management Ltd extracted the New Zealand city and town populations from the WINZ data base.
Analysiss of this dataa shows that New Zealand is a nation of few metropolitan areas, a range
of large
towns and small cities and many small towns. From this analysis it is suggested an initial
determination of Core and Comprehensive AM Levels can be made.
It is acknowledged
that while populationss provide a
appropriate for broader activities such as Land Transport.
guide for
community
activities, it is less
Table 2.1: Extraction of New Zealand Cityy and Town Populations from WINZ Database
Number Towns
10
34
31
559
Population
90,000 and above
10,000 – 90,000 5,000 – 10,000 Less than 5,000 WIML Suggested Initial AM A Level
Comprehensive
(Advanced)
Core Plus
Core
Core
Notes
Auckland split by
Councils
Compiled
from: http://www.drinkingwater.org.nz/supplies/Suppliescompliance.asp 16 July 2008
2.2
New Zealand Main
and Secondary Urban Areass
The Table below contains an analysis of Neww Zealand’s main and secondary urban areas, as defined
by Statistics NZ. It can be seen that there are no communities withinn Hurunui District, listed within the
main and
secondary urban areas
identified by Statistics NZ. This suggests that based on a population
risk screen Hurunui’s urban areas should be aiming for Core as an appropriate level of asset
management practice.
Table 2.2: 2006 Census Main and Secondary Urban Areas
Main and Secondary Urban Areas for the Census Usually Resident R Population Count
Main/Secondary Urban
Main Urban Areas
Areas
Populations
Total New Zealand
4,027,947
Total Main Urban Areas
2,892,831
Total Secondary Urban Areas
243,081
Other
892,029
UA 004 Central Auckland Zone
Main Urban Areas
395,982 Comprehensive
UA 005 Southern Auckland Zone
Main Urban Areas
371,658 Comprehensive
UA 022 Christchurch
Main Urban Areas
360,768 Comprehensive
UA 002 Northern Auckland Zone
Main Urban Areas
248,112 Comprehensive
UA 003 Western Auckland Zone
Main Urban Areas
192,339 Comprehensive
UA 020 Wellington Zone
Main Urban Areas
178,680 Comprehensive
UA 006 Hamilton Zone
Main Urban Areas
155,262 Comprehensive
UA 023 Dunedin
Main Urban Areas
110,997 Comprehensive
UA 009 Tauranga
Main Urban Areas
108,882 Comprehensive
Page 8
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
Main and Secondary Urban Areas for the Census Usually Resident R Population Count
Main/Secondary Urban
Main Urban Areas
Areas
Populations
UA 018 Lower Hutt Zone
Main Urban Areas
UA 016 Palmerston North
Main Urban Areas
UA 013 Hastings Zone
Main Urban Areas
UA 021 Nelson
Main Urban Areas
UA 012 Napier Zone
Main Urban Areas
UA 010 Rotorua
Main Urban Areas
UA 014 New Plymouth
Main Urban Areas
UA 001 Whangarei
Main Urban Areas
UA 019 Porirua Zone
Main Urban Areas
UA 024 Invercargill
Main Urban Areas
UA 015 Wanganui
Main Urban Areas
UA 025 Kapiti
Main Urban Areas
UA 017 Upper Hutt Zone
Main Urban Areas
UA 011 Gisborne
Main Urban Areas
UA 110 Blenheim
Secondary Urban
Areas
UA 113 Timaru
Secondary Urban
Areas
UA 101 Pukekohe
Secondary Urban
Areas
UA 103 Taupo
Secondary Urban
Areas
UA 109 Masterton
Secondary Urban
Areas
UA 107 Levin
Secondary Urban
Areas
UA 104 Whakatane
Secondary Urban
Areas
UA 112 Ashburton
Secondary Urban
Areas
UA 007 Cambridge Zone
Main Urban Areas
UA 008 Te Awamutu Zone
Main Urban Areas
UA 106 Feilding
Secondary Urban
Areas
UA 102 Tokoroa
Secondary Urban
Areas
UA 114 Oamaru
Secondary Urban
Areas
UA 105 Hawera
Secondary Urban
Areas
UA 111 Greymouth
Secondary Urban
Areas
UA 115 Gore
Secondary Urban
Areas
Source: http://www.stats.govt.nz/census/census-outputs/default.htm 19 August 2008
97,149 Comprehensive
76,032
62,118
56,364
56,286
53,766
49,281
49,080
48,396
46,773
38,988
37,347
36,402
32,529
28,527
26,886
22,515
21,291
19,494
19,134
18,204
16,836
15,192
14,454
13,890
13,530
12,681
10,776 Core
9,672 Core
9,648 Core
2.3
Analysiss by Community Population
The reality of New Zealand local authority asset management practice is that it is conducted at a
Council level in a similar manner. The requirements of
the largest population centre in the
Council
tends to set the appropriate practice level. Hurunui District Council’ss town population is shown in the
table below. Cheviot is the largest town, and based on the initial determination in 2.1 suggests a
‘Core’ asset management practice level is appropriate.
Table 2.3: Hurunui District Council
Town Rank
(All NZ Towns
Town Name
150 Cheviot
160 Hanmer
171 Amberley
231 Amberley Beach
WINZ
Population
1,640
1,500
1,300
630
HDC
Population
Data
540
WIML Assessed Initial
AM Practice Level
Core
Core
Core
Core
January 2009
Final
Page 9
Annex V Setting the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
HDC
Town Rank
(All NZ Towns
239 Town Name
Motunau, Greta, Scargill
WINZ
Population
600
Population
Data
WIML Assessed Initial
AM Practice Level
Core
258 Leithfield
500
Core
289 Culverden
420
Core
290 Waiau Township
420
Core
439 Leithfield Beach
150
Core
Source: http:// /www.drinkingwater.org.nz/supplies/Suppliescompliance.asp 188 August 2008
As some
water supplies include rural and urban areas the community populations may be overstated
in the WINZ database.
2.4
Analysiss by District Total Population
Analysiss of the 2006 Census results of Council total population gives the following results for the
following
sample Councils. The sample set has been selected to illustrate a range of different sized
Councils.
Table 2.4: Total District Population
Council
Rodney
Timaru
Gore District
Hurunui
District
2006
Population
85,845
42,000
11,763
10,083
Council Size
Rank (72
Authorities)
Waimate
7,041
68 Core
Source: http://www.stats.govt.nz/census/census-outputs/default.htm
AM Practice Level Indicated by Size
(WIML Estimated Assessment)
11 Cor re Plus, effectively comprehensive
areas/activities
25 Cor re Plus, withh near comprehensive
areas/activities
58 Core
59 Cor re
19 August 2008
in some
in some
The mix of total District population and the size of the largest population centre provides a good initial
screen for the risks associated with asset service delivery. It is acknowledged that Land Transport is
managed
on a network and regional basis and the relevance of population is lower than for other
activities. This initial screen will be modified by consideration of the other factors as detailed in
Section 3.
2.5
Initial Risk Screen
- Conclusion
Based on this initial screen of urban areas, all council population centres and total district population
the suggested level of appropriate asset management practice for Hurunui District
Council is ‘ Core’.
Page 10
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
3.0
CONSIDERATION
FACTORS
OF
DISTRI
CT
WIDE
RISK
3.1
Identification of District Wide Factors
Following the initial population screen basedd on appropriate practicee for the largest population centre
in Hurunui District, further consideration needs to be given to other District Wide Risk Factors that may
affect the
initial assessment of Core.
The District Wide Risk factors identified in a workshop of Hurunui District Council’ ’s Asset Managers on
17 September 2008 include:
1.
2.
Large geographic area with small rating base
Funding – ncluding financial assistance from NZ Transport Agency A
3.
4.
5.
High Level of Service expectations -
Influence of tourists
Land use change
sometimes unrealistic
6. Seasonal impacts on roading
7.
Resourcing and the labour market
8. Oil prices
9. Climate Change
10.
11.
