04.01.2014 Views

Saeco Group 500 NEW OPERA TION AND ... - Espresso Italia

Saeco Group 500 NEW OPERA TION AND ... - Espresso Italia

Saeco Group 500 NEW OPERA TION AND ... - Espresso Italia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

English<br />

6.8.6 Payment system installation<br />

The machine does not have a payment system.<br />

Any possible damage to the vending machine<br />

itself and injury to people resulting from its<br />

incorrect installation are the responsibility of the<br />

installer of the payment system.<br />

- remove the support bracket from the machine<br />

(fig. 39)<br />

- hook the coiner unit to the support bracket<br />

(fig.40A)<br />

- fix the support bracket by means of the two<br />

knobs (fig. 40B)<br />

- connect the coiner unit to the CPU board.<br />

N.B.: The 24Vdc coin validator and the MDB<br />

systems have to be directly connected to the<br />

CPU board while the executive serial systems<br />

have to be connected to the CPU board through<br />

the supplied interface cable.<br />

The 12Vdc coin validators require a special<br />

interface board in order to be connected to the<br />

CPU board.<br />

- Then, access the programming for the<br />

correct settings.<br />

Refer to section '7 PROGRAMMING' to verify if<br />

the parameter setting is consistent with the<br />

system used.<br />

fig.39<br />

A<br />

B<br />

fig.40<br />

26<br />

<strong>Espresso</strong> <strong>Italia</strong> PTY LTD<br />

www.espressoitalia.com.au<br />

Freecall 1300 660 976

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!