milestone up to a maximum of ten working days. A lump sum of $1000.00<br />

shall be deducted for each working day this work is not successfully<br />

completed after the 270 working day milestone up to a maximum of ten (10 )<br />

working days.<br />

3. Installation of T-1 communications systems.<br />

This item shall be completed 300 working days after authorization to<br />

begin work. Completion shall include installation of all communications<br />

components, testing, making the system operational, and completion of al l<br />

associated clean-up required by the contract specifications is completed .<br />

Installation will not be considered until the entire T-1 communications<br />

system successfully passes all communication tests as outlined in the<br />

General Notes. Upon successful completion of this work within the<br />

specified time frame the contractor shall be paid a lump sum of $1000.00<br />

per working day for each working day the work is completed prior to the<br />

300 working day milestone up to a maximum of ten (10) working days. A<br />

lump sum of $1000.00 shall be deducted for each working day the work is<br />

not completed after the 300 working day milestone up to a maximum of ten<br />

(10) working days.<br />

4. Installation of Closed Circuit Television (CCTV) system.<br />

This item shall be completed 330 working days after authorization to<br />

begin work. Completion of this item of work shall include the complete<br />

installation, testing, synchronization, and making operational a cmplete<br />

CCTV system. Also included is all associated clean-up required by the<br />

contract specifications. Upon successful completion of this work within<br />

the specified time frame, the contractor shall be paid a lump sum of<br />

$1000.00 per working day for each day the work is completed prior to the<br />

330 working day milestone up to a maximum of ten (10) working days. A<br />

lump sum of $1000.00 shall be deducted for each working day the work is<br />

not completed after the 330 working day milestone up to a maximum of ten<br />

(10) working days.<br />

5. Interconnect to Transtar<br />

This item shall be completed 360 working days after authorization to<br />

begin work. Completion shall include successful transmission of video,<br />

voice, and data between the satellite building and Transtar, and all<br />

associated clean-up required by the contract specifications. Upon<br />

successful completion of this work within the specified time frame the<br />

contractor shall be paid a lump sum of $1000.00 per working day for each<br />

working day the work is completed prior to the 360 working day milestone<br />

up to a maximum of ten (10) working days. A lump sum of $1000.00 shall<br />

be deducted for each working day the work is not completed after the 360<br />

working day milestone up to a maximum of ten (10) working days.<br />

2-2 <strong>008</strong>---<strong>082</strong><br />

<strong>12</strong>-<strong>98</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!