Demand for Recreation Facilities
Proportion of unsealed roads
12. Geographic issues and fault lines
13. Overweight vehicles and potential forr fifty tonne trucks
14. Changes in legislation and regulations
The relative importance of thesee factors wass considered as high or, medium in terms of each
activity,
the results are shown
below.
Table 3.1:
Identification of District Wide Risk Factors
Utilities
Land
Transport
Reserves &
Property
Solid Waste
Large Geographic Area and Small Rating Base
Funding
– including
NZTA financial assistance
H
M
H
H
H
H
H
M-H
January 2009
Final
Page 11
Annex V Setting the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Utilities
Land
Transport
Reserves &
Property
Solid Waste
High Level of Service expectations
M-H
M-H
M-H
M
Changes in Legislation and Regulation
Demand for Recreation Facilities
M-H
L
M
M
M
H
M
L
Oil Prices
Influence of Touristss
L
L
H
L
L
M-H
M
M-H
Seasonal Impacts on Roading
Proportion of Unsealed Roads
L
L
L
M
M-H
L
L
L
Land Use Change
Resourcing and the
Labour Market/
L
L
M
L
L
L
L
L
Climate
Change
Geographic issues and fault lines
L
L
L
L
L
L
L
L
Overweight vehicles
and potential for 50 tonne trucks
L
L
L
L
By way of comparison, the Table
below outlines the assessed District wide risk factors for the sample
Council’s
listed in Table 2.4.
Table 3.2: Examples of District Wide Riskk Factors
Council Population
Other Factors
Appropriate AM
Determination
(WIML Estimated
Assessment)
Rodney
Core
Plus,
effectively
comprehensive
Rapid growth, heavily
influencedd by
Auckland dynamics
Dispersed urban areas
Tourism/holiday destination
Comprehensive
Timaru
Core Plus
Geraldine – International Visitors;
Major industriess
(Fonterra
Clandeboye);
freight hub;
Regionally
significant
Primary industry growth and
subsequent
impacts
transportation
network
Core Plus
Gore
Core
None
Core
Hurunui
Core
Large geographic areaa with few small s
communities, growth of non-resident
populationn in Hanmer Springs
Waimate
Core
None
Core
3.2 Consideration of District Wide Factors - Conclusion
Based on the identified district wide risk factors, the suggested level of o appropriate asset management
practice for Hurunui District Council is ‘Core’.
Page 12
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
4.0
SECTION 2.2.4 DETAILED
FACTOR ANALYSIS
Following the initial
population screen and assessment of District wide risks, a more
screening was developed for each individual asset group for the District.
detailed
4.1
Detailed Analysis Hurunui District Council Asset Groupss
A more detailed analysis of where the sophistication of
Hurunui District Council asset management
should be, uses the criteria outlined in Section 2.2.4 of the IIMM as a basis.
Table 4.1:
Criteria
Population
District Wide
Risks
Costs and
Benefits
(Source:
Operating Costs
HDC Annual
Plan 2008-09)
Legislative
Requirements
Size, Condition,
Complexity of
Assets
Detailed Analysis Hurunui District Council Asset Groups
Land Transport
Utilities
Core
Core
$7.0 M*
(29% of total HDC
operating costs)
*includes half of local
facilities and
maintenance costs
Compliance
approach
ncluding highh
level of regional
involvement
Changing regime
under new
legislation
Large rural
network with
distributed small
communities
$5.1M
(21%
of total HDC
operating costs)
Compliance
approach –
increasing water
quality
requirements
(NZDWS)
Water quantity
issues increasing,
along with
increasing
demands from
pNRRP
Widee range of
small urban and
largee rural
schemes
Community
Services
(Parks & Property)
$1.5M
(6% of total t HDC
operating costs)
Compliance
approach Specific
LOS requirements
for some groups
Simple approach
to rangee of assets
Solid Waste
$0.8M**
(3% of total HDC
operating costs)
** excludes household h
collection costs
Compliance and
level of service
approach followed f
which is generally
ahead of
legislation
Few assets – five
transfer stations,
closed landfills
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 13
Version 3.0
Selecting the Appropriate AM Level
Criteria
Risks
Associated with
Failures
Land Transport
Moderate level of
risk
Some critical
routes, bridges
and demand
issues
Utilities
Highh risks
identified with
water supplies ,
average level of
risk for
wastewater
The supply of
stock water
essential for stock
welfare and fire
fighting
Community
Services
(Parks & Property)
Generally lower
and isolated level
of risk
Solid Waste
Low level of risk
Management
issues arise
through
subdivision and
changes in
ownership
Organisational
Skills and
Resources
Customer
Expectations
Sustainability
Drainage assets
affect some
communities flood
risk
Hurunui District Council comprises a small organisation serving a large area of
small communities
The organisation is comfortably resourced with a range r of experienced staff, staff
are stable and
there are very few vacancies. Services are delivered through a
combination of in-house teams and Contractors
Levels of service are well understood and an increase in expectations has been
observed over time
This increasee is particularly evident in Hanmer Springs and rural-residentia
areas
where ‘City values’ reflected in expectations of those who shiftt into the district from
Christchurch
No Corporate
Policy at this stage, part of AMP andd planning process at activity
level
Influenced by
Targets set in
LTMA, NZTS and
2005 and being
RLTS
reviewed in 2008
Appropriate
AM Level
Core Plus
Coree
Core
Recycling
underway and
ahead of
expectations of
Waste
Minimisation Bill
Core
4.2
Final Appropriate
Asset Management
Level Determination
Page 14
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
The initial population
screen for Hurunui District Council, using urban area, all township populations,
and total district population showed that asset management practice should s be Core.
The examination of individual factors is summarised in Table 4.1: Detailed D Analysis Hurunui District
Council Asset Groups above and
commentary on these factors is as follows: f
Costs and Benefits
The Land Transport and Water & Wastewater budgets are the largest in Council and represent higher
risks if AM practice is not at an appropriate level. These budgets also a allow more scope to
develop
asset management
practice as appropriate. . The value
of the Roading assetss at $167M (DRV) is
considerably higher the value of water and wastewater assets ($39MM DRV). Solidd Waste and
Parks &
Property
represent significantly smaller areas of expenditure, and are associated with less risk
exposure.
Legislative Requirements
Hurunui District Council policy is
to meet minimum legislative requirements, or exceed requirements
where deemed appropriate and cost effectivee through Levels of Service Consultation.
Size, Condition and
Complexity of Assets
There are a range of assets spread across the large district. In particular the roading network and
rural water supplies are extensive with onlyy a small rating base. While the assets are not highly
complex
the isolated
nature of the communities requires a specific approach.
Risks Associated with Failures
Overall risks associated with asset failure have been assessed to be b average apart from water and
wastewater and drainage. Failure of waterr systems would lead too a range of issues, wastewater
system failure has public health and environmental consequences.
This suggests a higher level of
risk management practice for water and wastewater, while drainagee is integral to manage flood f risk.
Public Health risk management is i already legislatively mandated. The risk of flooding is highh and the
district’s drainage systems are essential to the well-being
of the community.
Organisational Skills and Resources
Hurunui District Council comprises a small organisation serving a large area of small communities.
The organisation is comfortably resourced with a range of experienced staff, staff numbers are stable
and there are few vacancies. Services are delivered through a combination of f in-house teams and
Contractors. This approach would be consistent with a ‘Core’ approach.
Customer Expectations
The District has a range of community assetss that are of a high standard and the community is
justifiably
proud of them, and has
high expectations of the
development and maintenance.
Levels of service are
well understood and an increase in expectationss has been observed over time.
This increase is particularly evident in Hanmer Springs and rural-residential areas where ‘City values’
are reflected in expectations of those who shift into the district from Christchurch.
Overall customer expectations are judged too be medium to high and the trend off increasing customer
expectation is likely. This suggests a requirement for well developed asset management practice to
consistently meet community expectations in the long term.
