26.10.2012 Views

Berlin Conference On The Human Dimensions Of - Rocky Mountain ...

Berlin Conference On The Human Dimensions Of - Rocky Mountain ...

Berlin Conference On The Human Dimensions Of - Rocky Mountain ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cost of saved or supplied electricity, 2004 US¢/kWh (Savings: 12-y av. life,<br />

4%/y real discount rate; Supply: merchant cashflow model or market empirical;<br />

wind: 30-y life, 4%/y real; cogeneration: 25-y life, 4%/y real)<br />

10<br />

–5<br />

↑↑↑↑↑↑↑↑↑<br />

Keystone<br />

(6/07):<br />

10.3 to<br />

12.9¢<br />

5<br />

Central power stations’ fatal competitors<br />

Levelized cost of delivered electricity or end-use efficiency (zero distributed benefits); remote<br />

sources incur 2.75¢/kWh (1996 embedded IOU average) delivery cost, including grid losses<br />

Median price of 5.7 GW commissioned<br />

in 1999–2006, σ = 0.12¢;<br />

cheapest was >1.3¢ lower<br />

Actual costs depend on many site- and<br />

plant-specific factors; all costs on this<br />

chart are indicative.<br />

Remote <strong>On</strong>site<br />

Natural gas: 1 “MCF” (thousand cubic feet)<br />

~ 1.03 million BTU ~ 1.09 GJ<br />

all at levelized real prices<br />

kWh of coal-fired generation’s net carbon emissions displaceable per $0.10 spent:<br />

1.0 1.2–1.7 0.9–1.7 + 2.2–6.5 + 2.4–8.9 + >2–10 +<br />

Broader,<br />

esp.<br />

residential,<br />

and<br />

suboptimal<br />

programs<br />

Good<br />

business<br />

retrofits<br />

Nuclear (MIT) Coal (MIT)<br />

+ at least + $100/tC<br />

new 2005 carbon tax<br />

subsidies<br />

Combined-cycle 2003–04 wind, Combined-<br />

gas (MIT) firmed (0.6¢/kWh) cycle<br />

$4–7/MCF + integration (0.3¢) industrial<br />

+ $100/tC add back subsidy<br />

carbon tax (but ignore the<br />

BuildingscaleRecoveredheat<br />

industrial<br />

Optimized<br />

new<br />

installations<br />

(all sectors)<br />

probably bigger<br />

nuclear subsidies)<br />

$5–8/MCF gas<br />

Central stations, 2004 subsidies,<br />

expected 2012<br />

(some cost less now) Cogeneration (CHP) End-use<br />

no reserve margin; the official<br />

efficiency<br />

studies count only these<br />

www.rmi.org/sitepages/pid171.php#E05-14, -15; LBL-41435

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!