Berlin Conference On The Human Dimensions Of - Rocky Mountain ...
Berlin Conference On The Human Dimensions Of - Rocky Mountain ...
Berlin Conference On The Human Dimensions Of - Rocky Mountain ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cost of saved or supplied electricity, 2004 US¢/kWh (Savings: 12-y av. life,<br />
4%/y real discount rate; Supply: merchant cashflow model or market empirical;<br />
wind: 30-y life, 4%/y real; cogeneration: 25-y life, 4%/y real)<br />
10<br />
–5<br />
↑↑↑↑↑↑↑↑↑<br />
Keystone<br />
(6/07):<br />
10.3 to<br />
12.9¢<br />
5<br />
Central power stations’ fatal competitors<br />
Levelized cost of delivered electricity or end-use efficiency (zero distributed benefits); remote<br />
sources incur 2.75¢/kWh (1996 embedded IOU average) delivery cost, including grid losses<br />
Median price of 5.7 GW commissioned<br />
in 1999–2006, σ = 0.12¢;<br />
cheapest was >1.3¢ lower<br />
Actual costs depend on many site- and<br />
plant-specific factors; all costs on this<br />
chart are indicative.<br />
Remote <strong>On</strong>site<br />
Natural gas: 1 “MCF” (thousand cubic feet)<br />
~ 1.03 million BTU ~ 1.09 GJ<br />
all at levelized real prices<br />
kWh of coal-fired generation’s net carbon emissions displaceable per $0.10 spent:<br />
1.0 1.2–1.7 0.9–1.7 + 2.2–6.5 + 2.4–8.9 + >2–10 +<br />
Broader,<br />
esp.<br />
residential,<br />
and<br />
suboptimal<br />
programs<br />
Good<br />
business<br />
retrofits<br />
Nuclear (MIT) Coal (MIT)<br />
+ at least + $100/tC<br />
new 2005 carbon tax<br />
subsidies<br />
Combined-cycle 2003–04 wind, Combined-<br />
gas (MIT) firmed (0.6¢/kWh) cycle<br />
$4–7/MCF + integration (0.3¢) industrial<br />
+ $100/tC add back subsidy<br />
carbon tax (but ignore the<br />
BuildingscaleRecoveredheat<br />
industrial<br />
Optimized<br />
new<br />
installations<br />
(all sectors)<br />
probably bigger<br />
nuclear subsidies)<br />
$5–8/MCF gas<br />
Central stations, 2004 subsidies,<br />
expected 2012<br />
(some cost less now) Cogeneration (CHP) End-use<br />
no reserve margin; the official<br />
efficiency<br />
studies count only these<br />
www.rmi.org/sitepages/pid171.php#E05-14, -15; LBL-41435