Sustainability
Hurunui District Council is following the sustainability regimes of the Land Transport Management Act
2003, NZTS and RLTS requirements (including subsequent amendments andd revisions) for Land
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 15
Version 3.0
Selecting the Appropriate AM Level
Transport; otherwisee Council is still in the process of developing itss sustainability policies.
include incorporating
legislative changes andd the any national or regional policies or plans.
This will
Any impact of these on asset management practice will be incorporated into the
Management Policies.
next review
of Asset
Conclusion
Having considered all these factors, for eachh asset / activity group itt is apparentt that Hurunui District
Council should be managing it’s assets at thee following levels:
Activity
Final
Appropriate
AM Level
Comment
Land Transportt
Core
Plus
A more
sophisticated
approach than core
with an emphasis
on managing the
lifecycle costs off
assets and the
communities ability
to fund long term
costs
Utilities
Core
Community
Services
(Parks & Property)
Core
Solid Waste
Core
Page 16
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
5.0
ASSET
MANAGEMENT POLICY
STATEMENTS
The Asset Management Policy Statements for the Activities assessedd follows.
5.1
Land Transport
The Hurunui Districtt Council Asset Management Policy Statement for f the Landd Transport Activity is
outlined below. It is
intended that this Policy Statement be added to the introduction of the Activity
Management Plan, to
set the direction of the Land Transport Asset Management process.
5.1.1
Objective of the Land Transport Asset Management Policy
The objective of the
Hurunui District Council’s Asset Management Policy for r the Land Transport
Activity is to ensure that Council’ s service delivery is optimised to deliver agreed community outcomes
and levels of service, manage related risks, and optimise expenditure over the entire life cycle of the
service delivery, using appropriate assets as required.
The Asset Management Policy equires that the management of assets be in a systematic process to
guide planning, acquisition, operation and maintenance, renewal and disposal of the required assets.
Delivery of service is
required to
be sustainable in the long term and deliver onn Council’s economic,
environmental, social, and cultural objectives.
This Asset Management Policy sets the appropriate level of asset management
Land Transport Activity.
practice for Council’s
5.1.2
Asset Management Policy Principles
The following principles will be used by Council to guide asset management planning and decision
making:
• Effective consultation to determine appropriate Levels of Service
• Ensuring service delivery needs form the basis of asset management
• Integration of
asset management with corporate, financial, business b andd budgetary planning
using activity management plans and Council’s LTCCP to demonstrate thiss
• Integration with neighbouring authorities and other agencies including NZZ Transport Strategy,
National Land
Transport Programme,
and the Regional Land Transport T Strategy
• Integration of
asset management within Council’ s strategic, tactical and operational planning
frameworks
• Informed decision making
taking a lifecycle management and inter-generational approach to
asset planning
• Transparent and accountable asset management
decision making
• Sustainable management providing for present needs whilst sustaining resources for f future
generations
5.1.3
Policy Linkages to Other Plans
This Asset Management Policy links to Council’s LTCCP, the Canterbury Regional Land Transport
Strategy, and Land Transport Activity Plan.
5.1.4
Structured
Assessment of Asset Management Practice
Table 5.1:
Criteria
Land Transport
Activity Factorr Assessment Results
Assessment Commentary
January 2009
Final
Page 17
Annex V Setting the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Criteria
Assessment
Population
Core
District Wide
Core
Risks
Costs and $7.0 M*
Benefits (29% of total
HDC
operating
costs)
Legislative
Requirements
Size, Condition,
Complexity of
Assets
Risks
Associated with
Failures
Organisational
Skills and
Resources
Customer
Expectations
Compliance
approach
Large
network,
otherwise
typical
Moderate
level of risk
Average
Average +
Commentary
The initiall population risk screen for urban areas, all township
populations, and total district population showed that assett
management practice
should be ‘Core’
Based on the identified district wide risk factors, the suggested
level of appropriate asset management practice should be ‘Core’
The Land Transport budget is the largest in Council and
representt higher riskss if AM practice is not at an appropriate level.
These budgets also allow more scope to develop asset
management practice
as appropriate. The value of the Roading
assets at $167M (DRV) is considerably higher r the value off water
and wastewater assets ($39M DRV)
*includes half of local facilities and maintenance costs
Hurunui District Council policy is too meet minimum legislative
requirements, or exceed requirements where deemed appropriate
and cost effective through Levels of Service Consultation.
There
are considerable changes under new n legislation which requires a
high level of regional involvementi
Large rural network with distributed small communities
Seasonal variations and changes in land use impact on levels of
service and maintenance requirements
Overall risks associated with asset failure havee been assessed to
be moderate. There are some critical routes, bridges and
demand issues
Increasingg heavy vehicles and thee potential forr fifty tonne truck t
are a real risk to the network
Hurunui District Council comprisess a small organisation serving a
large areaa of small communities. iss a relativelyy small local
authority
The organisation is comfortably resourced withh a range of
experienced staff, staff are stable and there are very few
vacancies. Services are deliveredd through a combination of inhigh
house teams and Contractors
This approach would be consistent with a ‘Core’ approach
The District has a range of community assets that are of a
standard and the community is justifiably proudd of them, and has
high expectations of the development and maintenance
Levels of service are well understood and an increase in
expectations has been
observed over o time
This increase is particularly evident in Hanmerr Springs and
rural-
of
residential areas where ‘City values’ reflected in expectations
those whoo shift into the district fromm Christchurch
Overall customer expectations aree judged to be medium to
high
and the trend of increasing customer expectation is likely. This
suggests a requirement for well-developed asset management
practice too consistently meet community expectations in the long
term
Page 18
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
Criteria
Sustainability
Final AM
Level
Assessment
No
Corporate
Policy at this
stage, part of
AMP and
planning
process at
activity level
Core Plus
Commentary
Hurunui District Council is following the sustainability regimes of
the Land Transport Management Act A 2003, NZTS and RLTS
requirements (including subsequent amendments and revisions)
for Land Transport; otherwise Council is still inn the processs of
developing its sustainability policies. This will include
incorporating legislative changes and a the any national or regional
policies or plans
Any impact of these on asset management practice will be
incorporated into the next review of o Asset Management Policies
Analysis of factors suggests that asset management practice
requires a more sophisticated approach a than core with
an
emphasiss on managing the lifecycle costs of assets and the
communities’ ability
to fund long term costs
5.1.5
Implementation and Review of Policy
This Asset Management Policy will be implemented in conjunction with w the 20088 Asset Management
Plans and 2009 LTCCP. This
Asset Management Policy may equire revieww once Council has
completed the development of its
Sustainability Policies.
This next full review of this Asset Management Policy shall be completed in Junee 2011 (3 years) prior
to completing asset plan updates
to support the 2012 LTCCP.
5.1.6
Asset Management Implementation Strategy
Council staff have completed a detailed analysis of appropriate asset management practice within the
guidance
offered by
this Policy. This analysis has examined asset description, levels off service,
managing growth, risk management, asset t lifecycle decision making, financial forecasts, planning
assumptions and confidence levels, improvement programmes, use of qualified persons and
Council
commitment to asset
management planning.
From this detailed analysis Council’s level of achievement and
management practice were identified.
any gaps
in appropriate asset
Asset management practice gaps that weree noted have
been transferred to thee Asset Management
Improvement Programme for action.
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 19
Version 3.0
Selecting the Appropriate AM Level
5.2 Utilities
The Hurunui Districtt Council Asset Management Policy Statement for the Utilities Activity is
outlined
below. The Utilities comprise Communityy Water Supplies, Wastewater, Stormwater and Land
Drainage. It is intended that this Policy Statement be added too the introduction of the
Activity
Management Plan, to
set the direction of the Utilities Asset Management process. .
5.2.1
Objective of the Utilities Asset Management
Policy
The objective of the Hurunui District Council’s Asset Management Policy P for thee Utilities Activity is to
ensure that Council’ s service delivery is optimised to deliver agreed community outcomes and levels
of service, manage related risks, and optimise expenditure over the entire life cycle of the
service
delivery, using appropriate assets as required.
The Asset Management Policy equires that the management of assets be in a systematic process to
guide planning, acquisition, operation and maintenance, renewal and disposal of the required assets.
Delivery of service is
required to
be sustainable in the long term and deliver onn Council’s economic,
environmental, social, and cultural objectives.
This Asset Management Policy sets the appropriate level of asset management
Utilities Activity.
practice for Council’s
5.2.2
Asset Management Policy Principles
The following principles will be used by Council to guide asset management planning and decision
making:
• Effective consultation to determine appropriate Levels of Service
• Ensuring service delivery needs form the basis of asset management
• Integration of
asset management within the Utilities communities of interest and across Council
utilising corporate, financial, businesss and budgetary planning using activity management plans
and Council’s
LTCCP to demonstrate
this
• Integration of
asset management within Council’ s strategic, tactical and operational planning
frameworks
• Informed decision making
taking a lifecycle management and inter-generational approach to
asset planning
• Transparent and accountable asset management
decision making
• Sustainable management providing for present needs whilst sustaining resources for f future
generations
5.2.3
Policy Linkages to Other Plans
This Asset Management Policy links l to, Council’s LTCCP, Utilities Asset A Management Plans
and the
Water and Sanitary Services Assessment. An approach where planning is basedd around communities
of interest is favoured, as this aims to promote an integrated management regime and encourage
efficiencies across the district’s water schemes.
5.2.4
Structured
Assessment of Asset Management Practice
Page 20
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
Council has
undertaken a structured assessment of the appropriate level of asset management practice for thee Utilities assets. This
structured assessment follows the guidance provided in Section 2.2.4 of the International Infrastructure Management Manual. The T results
of this assessment are shown in Table 5.2: Utility Factor Assessment Resultss below:
Table 5.2: Utility Factor Assessment Results
Criteria
Population
Assessment
Core
Commentary
The initiall population risk screen for urban areas, all township
populations, and total district population showed that assett
management practice
should be ‘Core’
District Wide
Risks
Costs and Benefits
Core
$5.1M
(21% of total
HDC
Based on the identified district wide risk factors, the suggested
level of appropriate asset management practice should be ‘Core’
The combined Utilities
budgets comprise the second largest in
Council and represent
higher riskss if AM practice is not at an
appropriate level. These budgets also allow more scope to
operating develop asset management practice as appropriate
costs)
Legislative
Requirements
Compliance
approach –
Hurunui District Council policy is too meet minimum legislative
requirements, or exceed requirements where deemed appropriate
and cost effective through Levels of Service Consultation
There aree increasing water qualityy requirements (NZDWS)) and
water quantity issues arising, along with increasing demands from
pNRRP
Size, Condition,
Large There is a wide range
of small urban and largee rural schemes
Complexity of
Assets
Risks
Associated with
Failures
Organisational
Skills and
Resources
network,
otherwise
typical
Moderate to
High
Average
The waterr supplies include extensive pumpingg and reticulation
assets
Drainage assets are minor but of high h importance
Overall risks associated with asset failure havee been assessed to
be average apart from
water and wastewater w and drainage.
Failure of f water systems would lead to a rangee of issues,
wastewater system failure has public health and environmental
consequences. This suggests a higher h level of risk management
practice for water and wastewater, while drainage is integral to
manage flood risk. Public Health risk management is already
legislatively mandated. The risk of o flooding is high and the
district’s drainage systems are essential to the well-being of the community c
Hurunui District Council comprisess a small organisation serving a
large areaa of small communities
The organisation is comfortably resourced withh a range of
experienced staff, staff are stable and there are very few
vacancies. Services are deliveredd through a combination of in-
house teams and Contractors
This approach would be consistent with a ‘Core’ approach
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 21
Version 3.0
Selecting the Appropriate AM Level
Criteria
Customer
Expectations
Sustainability
Final AM
Level
Assessment
Average +
No
Corporate
Policy at this
stage, part of
AMP and
planning
process at
activity level
Core
Commentary
The District has a range of community assets that are of a high
standard and the community is justifiably proudd of them, and has
high expectations of the development and maintenance.
Levels of service are well understood and an increase in
expectations has been
observed over o time
This increase is particularly evident in Hanmerr Springs and
rural-
of
residential areas where ‘City values’ reflected in expectations
those whoo shift into the district fromm Christchurch
Overall customer expectations aree judged to be medium to
high
and the trend of increasing customer expectation is likely. This
suggests a requirement for well developed asset management
practice too consistently meet community expectations in the long
term
Council iss still in the process of developing its sustainability
policies. This will include incorporating legislative changes
and
the any national or regional policies or plans
Any impact of these on asset management practice will be
incorporated into the next review of o Asset Management Policies
Analysis of factors suggests that asset management practice
should bee Core
5.2.5
Implementation and Review of Policy
This Asset Management Policy will be implemented in conjunction with w the 20088 Asset Management
Plans and 2009 LTCCP. This
Asset Management Policy may equire revieww once Council has
completed the development of its
Corporate Sustainability
Policies.
This next full review of this Asset Management Policy shall be completed in Junee 2011 (3 years) prior
to completing asset plan updates
to support the 2012 LTCCP.
5.2.6
Asset Management Implementation Strategy
Council staff have completed a detailed analysis of appropriate asset management practice within the
guidance
offered by
this Policy. This analysis has examined asset description, levels off service,
managing growth, risk management, asset t lifecycle decision making, financial forecasts, planning
assumptions and confidence levels, improvement programmes, use of qualified persons and
Council
commitment to asset
management planning.
From this detailed analysis Council’s level of achievement and
management practice were identified.
any gaps
in appropriate asset
Asset management practice gaps that weree noted have
been transferred to thee Asset Management
Improvement Programme for action.
Page 22
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
5.3
Community Services (Parkss & Property)
The Hurunui District Council Asset Management Policy Statement forr the Community Services Activity
is outlined below. Community
Services (Parks and Property) comprise Recreation Reserves,
Sportsfields, Playgrounds, Halls
and otherr Community
Buildings, Public Toilets, Cemeteries and
Pensioner Flats. It is intended that t this Policy Statement be added to the introduction of the Activity
Management Plan, to
set the direction of the Community Services Asset Management process.
5.3.1
Objective of the Community Services Asset Management Policy
The objective of the Hurunui District Council’s Asset Management Policy for the Community Services
Activity is to ensure that Council’ s service delivery is optimised to deliver agreed community outcomes
and levels of service, manage related risks, and optimise expenditure over the entire life cycle of the
service delivery, using appropriate assets as required.
The Asset Management Policy equires that the management of assets be in a systematic process to
guide planning, acquisition, operation and maintenance, renewal and disposal of the required assets.
Delivery of service is
required to
be sustainable in the long term and deliver onn Council’s economic,
environmental, social, and cultural objectives.
This Asset Management Policy sets the appropriate level of asset management
Community Services
Activity.
practice for Council’s
5.3.2
Asset Management Policy Principles
The following principles will be used by Council to guide asset management planning and decision
making:
• Effective consultation to determine appropriate Levels of Service
• Ensuring service delivery needs form the basis of asset management
• Integration of
asset management with corporate, financial, business b andd budgetary planning
using activity management plans and Council’s LTCCP to demonstrate thiss
• Integration of
asset management within Council’ s strategic, tactical and operational planning
frameworks
• Informed decision making
taking a lifecycle management and inter-generational approach to
asset planning
• Transparent and accountable asset management
decision making
• Sustainable management providing for present needs whilst sustaining resources for f future
generations
5.3.3
Policy Linkages to Other Plans
This Asset Management Policy
links to Council’s LTCCP, Walkway Policy, Community
Strategic
Plans and Reserve Management Plans.
Facilities
5.3.4
Structured
Assessment of Asset Management Practice
Council has undertaken a structured assessment of the appropriate level off asset management
practice for the Community Services assets. This structured assessment follows the guidance
providedd in Section 2.2.4 of the International Infrastructure Management Manual. The results of this
assessment are shown in Table 5.3: Community Services Factor Assessment Results below.
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 23
Version 3.0
Selecting the Appropriate AM Level
Table 5.3: Community Services Factor Assessment Results
Criteria
Population
Assessment
Core
Commentary
The initiall population risk screen for urban areas, all township
populations, and total district population showed that assett
management practice
should be ‘Core’
District Wide
Risks
Costs and Benefits
Core
$0.7M
(3% of total
HDC
Based on the identified district wide risk factors, the suggested
level of appropriate asset management practice should be ‘Core’
The Parkss and Property operations budgets are relatively small in
terms of Council expenditure and represents minor risks if AM
practice iss not at an appropriate level
operating
costs)
Legislative
Requirements
Compliance
approach
Hurunui District Council policy is too meet minimum legislative
requirements, or exceed requirements where deemed appropriate
and cost effective through Levels of Service Consultation
Size, Condition,
Complexity of
Assets
Risks
Associated with
Failures
Average
Generally
lower and
isolated level
of risk
A simple but varied approach is equired givenn the range of
assets involved
Good dataa now held on assets and condition
Overall risks associated with asset failure are well understood
and have been assessed to be loww with the exceptiion of playgrounds,
which have higher associated risks
Organisational
Skills and
Resources
Average Hurunui District Council comprisess a small organisation serving a
large areaa of small communities
The organisation is comfortably resourced withh a range of
experienced staff, staff are stable and there are very few
vacancies. Services are deliveredd through a combination of inhigh
house teams and Contractors
This approach would be consistent with a ‘Core’ approach
Customer
Expectations
Average + The District has a range of community assets that are of a
standard and the community is justifiably proudd of them, and has
high expectations of the development and maintenance
Levels of service are well understood and an increase in
expectations has been
observed over o time
This increase is particularly evident in Hanmerr Springs and
rural-
of
residential areas where ‘City values’ reflected in expectations
those whoo shift into the district fromm Christchurch
Sustainability
Final AM
Level
No
Corporate
Policy at this
stage, part of
AMP and
planning
process at
activity level
Core
Overall customer expectations aree judged to be medium to
high
and the trend of increasing customer expectation is likely. This
suggests a requirement for well developed asset management
practice too consistently meet community expectations in the long
term
Council iss still in the process of developing its sustainability
policies. This will include incorporating legislative changes
and
the any national or regional policies or plans
Any impact of these on asset management practice will be
incorporated into the next review of o Asset Management Policies
Analysis of factors suggests that asset management practice
should bee Core
Page 24
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
5.3.5
Implementation and Review of Policy
This Asset Management Policy will be implemented in conjunction with w the 20088 Asset Management
Plans and 2009 LTCCP. This
Asset Management Policy may equire revieww once Council has
completed the development of its
Sustainability Policies.
This next full review of this Asset Management Policy shall be completed in Junee 2011 (3 years) prior
to completing asset plan updates
to support the 2012 LTCCP.
5.3.6
Asset Management Implementation Strategy
Council staff have completed a detailed analysis of appropriate asset management practice within the
guidance
offered by
this Policy. This analysis has examined asset description, levels off service,
managing growth, risk management, asset t lifecycle decision making, financial forecasts, planning
assumptions and confidence levels, improvement programmes, use of qualified persons and
Council
commitment to asset
management planning.
From this detailed analysis Council’s level of achievement and
management practice were identified.
any gaps
in appropriate asset
Asset management practice gaps that weree noted have
been transferred to thee Asset Management
Improvement Programme for action.
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 25
Version 3.0
Selecting the Appropriate AM Level
5.4 Solid Waste
The Hurunui District Council Asset Management Policy Statementt for the Solid Waste Activity is
outlined below. It is
intended that this Policy Statement be added to the introduction of the Activity
Management Plan, to
set the direction of the Solid Waste
Asset Management process.
5.4.1
Objective of the Solid Waste Asset Management Policy
The objective of the Hurunui District Council’ss Asset Management Policy for the Solid Waste Activity is
to ensure that Council’s servicee delivery iss optimised to deliver agreed community outcomes and
levels of
service, manage related risks, and optimise expenditure over the entire life cycle of the
service delivery, using appropriate assets as required.
The Asset Management Policy equires that the management of assets be in a systematic process to
guide planning, acquisition, operation and maintenance, renewal and disposal of the required assets.
Delivery of service is
required to
be sustainable in the long l term and deliver onn Councils economic,
environmental, social, and cultural objectives.
This Asset Management Policy sets the appropriate level of asset management
Solid Waste Activity.
practice for Council’s
5.4.2
Asset Management Policy Principles
The following principles will be used by Council to guide asset management planning and decision
making:
• Effective consultation to determine appropriate Levels of Service
• Ensuring service delivery needs form the basis of asset management
• Integration of
asset management with corporate, financial, business b andd budgetary planning
using activity management plans and Council’s LTCCP to demonstrate thiss
• Integration of
asset management within Council’ s strategic, tactical and operational planning
frameworks
• Informed decision making
taking a lifecycle management and inter-generational approach to
asset planning
• Transparent and accountable asset management
decision making
• Sustainable management providing for present needs whilst sustaining resources for f future
generations
5.4.3
Policy Linkages to Other Plans
This Asset Management Policy links to Council’s LTCCP and Waste ManagementM
t Plan 2005.
5.4.4
Structured
Assessment of Asset Management Practice
Council has undertaken a structured assessment of the appropriate level off asset management
practice for the Solid Waste assets. This structured assessment follows f the guidance provided in
Section 2.2.4 of the International Infrastructure Management Manual. The results of this assessment
are shown in Table 5.4: Solid Waste Factor Assessment
Results below.
Table 5.4: Solid Waste Factor Assessment Results
Criteria
Population
Assessment
Core
Commentary
The initiall population risk screen for urban areas, all township
populations, and total district population showed that assett
management practice
should be ‘Core’
Page 26
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
Criteria
Assessment
District Wide
Core
Risks
Costs and $0.8M**
Benefits (3% of total
HDC
operating
costs)
Commentary
Based on the identified district wide risk factors, the suggested
level of appropriate asset management practice should be ‘Core’
The Parkss and Property operations budgets are relatively small in
terms of Council expenditure and represents minor risks if AM
practice iss not at an appropriate level
** excludes household collection costs
Legislative
Requirements
Size, Condition,
Complexity of
Assets
Risks
Associated with
Failures
Organisational
Skills and
Resources
Customer
Expectations
Sustainability
Final AM
Level
Compliance
approach
Low
Low level of
risk
Average
Average +
No
Corporate
Policy at this
stage, part of
AMP and
planning
process at
activity level
Core
Hurunui District Council policy is too meet minimum legislative
requirements, or exceed requirements where deemed appropriate
and cost effective through Levels of Service Consultation
For Solid Waste services a level of o service approach is being
followed which is generally ahead of legislationn
Few assets – five transfer stations, closed landfills
Community facilitated recycling activities
Given thee limited assets involved, overall riskss associated with
asset failure have been assessed to be low
Hurunui District Council comprisess a small organisation serving a
large areaa of small communities
The organisation is comfortably resourced withh a range of
experienced staff, staff are stable and there are very few
vacanciess Services are delivered through t a combination off inhigh
house teams and Contractors
This approach would be consistent with a ‘Core’ approach
The District has a range of community assets that are of a
standard and the community is justifiably proudd of them, and has
high expectations of the development and maintenance
Levels of service are well understood and an increase in
expectations has been
observed over o time
This increase is particularly evident in Hanmerr Springs and
rural-
of
residential areas where ‘City values’ reflected in expectations
those whoo shift into the district fromm Christchurch
Overall customer expectations aree judged to be medium to
high
and the trend of increasing customer expectation is likely. This
suggests a requirement for well developed asset management
practice too consistently meet community expectations in the long
term
Council iss still in the process of developing its sustainability
policies. This will include incorporating legislative changes
and
the any national or regional policies or plans
Any impact of these on asset management practice will be
incorporated into the next review of o Asset Management Policies
Analysis of factors suggests that asset management practice
should bee Core
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 27
Version 3.0
Selecting the Appropriate AM Level
5.4.5 Implementation and Review of Policy
This Asset Management Policy will be implemented in conjunction with w the 20088 Asset Management
Plans and 2009 LTCCP. This
Asset Management Policy may equire revieww once Council has
completed the development of its
Sustainability Policies.
This next full review of this Asset Management Policy shall be completed in Junee 2011 (3 years) prior
to completing asset plan updates
to support the 2012 LTCCP.
5.4.6
Asset Management Implementation Strategy
Council staff have completed a detailed analysis of appropriate asset management practice within the
guidance
offered by
this Policy. This analysis has examined asset description, levels off service,
managing growth, risk management, asset t lifecycle decision making, financial forecasts, planning
assumptions and confidence levels, improvement programmes, use of qualified persons and
Council
commitment to asset
management planning.
From this detailed analysis Council’s level of achievement and
management practice were identified.
any gaps
in appropriate asset
Asset management practice gaps that weree noted have
been transferred to thee Asset Management
Improvement Programme for action.
Page 28
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
6.0
DETAILED ANALY
YSIS OF
ASSET
GROUPS
The following tables are provided for internal Council use to set in detail d appropriate practice levels,
and assess compliance to that practice and any AM practice gaps.
The tables are based
on IIMM figure 2.2.4 “Criteria for Assessing Conformity to “Core” and “Advanced”
Levels of Asset Management in New Zealand.”
The recommended process is identified below.
Step One
Identify the Appropriate Level of AM, as outlined in Sections 1-4
• For ‘Core’ AM
- all Core assessment criteria are relevant (indicated Bright Green)
• For ‘Core Plus’ - all Core assessment criteria are relevant (indicatedd Bright Green) and
additional criteria will be
relevant. The additional criteria have been identified during the
workshop to determine the Appropriate Level of AM (the additional criteria are indicated Light
Green)
• For ‘’Comprehensive’ or ‘Advanced‘ AM all assessment criteria are relevant (indicated Bright
Green)
Step Two
Undertake a compliance status analysis.
This involves the Asset or Activity Managerr assessing current performance in terms of each of the
assessment criteria. This may be done withh the assistance of the asset a or Activity Plan Writer if this
appropriate.
Once the
current performance is assessed the compliance gaps can be b identified. .
Step Three
Following the assessment of practice gaps this information can be transferred too the Asset or Activity
Management Plan improvement
programme. . It is expected that this assessment
a
would be undertaken
by the individual Activity Plan Writers and Activity Managers.
Example
A worked
example follows to illustrate the process (data is for illustrative purposess only).
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 29
Version 3.0
Selecting the Appropriate AM Level
Relevant
Assessment Criteria
Core criteria
Additional relevant criteria
Compliance Key
Fully compliant
S Substantially compliant
P Partially compliant
Does not comply
SAMPLE DATA ONLY
Description of Assets
Core
Advanced
Assessment Criteria (as outlinedd in IIMM)
Process of Development
Adequate Description of Asset
Financial Description of Assett
Remaining useful life
Aggregate & Disaggregate Information
Reliable Physical inventory
- Physical attributes (location,, material, age etc)
- Systematic monitoring of condition
- Systematic measurement performance
- Utilisation/capacity
Relevance
Compliancee Status Analysis
Current Compliance
Performance
Gaps
P
S
Footpath data
incomplete
Traffic counts
for some roads
only
Notes
RAMM & dTIMS
fully operational
RAMM & dTIMS
fully operational
Footpath survey
underway (2008)
RAMM Rating &
FWD
Traffic Counts 3yr
cycle, counts
for all
roads will be
completed in
2010
Page 30
Final
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
6.1
Land Transport
Relevant
Assessment
Criteria
Core criteria
Additional relevant criteria
Compliance Key
Fully compliant
S Substantially compliant
P Partially compliant
Does not comply
Description of
Assets
Core
Advanced
Levels of Service
Core
Table 6.1: Land Transport
Detailed Assett Management Practice Assessment
Assessment Criteria (as outlined in IIMM)
Process of Development
Adequate Description of Asset
Financial Description of Asset
Remaining useful life
Aggregate & Disaggregate Information
Reliable Physical inventory
- Physical attributes (location, material, age etc)
- Systematic monitoring of condition
- Systematic measurement performance
- Utilisation/capacity
Define LOS or performance
Linkage to strategic/community outcomes
Links to other planning documentss
Levels of consultation identified and agreement
Service life of network stated
Relevancee
Compliance C Status Analysis
Current Compliance Gaps
Performance
S
S
S
S
S
S
S
S
P
P
P
P
Data needed on
‘other structures’
Data needed on
‘other structures’
Data needed on
‘other structures’
Data needed on
‘other structures’
Data needed on
‘other structures’
Data needed on
‘other structures’
Data needed on
‘other structures’
Show linkages in
AMP
Regional linkages
to be shown
Outline
consultation
undertakenn
(LTCCP Ward
Meetings and AP)
Notes
RAMMM and Opus
Database for Bridges
Annual Valuation/Review
Annual Valuation/Review
RAMMM managed by
Maunsell
Sealed roads only
Sealed roads only, some
FWD survey and model in
place
Sealed roads only
Programme in place (all
roadss >40vpd every 5
years, major rotes
annually)
Shown in LTCCP
Annual Valuation/Review
January 2009
Final
Annex V Setting the Level of Roading Asset Management
Page 31
Version 3.0
Selecting the Appropriate AM Level
Assessment Criteria (as outlined in IIMM)
For Significant Services
- Evaluating LOS
Options
- Consult LOS options with community
Advanced
Managing
Growth
Core
Advanced
Risk
Management
Core
Advanced
Lifecycle
Decision Making
Core
Advanced
Page 32
- Adoption LOS & Standards afterr consultation
- Public communication of servicee level
- Monitoring & public reporting
AMP's reflect agreed LOS & how service s is delivered
Demand Forecasts (10 year)
Demand Management drivers
Demand Management strategies
Sustainability Strategies
Forecasts include
factors that comprise demand
Sensitivity of asset development (Capital Works) to
demand changes
Asset Utilisation/ Demand Modelling
Identify critical assets
Identify significant negative effectss
Identify associated risks and RM strategies s
Recognition & application of principles of integrated
risk management to assets
Apply standards & industry good practice p
RM integrated with Lifelines, disasters d recovery,
Continuity plans,.
Strategies for critical assets to include mitigationn –
CORE
Integrate
with maintenance and replacement
strategies
Lifecycle and Asset Management Practices
Service capacity gap analysis
Evaluation and ranking based onn criteria of options
for significant capital invest decisions for
Maintenance Outcomes, Strategies, Standards and
Plan
Identify options for asset maintenance to achieve
optimal costs over life of asset
- Apply agreed evaluation toolss to prioritise work
programmes
- Predictive modelling to support long-term l financial
forecasts for maintenance, renewals & new capitall
Significant negative effects
Relevancee
Final
Compliance C Status Analysis
Current Compliance Gaps
Notes
Performance
P Outline options
and consulltation
in AMP
P Outline options
and consulltation
in AMP
P Outline option and
consultation in
AMP
Demonstrate
through 2009-19
LTCCP
Demonstrate
through 2009-19
LTCCP
P Update approach
following
consultation
?
P Document in AMP
P Document in AMP
P Document in AMP
P Document in AMP
P Continue
development and
outline in AMP
P Continue
development and
outline in AMP
Specific data in AMP
section R4
Strategic routes have been
identified (integrated with
NZTA)
Lifelines undertaken
RAMMM TSA, Initial dTIMS
analysis
January J 2009
Annex V Setting the Level of Roading Asset Management
Version 3.0
Roading Activity Managementt Plan
Assessment Criteria (as outlined in IIMM)
Financial
10 year Financial plan – Maintenance, Renewals,
Forecasts
New Capital (LOS
and demand).
Validate the Depreciation/Decline in Service
Core
Potential
Translate operational, planned maint, renewal & new
work into financial terms over period of strategic plan
Advanced
Provide consistent financial forecasts & Substantiate
Sensitivity of forecasts
Planning
Assumptions
List all assumptions and possible effects e
and Confidence
Levels
Confidence level on asset condition, performance
Accuracy of asset
inventory
Core
Confidence level demand/growth forecasts f
Confidence level on financial forecasts
List all assumptions including organisations strategic
plan that support AM – linkages with other planning
doc
Confidence levels
(IIMM 4.3.7)
- Inventory Data
Critical Assets (Grade 1)
Advanced
Non Critical Assets (Grade 2)
- Condition Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or o 3)
- Performance Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or o 3)
Outline
Identify
improvements to AM
processes &
Improvement
Programmes
techniques
Identify weak areas & how they will be addressed
Core
Timeframes for improvements
Identify resourcess required (human & financial)
Improvement programmes are monitored against
KPI’s
Advanced
Previous improvements identified and formally
reported against KPI’s
Planning by
AM Planning should be undertaken by a suitably
qualified persons
qualified person
Core &
Process should be Peer reviewed
Advanced
Plan adopted by Council including improvement
Commitment
programme
Plan key tool to support LTCCP
Core
AM Plan regularly updated and should reflect
progress on improvement plan
AM Plan requirements are beingg implemented and
discrepancies formally reported
AM Plans evolving as AM systems provide better
Advanced
information
AM Plans updated every 3 years along with
organisations strategic planning cycles
Council has defined the Appropriate AM Practice itt is
adopting
Relevancee
Compliance C Status Analysis
Current Compliance Gaps
Performance
?
?
?
?
P
Completedd AMP
to Council for
adoption
Notes
Internal review process by
plan writers regarded as
adequate
Aim too do this – may be
compromised by
resourcing
January 2009
Final
Page 33
Annex V Setting the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
6.2 Utilities
Relevant Assessment Criteria
Core criteria
Additional relevant criteria
Compliance Key
Fully compliant
S Substantially
compliant
P Partially compliant
Does not comply
Description of
Assets
Core
Advanced
Levels of Service
Core
Advanced
Managing Growth
Core
Table 6.2: Utilities Detailed Asset Management Practice Assessment
Assessment Criteria (as outlined in IIMM)
Process of Development
Adequatee Description of Asset
Financial Description of Asset
Remaining useful life
Aggregate & Disaggregatee Information
Reliable Physical inventory
- Physical attributes (location, material, age etc)
- Systematic monitoring of o condition
- Systematic measurement performance
- Utilisation/capacity
Define LOS or performance
Linkage to strategic/community outcomes
Links to other planning documents
Levels of
consultation identified and agreement
Service life of network stated
For Significant Services
- Evaluating LOS Optionss
- Consult
LOS options with community
- Adoption LOS & Standards after consultation
- Public communication of o service level
- Monitoring & public reporting
AMP's reflect agreed LOS
& how service iss delivered
Demand Forecasts (10 year)
Demand Management drivers
Demand Management strategies
Sustainability Strategies
Relevance
Compliance Status Analysis
Current Compliance Gaps
Performance
S
S
S
S
P
Held in BizeAsset
some minor
updating required
Held in BizeAsset
some minor
updating required
Held in BizeAsset
some minor
updating required
Notes
Ongoingg
development of
sustainability
practice
in
accordance with
changing
national
legislative
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Roading Activity Management Plan
Advanced
Assessment Criteria (as outlined in IIMM)
Forecastss include factors that comprise demand
Sensitivity
of asset development (Capital Works) to
demand changes
Asset Utilisation/ Demandd Modelling
Relevance
Compliance Status Analysis
Current Compliance Gaps
Performance
Notes
requirements:
- Climate
change
- Emissions
Trading
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Assessment Criteria (as outlined in IIMM)
Risk Managementt
Core
Advanced
Lifecycle Decision
Making
Core
Identify critical assets
Identify significant negative effects
Identify associated risks and a RM strategiess
Recognition & applicationn of principles of f integrated risk
management to assets
Apply standards & industry good practice
RM integrated
with Lifelines, L disasters recovery,
Continuity
plans,.
Strategies for critical assets to include mitigation – CORE
Integrate with maintenance and replacement strategies
Lifecycle and Asset Management Practices
Service capacity gap analysis
Evaluation and ranking based b on criteriaa of options for
significant capital invest decisions for
Maintenance Outcomes, Strategies, Standards and Plan
Relevance
Compliance Status Analysis
Current Compliance Gaps
Performance
P Need to enter
against assets in
BizeAsset.
S Further risk
management
integration withh
corporate
strategies
Notes
New capital
identified for
Amberley
following
District
Plan changes
Advanced
Financial Forecasts
Core
Advanced
Planning
Assumptions and
Confidence Levels
Core
Advanced
Identify options for asset maintenance to achieve optimal
costs over life of asset
- Apply agreed evaluation tools to prioritise work
programmes
- Predictive modelling to support s long-termm financial
forecasts for maintenance, renewals & neww capital
Significant negative effects
10 year Financial plan – Maintenance, Renewals, New
Capital (LOS and demand).
Validate the Depreciation/ /Decline in Service Potential
Translate
operational, planned maint, renewal & new
work into financial terms over o period of strategic plan
Provide consistent financial forecasts & Substantiate
Sensitivity
of forecasts
List all assumptions and possible p effects
Confidence level on assett condition, performance
Accuracy
of asset inventory
Confidence level demand/ /growth forecastss
Confidence level on financial forecasts
List all assumptions including organisations strategic
plan that support AM – linkages with otherr planning doc
Confidence levels (IIMM 4.3.7) 4
- Inventory Data
Critical Assets (Grade 1)
Non Critical Assets (Grade 2)
- Condition Data
Critical Assets (Grades 1 or 2)
Annex V Settingg the Level of Roading Asset Management
S
S
Based on desktop
& field operatorr
experience. Some
testing of AC pipes
required in next 10
years to confirm.
Version 3.0
Roading Activity Management Plan
Assessment Criteria (as outlined in IIMM)
Non Critical Assets (Grades 1, 2 or 3)
- Performance Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or 3)
Relevance
Compliance Status Analysis
Current Compliance Gaps
Performance
Notes
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Assessment Criteria (as outlined in IIMM)
Outline Improvement
Programmes
Core
Advanced
Planning by Qualified
Persons
Core & Advanced
Commitment
Core
Advanced
Identify improvements to AM processes & techniques
Identify weak areas & how
they will be addressed
Timeframes for improvements
Identify resources required (human & financial)
Improvement programmess are monitored against KPI’s
Previous improvements identified and formally reported
against KPI’s
AM Planning should be b undertaken by a suitably
qualified person
Process should be Peer reviewed
Plan adopted by Council
including improvement
programme
Plan key tool to support LTCCP
AM Plan regularly updated and should reflect progress
on improvement plan
AM Plan
requirements are being implemented and
discrepancies formally reported
AM Plans evolving as AM systems provide better
information
AM Plans updated every e 3 yearss along with
organisations strategic planning cycles
Council has defined the Appropriate AMM Practice it is
adopting
Relevance
Compliance Status Analysis
Current Compliance Gaps
Performance
P
Completed AMP to
Council for
adoption
Notes
AM
Improvement
Plan
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Roading Activity Management Plan
6.3
Community Services
Relevant Assessment Criteria
Core criteria
Additional relevant criteria
Compliance Key
Fully compliant
S Substantially
compliant
P Partially compliant
Does not comply
Table 6.3: Community
Services Detailed Asset Management Practice Assessment
Assessment Criteria (as outlined in IIMM)
Relevance
Description of Assets
Processs of Developmentt
Adequate Description of Asset
Financial Description of Asset
Core Remaining useful life
Aggregate & Disaggregate Information
Reliablee Physical inventory
- Physical attributes (location, material, age etc)
Advanced - Systematic monitoring of condition
- Systematic measurement performancee
- Utilisation/capacity
Levels of Service Define LOS or performance
Linkage
to strategic/community outcomess
Links to other planning documents d
Core
Levels of consultation identified and agreement
Service life of network stated
For Significant Services
- Evaluating LOS Options
- Consult LOS options with community
Advanced - Adoption LOS & Standards after consultation
- Public
communication of service level
- Monitoring & public reporting
AMP's reflect agreed LOS & how servicee is delivered
Managing Growth
Demand
Forecasts (10 year) y
Demand
Management drivers
Core Demand
Management strategies
Sustainability Strategies
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Assessment Criteria (as outlined in IIMM)
Forecasts include factorss that comprise demand
Advanced
Sensitivity of asset development (Capital Works) to
demandd changes
Asset Utilisation/ Demand Modelling
Risk Managementt
Identify critical assets
Identify significant negative effects
Core Identify associated risks and RM strategies
Recognition & application of principles of integrated risk
management to assets
Apply standards & industry good practicee
Advanced RM integrated
Continuity plans,.
with Lifelines, disasters recovery, ,
Strategies for critical assets to include mitigation – CORE
Integrate with maintenance and replacement strategies
Lifecycle Decision
Making
Lifecyclee and Asset Management Practices
Service capacity gap analysis
Evaluation and ranking based on criteria of options for
Core
significant capital invest decisions for
Maintenance Outcomes, , Strategies, Standards and Plan
Relevance
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Advanced
Financial Forecasts
Core
Advanced
Identify options for assett maintenance too achieve optimall
costs over life of asset
- Apply agreed evaluation tools to prioritise work
programmes
- Predictive modelling too support long-term financial
forecasts for maintenance, renewals & new capital
Significant negative effects
10 year
Financial plan – Maintenance, Renewals, New
Capital (LOS and demand).
Validate
the Depreciation/Decline in Service Potential
Translate operational, planned p maint, renewal & new
work into financial terms over period of strategic plan
Provide consistent financial forecasts & Substantiate
Sensitivity of forecasts
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Roading Activity Management Plan
Assessment Criteria (as outlined in IIMM)
Relevance
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Planning Assumptions
and Confidence Levels
Core
Advanced
Outline Improvement
Programmes
Core
Advanced
Planning by Qualified
Persons
Core & Advanced
Commitment
Core
Advanced
List all assumptions and possible effects
Confidence level on asset condition, performance
Accuracy of asset inventory
Confidence level demand/growth forecasts
Confidence level on financial forecasts
List all assumptions ncluding organisations strategic
plan that support AM – linkages with other planning doc
Confidence levels (IIMM 4.3.7)
- Inventory Data
Critical Assets (Grade 1) )
Non Critical Assets (Grade 2)
- Condition Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or 3)
- Performance Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or 3)
Identify improvements too AM processes & techniques
Identify weak areas & how they will be addressed
Timeframes for improvements
Identify resources required (human & financial)
Improvement programmes are monitoredd against KPI’s
Previous improvements identified and formally reported
against KPI’s
AM Planning should be undertaken by a suitably
qualified
person
Processs should be Peer reviewed
Plan
adopted by Council
includingg
improvementt
programme
Plan key
tool to support LTCCP
AM Plan regularly updated and should reflect progresss
on improvement plan
AM Plan requirementss are being implemented and
discrepancies formally reported
AM Plans evolving ass AM systems provide better
information
AM Plans
updated every 3 years along with
organisations strategic planning p cycles
Council has defined thee Appropriate AM Practice it is
adopting
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
6.4 Solid Waste
Relevant Assessment Criteria
Core criteria
Additional relevant criteria
Compliance Key
Fully compliant
S Substantially
compliant
P Partially compliant
Does not comply
Table 6.4: Solid Waste
Detailed Asset Management Practice Assessment
Assessment Criteria (as outlined in IIMM)
Relevance
Description of Assets
Processs of Developmentt
Adequate Description of Asset
Financial Description of Asset
Core Remaining useful life
Aggregate & Disaggregate Information
Reliablee Physical inventory
- Physical attributes (location, material, age etc)
Advanced - Systematic monitoring of condition
- Systematic measurement performancee
- Utilisation/capacity
Levels of Service Define LOS or performance
Linkage
to strategic/community outcomess
Links to other planning documents d
Core
Levels of consultation identified and agreement
Service life of network stated
For Significant Services
- Evaluating LOS Options
- Consult LOS options with community
Advanced - Adoption LOS & Standards after consultation
- Public
communication of service level
- Monitoring & public reporting
AMP's reflect agreed LOS & how servicee is delivered
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Roading Activity Management Plan
Managing Growth
Core
Advanced
Risk Managementt
Core
Advanced
Lifecycle Decision
Making
Core
Assessment Criteria (as outlined in IIMM)
Demand
Forecasts (10 year) y
Demand
Management drivers
Demand
Management strategies
Sustainability Strategies
Forecasts include factorss that comprise demand
Sensitivity of asset development (Capital Works) to
demandd changes
Asset Utilisation/ Demand Modelling
Identify critical assets
Identify significant negative effects
Identify associated risks and RM strategies
Recognition & application of principles of integrated risk
management to assets
Apply standards & industry good practicee
RM integrated
with Lifelines, disasters recovery, ,
Continuity plans,.
Strategies for critical assets to include mitigation – CORE
Integrate with maintenance and replacement strategies
Lifecyclee and Asset Management Practices
Service capacity gap analysis
Evaluation and ranking based on criteria of options for
significant capital invest decisions for
Maintenance Outcomes, , Strategies, Standards and Plan
Relevance
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Advanced
Financial Forecasts
Core
Advanced
Identify options for assett maintenance too achieve optimall
costs over life of asset
- Apply agreed evaluation tools to prioritise work
programmes
- Predictive modelling too support long-term financial
forecasts for maintenance, renewals & new capital
Significant negative effects
10 year
Financial plan – Maintenance, Renewals, New
Capital (LOS and demand).
Validate
the Depreciation/Decline in Service Potential
Translate operational, planned p maint, renewal & new
work into financial terms over period of strategic plan
Provide consistent financial forecasts & Substantiate
Sensitivity of forecasts
Annex V Settingg the Level of Roading Asset Management
Version 3.0
Selecting the Appropriate AM Level
Assessment Criteria (as outlined in IIMM)
Planning Assumptions
List all assumptions and possible effects
and Confidence Levels
Relevance
Compli
Current
Performance
ance Status Analysis
Compliancee
Gaps
Notes
Core
Advanced
Outline Improvement
Programmes
Core
Advanced
Planning by Qualified
Persons
Core & Advanced
Commitment
Core
Advanced
Confidence level on asset condition, performance
Accuracy of asset inventory
Confidence level demand/growth forecasts
Confidence level on financial forecasts
List all assumptions ncluding organisations strategic
plan that support AM – linkages with other planning doc
Confidence levels (IIMM 4.3.7)
- Inventory Data
Critical Assets (Grade 1) )
Non Critical Assets (Grade 2)
- Condition Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or 3)
- Performance Data
Critical Assets (Grades 1 or 2)
Non Critical Assets (Grades 1, 2 or 3)
Identify improvements too AM processes & techniques
Identify weak areas & how they will be addressed
Timeframes for improvements
Identify resources required (human & financial)
Improvement programmes are monitoredd against KPI’s
Previous improvements identified and formally reported
against KPI’s
AM Planning should be undertaken by a suitably
qualified
person
Processs should be Peer reviewed
Plan
adopted by Council
includingg
improvementt
programme
Plan key
tool to support LTCCP
AM Plan regularly updated and should reflect progresss
on improvement plan
AM Plan requirementss are being implemented and
discrepancies formally reported
AM Plans evolving ass AM systems provide better
information
AM Plans
updated every 3 years along with
organisations strategic planning p cycles
Council has defined thee Appropriate AM Practice it is
adopting
» » End of Roading Activity
Management Plan